2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager Planning & Engineering
TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way Marion 3-OH-9 Intermodal
Current: 18 Blockages Per Day Impacts: MIC Trucks Senior Center Developmental Disabilities Center Baseball for Youth Problem/Issue Blocked Crossing Events Per Day Event Description# BlockagesTime Arriving/Departing train from Kansas City minutes Arriving/Departing train to North Baltimore minutes Arriving/Departing local lumber & auto minutes Arriving/Departing train to St Louis minutes Switching maneuvers for trains above minutes
Intermodal Site History
New Railroad Overpass Current configuration Proposed Improvement
FREIGHT CORRIDORS
Development MIC Freight ,340 Containers ,671 Containers ,866 Containers ,821 Containers ,000 Containers ,000 Containers expected
Budget & Funding Construction Cost Reduced by $4M PhaseEstimated Cost Preliminary Engineering$ 0.8 M Detailed Design$ 1.5 M R/W$ 1.5 M Construction$ 8 M TOTAL$ 11.8 M
Marion 3-OH-9 Intermodal TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way