NASA MSFC Engineering Directorate Mission Operations Laboratory Page 1 Bob SANA End of Meeting Summary.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Systems Engineering Management
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
EsMD Structured Content Use Case 2 WG Meeting Wednesday, April 25 th, 2012.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
System Engineering Area SANA BoF Kick-Off 12 May 2004 Peter Shames NASA/JPL.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
NEMO Re-chartering IETF 67 – November 9, 2006 T.J. Kniveton.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 16 January 2007 Colorado Springs, USA.
Constellation Space Transportation Planning Office July 30, 2009.
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
CCSDS SOIS Wireless Working Group (WWG) 04-Aug-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug New ESA Wireless WG member.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan.
Navigation WG Report D. Berry NASA J. Fertig ESA.
1 Approved Terms of Reference for HAPUA Working Group No.5-ESI Services Project 6 Bilateral Contract Benchmarking.
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Power of Choice (PoC) Program Overview
NASA/NSSDC Report to MOIMS DAI/IPR Plenary
Wireless WG Monthly Teleconference
CCSDS Systems Engineering Area: Security Working Group
Introductory Remarks and Meeting Goals
Space Communication Cross Support Architecture WG
SIS-DTN WG Wednesday Afternoon
Cross Support Architecture WG: Charter and Work Plan
Wireless WG Monthly Teleconference
Joint IPR/DAI Workshop
JAXA CCSDS Secretary Office
ESB Networks Market Release Meeting of the IGG, March 5th 2009
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Summary and Action Points
July 2010 doc.: IEEE /0xxxr0 A summary of proposed LS from IEEE 802 to 3GPP RAN/RAN1 on technical & process issues 26 July 2016 Authors: Name.
Presentation transcript:

NASA MSFC Engineering Directorate Mission Operations Laboratory Page 1 Bob SANA End of Meeting Summary  Executive Summary  Reviewed the ops concepts SCID, Heat Sensor and VoIP  Changed to SCID, XML Schema and Heat Sensor  Took action to create a White Paper on SCID future expansion to accommodate more spacecraft  Reviewed the SANA Action Plan and assigned actions (no major comments)  Cat 1 SCIDs and CA: MSFC  Cat 2 Current CCSDS Standards and Processes: JPL  Cat 3 Current WGs/SIGs/BoFs: Secretariat  Cat 4 All others: TBD  Resource: No international participation  Schedule requires changing with the creation of a white paper  Even though a review of the charter was scheduled it was not required due to the limited participation (everyone was familiar with it)  Progress Achieved  Clarified SANA scope addressing SCIDs and eventually unique numbering on a larger scale (phased)  SANA addresses numbers and names and addresses  Added a Glossary  Place emphasis on CCSDS related registry requirements first  SANA proposed implementation of a Registry of Registries was discussed  Discussion of Green/Magenta book was discussed deciding on a Green Book  Detailed discussion on ops concepts and suggestion to establish thread from the RoR to a detailed xml schema  Schedule

NASA MSFC Engineering Directorate Mission Operations Laboratory Page 2 Bob Old Schedule DateMilestone Mar 2006SANA WG Charter approved Aug 2006Requirements assessment complete Oct 2006Green Book Requirements Review complete Nov 2006Magenta Book complete Dec 2006 Statement of Work complete Jan 2007Statement of Work, Green and Magenta Books approved

NASA MSFC Engineering Directorate Mission Operations Laboratory Page 3 Bob Proposed New Schedule w/o White Paper Req t DescriptionOrgStart/Complete 1GProvide the mechanisms, processes and documentation required for a CCSDS registry capability MSFCJun 06/Jul 07 2Provide detailed requirements for a CCSDS registryMSFC/Jan 07 3Integrate current CCSDS registry processes into a unified standardized frameworkGSFC/Dec 06 4Propose a SANA advisory group and develop rules and processes including resources required MSFC/Mar 07 5Provide an assessment of charter cat for registry requirements in a Green Book/Dec 06 5aReview and analyze category 1MSFC/Nov 06 5bReview and analyze category 2JPL/Nov 06 5cReview and analyze category 3MSFC/Dec 06 5dReview and analyze category 4GSFC/Nov 06 6Present findings in an informal requirements review prior to further activitiesALL/Feb 07 7Document existing identifier spaces that CCSDS requires and identify any special constraints imposed by those identifier spaces, that a particular registry exists and procedures for interaction with it GSFC/Dec 06 8Define processes and standards to the numbering and identifier requirementsMSFC/Apr 07 9Define and document a statement of work for the ongoing operation of the SANA function MSFC/May 07 10Present SOW to the CMCALL/Jul 07 11Develop implementation and operation plans and costMSFC/Jun 07

NASA MSFC Engineering Directorate Mission Operations Laboratory Page 4 Bob SANA End of Meeting Summary  Open Issues  International participation  Action Items  Request the Secretariat to send a letter to WGs/SIGs/BoFs drafted by WG lead  Resource Problems  International participation  Goddard funding  Cross Area WG/BoF Issues  No issues to date, but will be requesting each group to identify SANA type requirements