FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.

Slides:



Advertisements
Similar presentations
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
Advertisements

Analysis & Design.  Where Filters are used?  Chronological evolution – techniques  Integrated Circuits Support  Other kinds of Filters  Contents.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
January 10, 2008 Update description of slides Slide 1: This is the response of Silicon when pumped with 800 nm, probed with mid-IR –FWHM of pulse ~150.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Spatio-Temporal Quincunx Sub-Sampling.. and how we get there David Lyon.
Digital Correlated Double Sampling for ZTF Roger Smith and Stephen Kaye California Institute of Technology The digital equivalent of dual slope integration.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
N. BlaskovicFONT Meeting1 FONT5 board #2 DAC tests N. Blaskovic.
FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
FONT Meeting1 Digital signal filtering N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
M.Gasior, CERN-BE-BILHC Optics Measurement and Corrections Review, June Diode ORbit and OScillation (DOROS) System Marek GASIOR Beam Instrumentation.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
CMOS Analog Design Using All-Region MOSFET Modeling
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
NanoBPM Progress January 12, 2005 Steve Smith.
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
Monitoring glitches in the frequency divider
Analysis of March ATF Run
N. Blaskovic, T. Bromwich & G. Christian
Sub title- Authors (font 50; black; bold)
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Sub title- Authors (font 50; black; bold)
Sub title- Authors (font 50; black; bold)
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
SLAC - End Station A ILC testrun – April '06 ...
Национална стратегија за инвестиции во животната средина
FONT stripline BPM resolution
FONT5 sampling jitter investigations
Fitting to the Linear Region of I’/q
Assignment # 3 Chapter 4 End of Chapter questions P-4.6 Page 97
Extraction kicker scan & feedback results
Presentation transcript:

FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic

Contents 3-BPM resolution using –Single-sample point & averaging –Fitting & transfer matrices –Raw unfiltered data & 25 MHz digital LPF FONT Meeting2N. Blaskovic

Data Data from 12 June 2015 (first shift with high β optics for 3-BPM resolution studies) No 714 MHz or C-band BPFs Charge: 0.7 x FONT Meeting3N. Blaskovic

No filtering Single-sample resolution –~90 nm by fitting –~100 nm using transfer matrices Multi-point averaging (not integration!) resolution –~50 nm by fitting –~50 nm using transfer matrices FONT Meeting4N. Blaskovic

FONT Meeting5N. Blaskovic

FONT Meeting6N. Blaskovic

25 MHz digital LPF Single-sample resolution better than without digital LPF (except IPC with fitting) Multi-point averaging resolution worse than with digital LPF IPC resolution worse than that of IPA and IPB (when fitting) FONT Meeting7N. Blaskovic

FONT Meeting8N. Blaskovic

FONT Meeting9N. Blaskovic

3-BPM resolution FONT Meeting10N. Blaskovic BPM Resolution (nm) Unfiltered25 MHz digital LPF FittingGeometricFittingGeometric PointAve.PointAve.PointAve.PointAve. IPA IPB IPC