WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: 2016-01-18 to 2016-01-22 Agenda Item: TP#21, Item 10.4,

Slides:



Advertisements
Similar presentations
Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
Advertisements

WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
WG5 - MAS Progress Report at TP #16 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #12 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
Requirements Overview Group Name: Technical Plenary (TP19) Source: Shelby Kiewel, iconectiv, Meeting Date: Agenda Item:
Thoughts on oneM2M resource tree Group Name: WG2 Architecture at TP#7 (Sophia, October 2013) Source: Nicolas Damour, Sierra Wireless
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Updated:
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
WG 3 Progress Report at TP13 Group Name: oneM2M TP13 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Developing MARCOM and Outreach activities Group Name: MARCOM Source: Gerry McAuley, Ultan Mulligan Meeting Date: Agenda Item: n/a.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
Supporting Time Series Data Group Name: WG2 Source: Qi Yu, Mitch Tseng- Huawei Technologies, Co. LTD. Meeting Date: Work Item :WI-0033.
Discussion for the next oneM2M release Group Name: TP Source: JaeSeung Song, KETI, Jaeho Kim, KETI,
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
PRO/ARC and TST/PRO joint sessions at TP20 Group Name: oneM2M TP20 Source: Peter Niblett, IBM Meeting Date:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
SEC #11 WG4 Status & Release 1 Outlook Group Name: Source:,, Meeting Date: Agenda Item:
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
Call for input from WGs on things to test Group Name: TST Source: Jiaxin Yin, Huawei Technologies Co., Ltd., Meeting Date:
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
TS-0004 guideline for new resource type definition Group Name: PRO WG Source: SeungMyeong JEONG, LG Electronics Meeting Date: Agenda Item: TS.
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Overview of oneM2M Home Appliances Information Model
Status of Active Work Items Level of Completeness
WG2 - ARC TP#29 Status Report
WG1 status report to TP#15 Group Name: oneM2M TP15
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
Presentation transcript:

WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4, Reports from Working Groups TP R01

Issues for DECISION in TP CR Packs – TP TR-0018-Industrial-Domain-Enablement Requesting approval of TR-0018 Industrial Domain Enablement Document to be included in Release 2 – TP TS-0002 CR Pack for TP Approval Contribution REQ R01  Informative Annex has been agreed for addition to TS-0002 to allow for new requirements to be added as Informative  Any requirements added to the Informative Annex will require CR to be moved into the Normative section of TS-0002 after Stage 3 Freeze Contribution REQ  Update to Requirements Note regarding Geo-fencing  Note 7, related to OSR-047 © 2014 oneM2M Partners TP

Action Items for alignment in TP None © 2014 oneM2M Partners TP

Items for INFORMATION None © 2014 oneM2M Partners TP

Highlights Addressed submitted contributions primarily associated with new Use Cases Migrated vehicle specific Use Cases from TR-0001 to TR-0026 on Vehicular Enablement Finalized TR on Industrial Domain Enablement (TR ‑ 0018) Addressed new terms based on updates to TS-0001 Meeting minutes can be found in REQ – Open for comment through 29 January 2016 © 2014 oneM2M Partners TP

Highlights Agreed contributions © 2014 oneM2M Partners TP Doc-NumberTitleSource REQ R01Vehicle Management based on Geo-fence_TR-0026SK Telecom REQ Draft-TR-0018-Industrial_Domain_Enablement-V0_5_0Hitachi REQ R01TR-0018-ConclusionHitachi, Huawei REQ R02CR to add contents for clause 5,7,8 in TR0013KETI REQ CR_to_TR0001_move_Use_Cases_to_TR0026Hitachi, Huawei, LGE REQ TR-0026-_Vehicular_Domain_Enablement_Clause_6Hitachi, Huawei, LGE REQ R03TR-0026-_Vehicular_Domain_Enablement_Clause_5_Introduction_to _Vehicular_DomainHitachi, Huawei, LGE REQ Terminology: Geo-fenceSK Telecom REQ R01Use Case on OTA Firmware Update for ECUsKDDI REQ R01Addition of Informative Annex to TS0002Shelby Kiewel - iconectiv REQ R02Draft-TR-0018-Industrial_Domain_EnablementHitachi, Huawei REQ CR for Geo-fence event information support of OSR-047SK Telecom REQ Definition_of_Content_Sharing_ResourceSamsung Electronics

Next Steps Advance Home Domain enablement document (WI-0017) Advance Vehicular Domain enablement document (WI-0046, TR-0026) Continue validation of requirements implemented in Release 2 prior to final release freeze as agreed during TP#19 © 2014 oneM2M Partners TP

Next Meetings / Calls Conference Calls No conference calls prior to TP#22 Face to Face TP#22 in Sophia Antipolis, FR, 14 – 18 March 2016 Timeslot allocations unknown at this time Advance Use Cases Advance ideas for requirements necessary for the next release. © 2014 oneM2M Partners TP