CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6.

Slides:



Advertisements
Similar presentations
ROBOTS IN RADIOACTIVE ENVIRONMENTS.
Advertisements

CLOSED CIRCUIT TELEVISION (CCTV) SURVEILLANCE SYSTEMS
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6.
EMI Systems Limited specializes in CCTV surveillance systems that ranges from stand-alone cameras to fully integrated security control centers and to the.
ISOE Asian ALARA Symposium September, 2010 Recent Regulatory Activities to Improve ALARA Performance of Nuclear Power Plants in Korea Kyu Hwan Jeong Korea.
Yonggwang NPP Unit 5&6. Background Status & Problem Plan & Improvement Effects Future plan Contents.
Gauges and well logging
Radiation Safety Training WSU Radiation Safety Program Washington State University Radiation Safety Office.
Radiation Survey & Frisking
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4.
Experimental Class 5 Steam Generator
ICE PLUG MONITORING SYSTEM Ice plug is an efficient method of providing isolation on liquid filled (water, heavy water) pipes to perform maintenance and.
Can Egypt share the Construction of Power Reactors as Korea ?
ALARA Activities at Ohi NPP Ohi Nuclear Power Plant Kansai Electric Power Co., Inc.
Radiation Survey & Frisking
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
1 Management of Occupational Exposure Dose using Entrance/Exit Processing System in Shika Nuclear Power Station Takeshi Masaki Nuclear Power Dept. Hokuriku.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
IAEA International Atomic Energy Agency Radiation Protection Issues in Nuclear Installations (NPP & RR) Laszlo Sagi Radiation Safety and Monitoring Section.
Advanced CIS NAME: ___________________. OBJECTIVE: Maintaining, Managing, and Troubleshooting Systems Maintenance includes following established procedures.
Development of Cyber ALARA Program 2012 ISOE Asian ALARA Symposium Choi, Hoon Radiation Health Research Institute Korea Hydro-Nuclear Power Company.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
MHI PROPRIETARY : CLASS B All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Tungsten balls charge method radiation shield system.
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
Site Security Policy Case 01/19/ : Information Assurance Policy Douglas Hines, Jr.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
The safeguards activities for LWRs with MOX in Japan - Remote data-driven safeguards - YATSU Shoichi Ministry of Education, Culture, Sports, Science and.
I & C.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
REPUBLIC OF SLOVENIA MINISTRY OF AGRICULTURE AND THE ENVIRONMENT SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Regulatory Infrastructure in Slovenia Iztok Anželj.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1 ALARA at the Borssele nuclear power plant. 2 ALARA at the Borssele P Borssele  NPP Borssele  In the delta in the Southwest of the Netherlands  KWU.
Working Procedure with Ionizing Radiation 1. Introduction Introduction Classification of Areas Classification of Areas Safe Handling/Use of Safe Handling/Use.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
1 Factors Contributing to the Reduction of Occupational Exposures at Czech NPPs Karla Petrová, Libor Urbančík, Dagmar Fuchsová State Office for Nuclear.
Application of « ALARA » at Tihange NPP ISOE EUROPEAN SYMPOSIUM 26 June 2008 Ir. Philippe Petit – Deputy head of SRP department 2 2.
&2 UNIT KORI NPP. 2 General Introduction Ⅰ Ⅲ GOOD PRACTICE FIELD APPLICATION CONCLUSION Ⅴ Ⅱ GOOD PRACTICES EFFECT ANALYSIS ⅳ.
Reduction of the collective doses in Almaraz Nuclear Power Plant through source term reduction and the work load reduction.
1 Advantages of combining gamma scanning techniques and 3D dose simulation in dose optimisation problems. F.Vermeersch IDPBW, Nuclear Studies Occupational.
1 Activitiesfor Dose Reduction Hamaoka Nuclear Power Station Chubu Electric Power Co.,Inc. November 2005.
Control of occupational exposure when working within a reactor containment building at power Matthew Lunn British Energy Generation Ltd. Sizewell B Power.
2013 ISOE International ALARA Symposium
ALARA Activities at Ohi NPP
Radiological Work Management Aspects influencing Dose Reduction at the Ignalina NPP during Outages and coming Decommissioning Radiation Protection Centre.
Transposition of Requirements set out in the Basic Safety Standards for Nuclear Facilities in Lithuania Gintautas KLEVINSKAS Albinas MASTAUSKAS Radiation.
Radiation Safety Management
Occupational Radiation Protection during High Exposure Operations
ALARA Programs & Occupational Dose Trend in Wolsong NPP
The Success of the ALARA Principle – the View of an Inspector
Optimization of radiation protection at Bohunice NPP
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
CCTV System for Radiation Work Management
EQUIPMENT RELIABILITY AT KOEBERG
CCTV System for Radiation Work Management
The Improvement of ALARA for the Steam Generator Maintenance
G. Valtchev, M. Neshkova, A. Nikolov Nuclear Power Plant Kozloduy
Presentation transcript:

CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6

Contents Ⅰ. YGN Unit 5 & 6 Ⅱ. Brief Overview of Radiation Protection Ⅲ. Description of CCTV system Ⅳ. Cases for use of CCTV system Ⅴ. Effects Ⅵ. IAEA OSART Good Practice Ⅶ. Conclusion

 Type : PWR  Power Level : 1,050MWe  2 Loops, 2 S/Gs, 4 RCPs  177 Fuel Assy’s, 16 × 16 tubes  S/G : Vertical U-tube with Economizer  Condensor Heat Sink : Sea water □ Key Features Ⅰ. YGN Unit 5 & 6

Ⅱ. Brief Overview of Radiation protection □ Statutory Exposure Dose limit CategoryWorkersFrequent Visitors General Public Effective Dose Limit100mSv per 5 years12mSv per year1mSv per year □ Site Exposure Dose limit CategoryWorkersFrequent VisitorsGeneral Public Effective Dose Limit 16 mSv per year 10 mSv per year 1 mSv per year

Ⅱ. Brief Overview of Radiation protection [cont’d] □ Radiation Work Control Anticipated Exposure (man-mSv)Counter plan < 10 Review and check work order 10 ~ 70 Work Order Approval 70 ~ 200 ALARA Acting Level Committee Review > 200 ALARA Committee review

□ Collective Radiation Exposure Ⅱ. Brief Overview of Radiation protection [cont’d ] Year

Ⅲ. Description of CCTV system □ Purpose  Radiation Exposure Reduction  Efficient Radiation Safety Control in RCA  Continuous Check-up for important works and facilities integrity □ Characteristics  Real-time information by LAN  Movable Cameras can support important or high radiation work anywhere

Ⅲ. Description of CCTV system [cont’d] □ Composition Item# 5# 6RWB Monitoring System1 Set - Announcement System1 Set - Camera Fixed7 Sets 4 Sets Movable2 Sets - Data Cable3.3 Km 1.1 Km

Movable or Fixed Office Lobby Monitor HP Room Console lack LAN Ⅲ. Description of CCTV system [cont’d] □ Network

BuildingElevationLocation Details Main Function ACB100Locker Room AreaPrevention of robbery 100Entrance to RCACheck-up personnel coming in and out SAB100General Access Area “ 77General Access Area″ FHB100Truck Bay AreaCheck up entry and exit of equipment and person 142Storage Area″ PAB144Personal Airlock AreaControlling entry and exit in high radiation area RWB100Hot Machine ShopCheck-up personnel coming in and out 100Entrance of RCAControlling entry and exit in high radiation area 100Truck Bay AreaCheck-up entry and exit of equipment and person 70Access AreaCheck-up personnel coming in and out Ⅲ. Description of CCTV system [cont’d] □ Location (Fixed Camera)

Buildingelevation Number of jacks Main Function RCB 1002 Installation and removal of SG Nozzle dam Installation and removal of SG man-way ECT (Eddy current test) 1252 Maintenance of RCP and related works Lancing and FOSAR in secondary side of SG 1422 Reactor Maintenance fuel loading and withdrawal Check-up entry and exit of equipment and person Ⅲ. Description of CCTV system [cont’d] □ Location (Movable Camera)  Movable Cameras are communicated with main control center by using connecting jack

Ⅲ. Description of CCTV system [cont’d] □ View of Fixed Camera

Ⅲ. Description of CCTV system [cont’d] □ View of Movable Camera

Ⅲ. Description of CCTV system [cont’d] □ CCTV system Diagram PAB 144’ HP ROOM ACB 100’ LOCKER AREA ROOM ACB 100’ Entrance of RCA SAB 100’ GEN ACCESS AREA SAB 77’ GEN ACCESS AREA FHB 100’ TRUCK BAY AREA FHB 142’ STORAGE AREA PAB 144’ PERSONAL AIRLOCK AREA LINK FACILITY MATRIX SWITCHER MONITORING SERVER(DVR) KEYBOARD MONITOR to RWB 4SET 11SET LINK FACILITY

Ⅲ. Description of CCTV system [cont’d] □ HP Room Console Rack (Main control center)  Real time Monitoring all places where cameras are located.  Recording important works  Announcing  Auto Recording when any movement is detected.

Ⅲ. Description of CCTV system [cont’d] □ Monitoring in HP Room Console Rack All locations under surveillanceThe main work place

 Comparison (use or not) Ⅲ. Description of CCTV system [cont’d] WorkYear Number of workers Working Time (man-hr) Exposure Dose (man-mSv) CCTV use or not SG Nozzle Dam Not Use ECT , Not Use SG Man-way Not Use

Ⅳ. Cases for use of CCTV system □ Removal of remaining Thermal Sleeve (T/S)  Unit 5 third Planned Outage (37 days) Case 1 During the first outage of unit 5, a metal object was discovered in the Reactor Bottom Head. (conformed by Remote Video Inspection). As a result of the specific inspection, three metal objects were discovered. These objects have been identified as missing thermal sleeves from the Safety Injection Nozzle. A remaining T/S was planned to be removed during the third Outage

Ⅳ. Cases for use of CCTV system Material : Inconel 690 Size (mm) : 304(W)×554(H)×4.5(T) Weight (kg) : 20Kg Dose rate (removal): 6mSv/hr

Ⅳ. Cases for use of CCTV system [cont’d] □ Monitoring T/S Work through CCTV System

Ⅳ. Cases for use of CCTV system [cont’d] □ Result of ALARA Control Target (mSv)Result (mSv)% Dose  Reason of exposure Reduction Content Reduction Rate(%) Work control (Lead shielding and vest)10 Reduction of the Number of person( Effect of CCTV)10 Optimization of Working time (Effect of CCTV)6 Cancellation of some work28.8 SUM53.8

Ⅳ. Cases for use of CCTV system [cont’d] □ Effect of using CCTV System  Reduction of Exposure : 16 man-mSv (10%)  About 15 persons supervised the work through CCTV during the working period (11days) = persons x staying time x Radiation level in the area  Optimization of Working Time : 9.6 man-mSv (6%)  Reduction of Radioactive Waste : 1 Drum  About 220 pairs of Rubber gloves / paper protection Clothes

Ⅳ. Cases for use of CCTV system [cont’d] □ Maintenance of leak Valve (SI-V522) in SI System  Date : ’ (unit 6 fourth outage)  Work Description At the time of NOT/NOP, SI- check Valve 522 of High Presser Safety injection Header leaked Piping was isolated throughout Ice plugging and Valve was Maintained CCTV System was used to monitor the maintenance work and ALARA Control Case 2

Ⅳ. Cases for use of CCTV system [cont’d] □ Result of ALARA Control Target (mSv)Result (mSv)% Dose  Number of workers : 16  Total working time : 6 hrs

Ⅴ. Effects  R R R Reduction of the number of person coming in and out  R R R Reduction of exposure dosage  R R R Reduction of radioactive waste  S S S Savings in protection supplies  R R R Real-time checkup in the office  R R R Radiation safety control in high radiation areas

Ⅵ. OSART GOOD PRACTICE □ IAEA OSART Review  Duration : ~ 5.3  Reviewed items - 7 items besides management, organization, & administration sections of YGN 5&6  Result of review in Radiation Protection Section - 2 good practices out of 10 good practices (No proposal for improvement) - CCTV System was evaluated as “ Good Practice”  the other is RIS (Radiation Information System)

Ⅵ. Conclusion  R R R Radiation safety control is requisites for lasting nuclear industry  O O O Our various efforts will help to improve radiation safety control whether it is large or not  A A A Actually, CCTV system is small effort but the such effort will makes a good fruit Our will and endeavor should be followed

Maintenance of Leak Valve (SI-V522)

Maintenance of leak Valve (SI-V522)