Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 1 CFS EDR FNAL Kick-Off Planning.

Slides:



Advertisements
Similar presentations
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Advertisements

Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
Interfacing Initiatives Hometown Collaboration Initiative (HCI)  Expansion of leadership and civic engagement to capitalize on innovative strategies 
SUPERCONDUCTING PARTICLE ACCELERATOR FORUM OF AMERICA (SPAFOA) Update and Planned 2013 Activities April 3, 2013 MSU FRIB Ken Olsen
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Working Group on Public Debt Progress Report 6th Meeting of the Steering Committee of the INTOSAI Committee on the Knowledge Sharing and Knowledge Services.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Educational Master Plan Opportunities and Projections for the Future May 4, Cambridge West Partnership, LLC.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
University of Idaho Successful External Program Review Archie George, Director Institutional Research and Assessment Jane Baillargeon, Assistant Director.
Date Event Global Design Effort 1 CF&S Environmental Timelines & Radiation Impacts Jerry Aarons, PG/CHG (SLAC) Rod Walton, PhD (FNAL)
Transparency Indicator IATI Steering Committee Copenhagen 13 March 2014.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
31 MAY 2007 ILC 2007 DESY 1 The U.S. Way Tom Lackowski GDE.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Arctic System Model Workshop Background and Objectives International Arctic Research Center Hosted by National Center for Atmospheric Research May 19-22,
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Aug. 22, 2007 CF7S Americas EDR Kick-Off A&E Selection the Fermi Process Tom Lackowski.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
DOE Data Management Plan Requirements
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Revealing the Hidden Nature of Space and Time Charting the Course for Elementary Particle Physics (in the U.S.) Committee on Elementary Particle Physics.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Fred Asiri1 Conventional Facilities SLAC Match 5, 2006 Acknowledgment: Clay Corvin, Jerry Aarons, and Jonghoon Kim.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Conventional Facilities and Siting Global Group (ARCFS)
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Systems Engineering for Mission-Driven Modeling
Presentation transcript:

Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning Meeting Overview of Regional Interest Efforts Vic Kuchler CFS Global Design Effort

Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, Current Status The Responsibilities of the CFS Group During the Transition to the EDR Phase of the Project will Definitely have an Expanded Focus The Responsibilities of the CFS Group During the Transition to the EDR Phase of the Project will Definitely have an Expanded Focus In Order to Keep Pace with the Technically Driven Schedule We will have to Devote Substantial Effort Toward the Regional Interest Aspects of the Project In Order to Keep Pace with the Technically Driven Schedule We will have to Devote Substantial Effort Toward the Regional Interest Aspects of the Project Each Region, and Perhaps Individual Countries, will need to Develop a Plan that will Lead to an Eventual “Expression of Regional Interest” for Each Proposed Site for the ILC Each Region, and Perhaps Individual Countries, will need to Develop a Plan that will Lead to an Eventual “Expression of Regional Interest” for Each Proposed Site for the ILC The Extent of Regional Interest Efforts will be Determined, Guided and Subject to the Approval of Many Separate and Distinct Entities and will Vary in Each Region and/or Country that Considers Hosting the ILC The Extent of Regional Interest Efforts will be Determined, Guided and Subject to the Approval of Many Separate and Distinct Entities and will Vary in Each Region and/or Country that Considers Hosting the ILC

Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, Factors that will Impact the Transition to EDR Global Design Effort (GDE) Solutions Based on the Three Regional Sample Sites Need Further Refinement with Respect to Specific Siting and Alignments Global Design Effort (GDE) Solutions Based on the Three Regional Sample Sites Need Further Refinement with Respect to Specific Siting and Alignments Current Designs Indicate the Approximately 30% of the ILC Conventional Facilities can be Considered Site Independent While 70% can be Considered to be Site Dependent Current Designs Indicate the Approximately 30% of the ILC Conventional Facilities can be Considered Site Independent While 70% can be Considered to be Site Dependent The CFS Group will Proceed under the Assumption that the Site Dependent Conventional Facilities will be Provided by the Host Country as Part of the Expression of Regional Interest The CFS Group will Proceed under the Assumption that the Site Dependent Conventional Facilities will be Provided by the Host Country as Part of the Expression of Regional Interest Based on this Assumption, Construction of these Facilities will be Completed under Local Standards, Codes and Governmental Regulations Based on this Assumption, Construction of these Facilities will be Completed under Local Standards, Codes and Governmental Regulations

Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, Participants in a United States Site Proposal The International Linear Collider Steering Committee will Eventually Provide Guidance for the International Site Selection Process The International Linear Collider Steering Committee will Eventually Provide Guidance for the International Site Selection Process Fermilab will need a Strategic Plan for Future Laboratory Activities Fermilab will need a Strategic Plan for Future Laboratory Activities Collar Communities and Counties will need to Incorporate this Project into Strategic Plans and Provide Input into the Process Collar Communities and Counties will need to Incorporate this Project into Strategic Plans and Provide Input into the Process The State of Illinois will have Stipulations, Requirements and also need a Strategic Plan The State of Illinois will have Stipulations, Requirements and also need a Strategic Plan The Office of Science in the Department of Energy Could Likely Oversee the Site Dependent Conventional Construction for the ILC in the United States The Office of Science in the Department of Energy Could Likely Oversee the Site Dependent Conventional Construction for the ILC in the United States Office of Management and Budget, Congress and the President will also need to Endorse the Project Office of Management and Budget, Congress and the President will also need to Endorse the Project All of this Effort will Take Financial Commitment All of this Effort will Take Financial Commitment

Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS Efforts in the Americas Region As a Starting Point, the CFS Group will Begin to Explore the Feasibility for a Potential ILC Alignment that is Centered on the Fermilab Site and Extends in a North-South Orientation As a Starting Point, the CFS Group will Begin to Explore the Feasibility for a Potential ILC Alignment that is Centered on the Fermilab Site and Extends in a North-South Orientation This will be used as the Baseline to Compare Other Alignments Including the Possibility of a Site West of the Fox River Valley This will be used as the Baseline to Compare Other Alignments Including the Possibility of a Site West of the Fox River Valley CFS will also Pursue a Definitive Investigation of a Near Surface/Cut-and-Cover Design Solution CFS will also Pursue a Definitive Investigation of a Near Surface/Cut-and-Cover Design Solution Many Factors will need to be Identified and Compared in Order to Optimize an Eventual Proposed Site for the Americas Region/United States Expression of Regional Interest Many Factors will need to be Identified and Compared in Order to Optimize an Eventual Proposed Site for the Americas Region/United States Expression of Regional Interest

Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, So How to Proceed To Begin, Each Region will Produce a Set of Work Activities that will Develop Into a Work Package(s) to Define the Regional Interest Effort To Begin, Each Region will Produce a Set of Work Activities that will Develop Into a Work Package(s) to Define the Regional Interest Effort These Work Packages will then be Included in the Overall CFS EDR Plan These Work Packages will then be Included in the Overall CFS EDR Plan Local Influences (Described for the Americas Region Above) will need to be Identified and Incorporated into Each Regional Effort Local Influences (Described for the Americas Region Above) will need to be Identified and Incorporated into Each Regional Effort Once Identified, Regional and National Timeframes for Bid to Host Efforts will need to be Reconciled Once Identified, Regional and National Timeframes for Bid to Host Efforts will need to be Reconciled The International Site Selection Process will Also need to be Reconciled with the International Process The International Site Selection Process will Also need to be Reconciled with the International Process A Substantial Portion of this Process is Beyond the Control of the CFS Group A Substantial Portion of this Process is Beyond the Control of the CFS Group