WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.

Slides:



Advertisements
Similar presentations
Explanation about three ways to obtain CD emissions in the present GTR and a proposal for the amendment E-Lab group WLTP-07-16e.
Advertisements

WLTP-07-17e WLTP GTR 15.
DTP14 and GTR Drafting Progress Report 66th GRPE 6th June 2013 Informal document No. GRPE th GRPE, 3-7 June 2012 agenda item 3(a) Transmitted.
Worldwide Harmonised Test Procedure for Light Duty Vehicles WLTP EVE 2nd Session 13 of September Per Öhlund Co-chair Subgroup EV.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-094 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-061
Starting note for WLTP phase 2 working items WLTP rev1e Kazuki KOBAYASHI Vice chair of WLTP.
Progress report of e-Lab sub-group (WLTP rev1e)
Progress report of e-Lab sub-group (WLTP-10-12e) 1. Proposals for Adoption 2. Proposals for Discussions 3. Next Actions.
Status report of WLTP Sub Group EV EVE 14. At WLTP IWG 10 Adopted open issues.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-053 Leader: Per Ohlund / Kazuki Kobayashi WLTP-DTC
WLTP-E-Lab Sub Group Test procedure
Progress report of Sub Group EV (WLTP-11-19e) 1. Discussion points 2. Next Actions.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-066 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP-DHC Current status of WLTP-DHC & Mode Construction Prepared by Japan the 16 th DHC group under GRPE/WLTP informal group 15 th Jan Palais.
1 WLTP-DTP- E-LabProc-005 Test Procedure for Electrified Vehicles presented by Japan 24&25 November 2010.
Progress report of Sub Group EV (WLTP-12-19e) draft 1. Proposals for adoption 2. Discussion points.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-088 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP-DHC Current status of WLTP-DHC & Mode Construction Prepared by DHC Secretary the 18 th DHC meeting under GRPE/WLTP informal group 5 th Jun.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
1 Discussion paper on Mode Construction during Validation 2 Prepared by Japan DHC group under GRPE/WLTP informal group November 2011 WLTP-DTP-LabProcICE-108.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-034 Leader: Per Ohlund / Kazuki Kobayashi.
State of play WLTP Sub Group EV. Sub Group EV meeting 28 of September Last meeting of WLTP IWG 29 of September to 1 of October Final meeting for phase.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-012 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP Vehicle range and energy consumption EVE October 2014.
Status report and Discussion paper for Number of tests at WLTP Tokyo IWG in 2015 JAPAN WLTP-12-15e.
Nicolas HAREL Sam TRIPATHY 23/10/2014 CONFIDENTIEL PROPRIÉTÉ RENAULT WLTP PEV Range test procedure : End of test criteria.
WLTP validation test results for BEV(i-MiEV) & OVC-HEV (Prius PHV)
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Progress Report of World-wide Light-duty Test Cycle
India’s Comments on EPPR (Part-B2)
WLTP Informal Working Group
Study on Drive Trace Index of Electrified Vehicles
Position paper on Mode Construction during Validation 2
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
WLTP-14-15e Progress report of Sub Group EV (WLTP-14-15e) 14th WLTP IWG 26 April 2016.
Air Pollution Control and NIR Division
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
Status of the draft GTR 65th GRPE, January 2013.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-012
Confirmation on application to EVs unique cycle
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
Open issues 3 bis12, 20, 25, 26 bis, 30, 31 and 33 O.I. 12 (EV) :
Current status of WLTP-DHC
WLTP-DTP-LabProcICE-229
Annex8  ( ) CD-CS break-off criteria Proposal from Japan with ACEA Comments ( )
Supplemental Test for Determination of CO2 Emissions under Regional Conditions – EU WLTP. Andreas Eder for the Working Group on the Development.
WLTP DTP Lab Process EV sub group
ACEA Comments from ACEA still does not understand the reasoning for this proposal. This proposal increases the test burden disproportionally.
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
Fuel Cell Vehicles - Required corrections in xxx-2016
Position paper on Mode Construction during Validation 2
Mode selectable switch
Proposal EV/PHEV/HEV/FCV Lab Process Sub-Group
Supplemental Test for Determination of CO2 Emissions under Regional Conditions Results from Telco Oct. 30th, 2014 (Iddo, Markus, Helge, Andreas)
1. Summary # items RESULTS status remarks EV_1 HEV system power
Vehicle classification for Electrified vehicle
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 February 5, 2015.
ACEA Comments from ACEA welcomes the idea to develop a shortened range test procedure based on MCT However, ACEA does not support JP proposal.
Working Paper No. WLTP-05-11e
Proposed actions for gtr development
(under discussion in Phase 2)
WLTP Informal Working Group
Discussion paper on Applicable Test Cycle and Mode Construction
Discussion paper on Applicable Test Cycle and Mode Construction
Progress report of Sub Group EV (WLTP-12-19e) 1
Analysis for WLTP UF development
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-028
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 8/20/2019.
OIL# 52: End of PEV range criteria
Presentation transcript:

WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi

Lab proc EV group Meetings 6 th of November, phone meeting Japan reported validation phase 2 result 15 th of November F to F meeting in Brussels. Validation phase 2 result was reported by ACEA. Open issues were discussed. Some of open issues were closed. 9 th of January,phone meeting Discussed some open issues and proposal

Validation phase 2 result ItemsValidation resultsConclusion Time after Range test until start of charging. Current proposal within [30 minutes] 30 minutes is too short.Within 2 hours (same as ISO) Order of CD and CS test There is no impact.Order of test should be flexible. RCB correction Regulated pollutant (NOx,HC,CO,PM,PN) There is no impactRegulated pollutant should not be corrected RCB correction Additional pollutant There is no impactAdditional pollutant should not be corrected. Closed

Validation phase 2 result ItemsValidation resultsConclusion RCB correction window Current proposal Within 1 % To be analyzed VP2 result. To be discussed at beginning of March. Vehicle classification Current proposal 30 minute maximum power 30 minutes power is not appreciate ? To be discussed at beginning of March. Break off criteria for Range test Japanese proposal 4sec and within 15sec stop VP2 were conducted by 4sec. According to test result, deceleration within 15 sec is dangerous at high speed. To be discussed at beginning of March. TBD

Vehicle classification for BEV Revision of PMR ⇒ Current PMR * coefficient X % for BEV ? Definition of Power & Speed: 30min max power/30min max speed Is “out of scope” necessary for the vehicle that cannot keep the target speed tolerance of Low phase ? The information for the customer regarding driving range that measured by different test cycle shall be considered. OVC-HEV,NOVC-HEV has same issues. Matters of concern PMR Maximum speed

Validation phase 2 result ItemsValidation resultsConclusion CD to CS mode break off clitella. Japan proposed the criteria based on fuel consumption. To be discussed at beginning of March Break time between cycle Current :10minutes Proposal is too short. Especially diesel vehicle needs at least 40 min. Not only E-Lab ->MCTF TBD

Open issues ItemsProposalConclusion Run in mileage. BEV 300 km OVC HEV and NOVC HEV should be same as ICE vehicle km Agreed Soak condition Forced cooling Not allow forced cooling condition Because electrified vehicle performance does not depends on water and oil temperature. To be discussed at beginning of March Utility FactorACEA will propose a calculation method. To be discussed at beginning of March Closed TBD

Open issues ItemsProposalConclusion Mode constructionJapan propose to conduct 4 phase test Counterproposal for BEV Consider shorten test procedure for EV range test. Counterproposal for OVC HEV To be discussed with data base. To be discussed at beginning of March TBD

Base test matrix Based on the idea to measure the emission and fuel economy (or CO2) by each phase, ● marked cold & hot tests will be necessary for each type of vehicles.

Confirmation test Shorten test procedure for BEV range test. Calculation method for each phase range by complete WLTC. CD to CS break off criteria confirmation RCB correction window confirmation Soak condition with charging Break time between the cycle To be prepared “Confirmation item list and action plan” until March. DRAFT

Road map 2012JanFebMarAprMayJunJulAugOctNovDec Meeti ngs E-lab action Confirmation test Ad-hoc GRPE 66th GRPE 65 th GRPE DTP gtr Ver1 Closed open issues Reflect Still open issues Prepare test parameter gtr Ver2 Ad-hoc WLTP gtr Ver3gtr final E-Lab meeting