Soil Quality Standards Randy L. Davis National Soils Program Leader USDA Forest Service March 30, 2006.

Slides:



Advertisements
Similar presentations
Lolo Creek Watershed Project #
Advertisements

The Committee and Research – Where are we and where might we be going?
Stewardship Contracting. Stewardship Contracting One contract Project completed in less time More service work performed Increased public support Reduction.
USDA FOREST SERVICE Technology & Development Program National Soil Quality Monitoring Field Guide.
Spruce Beetle Epidemic & Aspen Decline Management Response EIS Adaptive Implementation Process.
Roadless Area Conservation: National Forest System Lands in Idaho Proposed Rule www. roadless.fs.fed.us State of Idaho.
Overview of Significant Issues and Identified Alternatives for Draft Environmental Impact Statement: Produce Safety Rule Michael Mahovic, Ph.D. Produce.
USDA Forest Service. FS owns 8.5% of the total land area in United States.
Partnering for Healthy Forests Research and the Healthy Forests Restoration Act The Southern Pine Beetle Integrated Pest Management Program: A Coalition.
Thanks for joining us. We’ll be starting soon. To join the teleconference, dial , passcode # To download handouts : Click the Handouts.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Roles for Commodity Production in Sustaining Forests & Rangelands J. Keith Gilless Professor of Forest Economics UC Berkeley.
The Cooperative Forestry Assistance Act authorizes the USDA Forest Service to protect trees and forests from insects and diseases. This is accomplished.
1 Watershed Condition Framework Overview SEAKFHP Strategic Planning Meeting Sheila Jacobson, Fisheries Biologist October 2012.
Small Scale Salvage Program Application Process. Purpose To establish an application and approval process for small scale timber salvage that is efficient,
Effects of hillslope terracing on productivity and soil properties in semi-arid Ponderosa Pine habitat in Western Montana L. Cerise¹ ², D.S. Page-Dumroese¹,
Wayne National Forest and Scorecard Compliance Peter B Williams, PhD  Ecosystem Mgmt Coord. USDA-FS, Washington Office  Interim Forest Supervisor, June-Sept.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
EMS / NEPA Integration at the Idaho National Laboratory Bruce Angle & John Irving Battelle Energy Alliance Idaho National Laboratory Environmental Management.
Direction for Fire Management in Land Use Plan Revisions.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Centre for Non-Timber Resources Royal Roads University Victoria, BC Cost Benefit Analysis of Wildland Urban Interface Operations.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Stewardship Contracting Refresher Overall goal: Student will understand and apply the concepts associated with contracting authority.
UPPER MONUMENT CREEK LANDSCAPE RESTORATION Allan Hahn – District Ranger Mike Picard – ID Team Leader.
Progress Update: Evaluation of Federal Facilities in WIPs and Milestones CBPO Management Board March 6, Jim Edward, EPA Greg Allen, EPA.
Forest Certification Test Project on the Allegheny National Forest Evaluation - June 12-16, 2006 Report – July 15, 2007.
Monongahela National Forest
March 2008 FY 2008 Hazardous Fuels Program Direction Unified Targets/Accomplishments.
Feedback on the Draft EIS Myrtle HFRA Project 7/17/06.
Alachua County Forever Cattle Grazing Business Plan January 24, 2012.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
What we committed to do TreatmentUnits Treated without CFLRP Funding Units Treated with CFLRP Funding Prescribed Fire2,000 acres/year 14,000 acres *
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
Phase 3 Environmental Documentation Process SEQUOIA NATIONAL FOREST AND GIANT SEQUOIA NATIONAL MONUMENT.
Fuel Treatment Making a Difference Steve Harbert Tim Rich Burn Boss Refresher February Burn Boss Refresher 2009.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Southern California Forest Plan Revision and Environmental Management Systems (EMS)
TOWARDS THE APPRAISAL OF THE CUMULATIVE AND DYNAMIC IMPACT OF DISASTERS ADVISORY GROUP - FIRST MEETING INFORMATION AND INDICATORS PROGRAM FOR DISASTER.
Sierra Water Workgroup Water Summit Kings Beach, California June 11, 2013 Barry Hill, Hydrologist Pacific Southwest Region USDA Forest Service.
Lake Michigan Coastal Program Coastal 101 – 2007 Edition.
Forest Practices Code Transition Protection of Environmental Values Rod Davis Manager, Ecosystem Planning and Standards Ministry of Water, Land and Air.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
The Colorado Roadless Rule July 31, 2012 Hermosa Creek Roadless Area Trey Schillie US Forest Service: Rocky Mountain Region May 31, 2013.
Alaska Forest Association 58 th Annual Convention October 22, 2015 Earl Stewart Tongass NF Forest Supervisor Charley Streuli Fire, Aviation and Forest.
Watershed Analysis Presented to the Washington State Forest Practices Board By Mary McDonald and Marc Engel Department of Natural Resources, Forest Practices.
OWEB Effectiveness Monitoring Program Key Components  Effectiveness Monitoring Workshop  Development of definitions  Effectiveness Monitoring of: 
Monitoring and Evaluation. Objective Identify appropriate monitoring techniques. Identify approaches to evaluating plan implementation and effectiveness.
USDA Forest Service, Remote Sensing Applications Center, FSWeb: WWW: National Geospatial Fire.
Soil Management Randy L. Davis National Soils Program Leader USDA Forest Service March 30, 2006.
NEPA and WildernessNEPA and Wilderness Michael C. Blumm & Lorena Wisehart ‘13 Wilderness Act at 50 (April 11, 2014) Lewis and Clark Law School.
GOOD NEIGHBOR AGREEMENTS (AUTHORITY) MARCH 31, 2016.
Regional Peer Learning Workshop: Accelerated Landscape Restoration Siuslaw Stewardship Model and Collaborative Engagement.
EMS Takes Root in the Forest Service Federal Environmental Symposium East 2009 EMS Takes Root in the Forest Service Kurt Gernerd Assistant Director of.
Proposed Research Plan Fiscal Year Today’s Proposed Action Approve Fiscal Year Research Plan Allocate $6 million in four research.
Fire. Fire History & Ecology Fire is a disturbance that renews forests Fire is a disturbance that renews forests Some tree species require fire to regenerate.
Forest Planning and IRWMPs in the Sierra Nevada Sue Britting June 11, 2013.
“To take available technical, financial, and educational resources, whatever their source, and focus or coordinate them so that they meet the needs of.
2013 Range-wide Partner’s Accomplishment Report FY 2013 report published in Dec Report Outline Introduction (1 page) Partner and Program Success.
Department of Environmental Quality
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Iron Canyon Soil Monitoring
Prescribed Fire Effects Monitoring
Forest Products Industry Perspective on Stewardship Contracts
Small Scale Salvage Program
Health Impact Assessment in Michigan
WESTCAS Fall Conference Tuesday, October 23, 2018 Dick Fleishman
Alaska Roadless Rulemaking
Longleaf Regional Conservation Partnership Program
Presentation transcript:

Soil Quality Standards Randy L. Davis National Soils Program Leader USDA Forest Service March 30, 2006

Soil Quality Standards and Recent Court Decisions Outline of this presentation: Outline of this presentation:  FSM 2550/FSH 2509  Iron Honey Restoration Project  Lolo NF Post Burn Project  National SQS Monitoring Protocol Project

FSM 2550 – Soil Management  FSM 2554 – Soil Quality Monitoring  – Policy. Monitor the soil resource to detect significant changes in soil properties resulting from the implementation of management plans.

FSH Soil Management Handbook  FSH – Soil Quality Monitoring  2.04a – Regional Foresters  Develop soil quality standards  2.04b- Forest Supervisors  Approve soil quality monitoring plans  2.05 – Definitions  Soil productivity  Significant change: 15% reduction in soil productivity  Significant impairment: change will extend beyond planning horizon  Detrimental soil disturbance  2.2 – Soil Quality Standards  Base threshold values  ~15% reduction in soil productivity potential  Use as a guideline, use with judgment  More stringent guideline can be used where appropriate

Iron Honey Project Ruling Idaho Panhandle NF  The proposed watershed restoration project was to treat 1,408 acres across 14 watersheds including the removal of 17.5 million board feet of timber, reconstructing 29 miles of existing road, constructing.2 miles of new road and 2 miles of temporary road. ROD issued February  Highlights of the August 2004 U.S. Ninth Circuit Court Decision:  “The FS did not walk, much less test, the land in the activity area.”  “..., we hold that FS’s reliance on the spreadsheet models, unaccompanied by on-site spot verification on the model’s predictions, violate NFMA.”

Lolo NF Post Burn Project  The 74,000 acres had burned across the Lolo NF in the summer of  The proposed project included commercial thinning, prescribe burning, and salvage logging. The ROD was issued in July 2002  Highlights of the December 2005 U.S. Ninth Circuit Court Decision:  The Regional Soil Quality Standard:  “…the purpose of the Standard is to ensure compliance with the substantive mandates of NFMA.”  On-site Verification of Soil Conditions:  “…did not test much of the activity area.”  The analysis used data from areas with ecological characteristics similar to the proposed harvest units. This methodology was disqualified with the Iron Honey decision.  “…we conclude that the FS’s plan to verify its estimates post- decision fails to satisfy NEPA - “NEPA requires consideration of the potential impact of an action before the action takes place.”

National SQS Monitoring Protocol Project  Partners:  WO Ecosystem Management Coordination  Region 1  Rocky Mountain Research Station  Michigan Tech University  University of Idaho  Initial work begins April 2006  Concludes in FY2008  SQS Monitoring Protocol Technical Guide  Workplan includes:  Testing sampling methodologies  Remeasuring disturbed forested sites  Comparing against reference benchmark sites  Evaluation of the validity of the 15% reduction in soil productivity

Questions? Discussion