Www.floodrisk.org.uk EPSRC Grant: EP/FP202511/1 Good Practice Guidelines for Flood Risk Mapping Keith Beven, Lancaster University With Dave Leedal (Lancaster),

Slides:



Advertisements
Similar presentations
Evidence-based Climate Risk Management
Advertisements

Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
RISK MANAGEMENT AND ASSESSMENTS OF NATURAL HAZARDS Ron Conner Corps of Engineers.
Study Objectives and Questions for Observational Comparative Effectiveness Research Prepared for: Agency for Healthcare Research and Quality (AHRQ)
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Assessing Uncertainty when Predicting Extreme Flood Processes.
© UKCIP 2011 Learning and Informing Practice: The role of knowledge exchange Roger B Street Technical Director Friday, 25 th November 2011 Crew Project.
EPSRC Flooding Focus Philippa Hemmings. EPSRC Strategic Plan Our strategy has three clear goals Delivering impact Embedding impact throughout our portfolio.
Outreach, Education and Technical Assistance: What We Can Do Differently Jurij Homziak Lake Champlain Sea Grant.
EPSRC Grant: EP/FP202511/1 Session 2 - Improving the management of flood infrastructure Chair Paul Sayers, Leader Infrastructure Management.
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
Funders: EPSRC Grant: EP/FP202511/1 ENGAGING STAKEHOLDERS WITH UNCERTAINTY ENGAGING STAKEHOLDERS WITH UNCERTAINTY Hazel Faulkner &
Modelling of the 2005 flood event in Carlisle Jeff Neal 1, Paul Bates 1, Tim Fewtrell, Matt Horritt, Nigel Wright, Ignacio Villanuaver, Sylvia Tunstall,
EPSRC Grant: EP/FP202511/1 Visualising Uncertain Flood Inundation Maps David Leedal 1, Jeff Neal 2, Keith Beven 1,3 and Paul Bates.
Visualising and Communicating Uncertain Flood Inundation Maps David Leedal 1, Jeff Neal 2, Keith Beven 1,3 and Paul Bates 2. (1)Lancaster Environment Centre,
Funding by the Australian Government represented by the Department of Climate Change and Energy Efficiency. Coastal Adaptation.
Risk Assessment and Management Katie Matthews GEOG 350 November 8, 2007.
Conclusions, planning and prospects Follow-up committee meeting 6 October, Leuven.
EPSRC Grant: EP/FP202511/1 Probabilistic Forecasting for Local Flooding David Leedal, Paul Smith, Keith Beven and Peter Young Lancaster.
Session 6Slide 6-1 Risk Management Lessons from Outside the United States Session 6 Slide Deck.
61 What is hazard risk management?. 62 Emergency risk management is “a systematic process that produces a range of measures that contribute to the well.
EPSRC Grant: EP/FP202511/1 International workshop to discuss the science of asset management 9 th December 2011, Brunei Gallery, School.
Information Technology Project Management
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Local flood forecasting for local flood risk areas Keith Beven, David Leedal, Peter Young and Paul Smith Lancaster Environment Centre.
This is an audio-enhanced PowerPoint presentation. To hear the audio, please open this presentation in “Slide Show” view.
EPSRC Grant: EP/FP202511/1 From offshore wave to coastal erosion and overtopping Nicolas Chini 1, Lucy Bricheno 2, Chris Wilson 2,
WP1.2: Inundation modelling to support uncertainty analysis Jeff Neal 1, Ignacio Villanueva 2, Nigel Wright 3, Thomas Willis 3, Timothy Fewtrell 4, Paul.
EPSRC Grant: EP/FP202511/1 Land-use, Sediment and Flood Risk delivered by: Colin Thorne, Nottingham University on behalf of: FRMRC.
Dr. Shane Parson, PE, CFM, URS (RAMPP Team)
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 11 Project Risk Management.
ASFPM 2011 FEMA’s National Flood Mitigation Data Collection Tool (NT) Errol Garren May 19, 2011 H-4A 4:
EPSRC Grant: EP/FP202511/1 Improved Methods for Predicting Trash Loading at Culverts with Trash Screens Nick Wallerstein & Scott Arthur.
© The McGraw-Hill Companies, Software Project Management 4th Edition Risk management Chapter 7.
Risk Management Production Process. Lecture content Recap on last week What is risk management? Quantitative risk evaluation – Decision trees Expected.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Funders: EPSRC Grant: EP/FP202511/1 Communicating flood risk science at the academic- practitioner interface Meghan Alexander * Hazel.
Session 111 Marketing Plan Form a publicity subcommittee Make the media work for you Preparing to work with the media What is your message?
UNFCCC Workshop on the preparation of national communications of NAI Parties, Manila, april 2004 Methodologies for, Approaches to, and Frameworks.
EPSRC Grant: EP/FP202511/1 WP4.2 – Performance based inspection of flood defence infrastructure: Integrating visual inspection and.
EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011.
Natural Hazards Science: Reducing America’s Risk from Floods David Ford David Ford Consulting Engineers.
The new EC impact assessment: what for? EUROPEAN TRADE UNION CONFEDERATION Sophie Dupressoir.
User Requirements and Engagement in Health Informatics Alistair Sutcliffe Sarah Thew, Oscar De Bruijn, Manchester Business School, Jock McNaught National.
Introduction to policy briefs What is a policy brief? What should be included in a policy brief? How can policy briefs be used? Getting started.
Sustainable/Resilient Communities in Monmouth County September 10, 2008 Sea Level Rise & Coastal Resiliency Jon K. Miller 1 & Thomas O. Herrington 2 1.
DoD Comments to NRC Committee on Improvements to EPA Risk Analysis Yvonne P. Walker, MS, MSE, CIH Director, Environmental Programs Navy Environmental Health.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
(c) Adaptive Processes Consulting Be with the Best!
Sustainability Assessment: The Way Ahead for Corporate Reporting.
EPSRC Grant: EP/FP202511/1 Source-Pathway-Receptor (SPR) Modelling of Flood Impacts and Outcome Enda O’Connell, John Ewen, Greg O’Donnell,
GNS Science Land use planning for natural hazards – a risk based approach Wendy Saunders, PhD, MNZPI Natural Hazards Planner.
Modelling of the 2005 flood event in Carlisle and probabilistic flood risk estimation at confluences Jeff Neal 1, Paul Bates 1, Caroline Keef 2, Keith.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
OutcomeObjectivesResearch questionsOutputs Activities Smallholder families adopt technology packages that improve food, nutrition and income security 1.To.
Draft EU Risk Assessment and Mapping Guidelines for Disaster Management 8th Meeting of Working Group F on Floods October 2010 Commission ECHO.C4.
RASP - Risk Assessment of flood and coastal defence for Strategic Planning A High Level Methodology Project partners and co-authors Paul Sayers / Corina.
Trigo White Ltd Practical project risk assessment VIII Conferencia Internacional Hotel Tivoli Oriente, Lisbon 28 th November 2014 Simon White Consultant,
Knowledge Structure Mapping and NEC Development Richard Ellis Stratum Management Ltd.
Ksenija Jovanović.
The ISSAIs for Financial Audit ISSAIs
OFFICE OF PUBLIC WORKS FLOOD MANAGEMENT PROGRAMME
Modelling Training: A case study from Army Training Branch
Natural Flood Management, in context
Our work on Cumulative Impact Assessment
FLOODsite Integrated Project
Paul Samuels Coordinator
The UMBRA Eight-Step Benefit-Risk Framework
And now the Framework WP4.
Presentation transcript:

EPSRC Grant: EP/FP202511/1 Good Practice Guidelines for Flood Risk Mapping Keith Beven, Lancaster University With Dave Leedal (Lancaster), Jeff Neal and Paul Bates (Bristol), Caroline Keef, Neil Hunter and Rob Lamb (JBA Consulting), Simon McCarthy (Middlesex) and Jon Wicks (Halcrow)

EPSRC Grant: EP/FP202511/1 Flood Risk Mapping: framing the application Planning decisions Emergency planning Flood damage assessments and defence design Insurance Generating householder resilience ……

EPSRC Grant: EP/FP202511/1 Sources of Uncertainty in Flood Risk Mapping

EPSRC Grant: EP/FP202511/1 Guidelines for Good Practice as Decision Trees Assumptions to be agreed between analyst and stakeholder(s)…..provides framework for discussing and handling knowledge uncertainties Explicit agreement and record means that later evaluation and review can be carried out Default options, or decision tree of potential options

EPSRC Grant: EP/FP202511/1 Guidelines for Good Practice as Decision Trees Source Uncertainties Pathway Uncertainties Receptor Uncertainties

EPSRC Grant: EP/FP202511/1 Decision Tree for Design Flood Magnitude

EPSRC Grant: EP/FP202511/1 Case Study: Modelling inundation at Mexborough for the AEP 0.01 event given observations from 2007

EPSRC Grant: EP/FP202511/1 Mexborough Risk Mapping: Defining Input Uncertainties WinFAP estimate of 0.01 AEP (T100) flood peak at Adwick Mean: 86.6 (m 3 s -1 ) Var: 6.25 (m 3 s -1 )

EPSRC Grant: EP/FP202511/1 FRMRC Visualisation Tool

EPSRC Grant: EP/FP202511/1

EPSRC Grant: EP/FP202511/1

EPSRC Grant: EP/FP202511/1 Summary Guidelines for good practice as decision trees allows dialogue and audit of difficult decisions about uncertainty Good visualisation tools required to communicate meaning of results to users and stakeholders (see demonstration) Full FRMRC Guidelines Report will be available shortly