Federal-Aid Funding County Highway Accountants Conference May 10, 2007 zpowerpoint/ProjManagersCriticalIssuesBOB Feb07.ppt.

Slides:



Advertisements
Similar presentations
Danville Area Transportation Study. Fundamentals of Metropolitan Planning Organizations Adam Aull Danville Area Transportation Study MPO ASCE Presentation.
Advertisements

TIFIA Credit Program Overview Updated August 2014 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
Federal Budget Process Steve Kidd and Allison Boehm Budget and Program Analysis Staff April 2009.
INTRODUCTION TO FEDERAL HIGHWAY FUNDING AND ELIGIBILITY Mike Morrow Field Operations Engineer (503) Mike Morrow(Field Operations Engineer) Mike.
Maryland’s Budget Process & FY 2016 Education Budget Outlook.
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
House Bill 2 and P3 Update Aubrey Layne Secretary of Transportation December 17, 2014.
January 18, 2011 Genesee County Road Commission Non-motorized Project Coordination Non-motorized Project Coordination with the Genesee County Road Commission.
FINANCIAL PLAN AND FINANCIAL CONSTRAINT FOR FTIPS AND FSTIP FINANCIAL PLAN AND REVENUE ASSUMPTIONS 2013 FTIP/FSTIP WORKSHOP January 17, 2012 Wade Hobbs,
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
Federal and other funding programs. Introduction We live in the age of acronyms SAFETEA-LU FHWA FTA TIP STIP.
Federal Budget Process
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users P. L SAFETEA-LU.
Moving Toward a Performance- based Federal-aid Highway Program Integrating Maintenance AASHTO Subcommittee on Maintenance July 18, 2011 Peter Stephanos.
Federal Transit Administration New Starts Project Development Process
TCRP Project J-6, Task 71 Rural Transit Achievements: Assessing the Outcomes of Increased SAFETEA-LU Funding for Rural Transit INTERIM FINDINGS – TOWN.
© 2015 AMPO 444 North Capitol Street NW, Suite 345 Washington, DC tel: fax: Washington Update MAP-21 Reauthorization, Highway.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Highway Safety Provisions Elizabeth Alicandri FHWA.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
INVESTING IN INFRASTRUCTURE: TRANSPORTATION GRA Annual Policy Conference July 28, 2009.
Performance Measurement Requirements Notice of Proposed Rule Making.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
SAFETEA-LU Highlights Roger Petzold Office of Interstate and Border Planning Federal Highway Administration Transportation Border Working Group Nov. 9,
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
FY 2012 President’s Budget Released February 14, 2011.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
1 AASHTO SCOPT/MTAP 2009 Winter Meeting Legislative Update Ron Epstein Chief Financial Officer New York State Department of Transportation December 2,
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
Highway Program Financing July Michigan Allocations Federal Law + State Law + Michigan Policy = MDOT & Local Allocations of Federal Apportionment.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Ron Hall Tribal Technical Assistance Program Colorado State University
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
A M O T I A A N N U A L M E E T I N G 2 3 S E P T E M B E R N A S H V I L L E, T N 1 A View from the State DOTs Joung H. Lee Associate Director.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Surface Transportation Authorization AASHTO Executive Director John Horsley SCOH Subcommittee on Construction Chicago, Illinois August 4, 2009.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
Energy Law, Fall 2010 Natashia Holmes
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
Financial Planning Session E-1 The Metropolitan Transportation Planning Process.
INTRODUCTION TO FEDERAL HIGHWAY FUNDING AND ELIGIBILITY Steve Baumann Financial Specialist (503) Mike Morrow(Field Operations Engineer) Mike.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey A. Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Nelson Castellanos Federal Highway Administration March 12, 2013.
May 21, 2008 Bringing Transit Planning to the MPO Planning Table Bringing Transit Planning To The MPO Planning Table Daniel Rudge.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
TIFIA Credit Program Overview Updated October 2012 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
1 SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Office of Program Management Tribal Transit Outreach.
Projects of National and Regional Significance Program.
Freight Project Financing Challenges, Questions and Options presented by Michael P. Huerta Cambridge Systematics, Inc. April 30, 2001.
HIGHWAY TRUST FUND. HOW ARE PUBLIC PROJECTS FUNDED? General Fund Generated by general revenues Bonds Usually by referenda User Fees Pay as you go.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SESSION 5: TRANSPORTATION ISSUES Rob Henken President, Public Policy Forum August 5, 2014.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Action 2020 Training Local Context August 15, 2012.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Transportation Equity Act for the 21st Century TEA-21 Prepared by Iowa Department of Transportation September 1998.
Leveraging Financial Resources Federal Highway Administration Funding Shana V. Baker Office of Metropolitan Planning Federal Highway Administration
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
Division of Budgets January 25, 2012 Budget and Allocation Capacity Update Presented to the California Transportation Commission Tab 13.
ACEC-ODOT Conference Monday, March 6, Project Funding Federal Funds State Funds Summary.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Next Steps.  To begin Planning Council discussion about the MPO’s Next Steps. Now that the 2035 Regional Transportation Plan has been updated and adopted,
Developed from a summary prepared for the New York State Association of MPOs 1.
TRANSPORTATION PROGRAMS Financial Planning and Fiscal Constraint Requirement MAG Regional Council February 24, 2010.
Central Minnesota Area Transportation Partnership Primer Welcome
Presentation transcript:

Federal-Aid Funding County Highway Accountants Conference May 10, 2007 zpowerpoint/ProjManagersCriticalIssuesBOB Feb07.ppt

Congressional Procedure Administration Bill prepared by the DOT and introduced to Congress through at least one member Congress considers in development of their own legislation House and Senate process includes public hearings, subcommittee bills, committee bills, house/senate bill With differences they proceed to conference committee to reconcile Conference Bill is returned to both floors for approval Passed on to the President for approval

Authorization Act Establishes or continues a federal agency, activity or program for a period of time Establishes an upper limit on amount of funds for the program Authorizing legislation for highways began with the Federal-Aid Road Act of 1916 Highway legislation has been part of a larger, more comprehensive, multi-year surface transportation acts since 1978

Deductions to Authorizations Administration takedown – 1.5% upper limit to administer provisions of Title 23 of the United States Code (U.S.C.) – salaries, travel, supplies, office space, etc. Metropolitan Planning – approx 1.25% of authorization after administrative takedown. Finances metropolitan transportation planning activities. Minnesota has 7 Metropolitan Planning Organizations. Non Highway (mass transit, NHTSA, Motor Carrier, Research) – SAFETEA-LU was approximately 21.5%

Apportionments The distribution of funds using formulas provided in law Usually made on first day of federal fiscal year (October 1) for which funds are authorized The funds are then available for obligation by the state in accordance with the State Transportation Improvement Program (STIP)

Appropriations Act Legislative action that makes Formula and Allocated funds available for expenditure with specific limitations as to amount, purpose and duration For the highway program, the appropriations act specifies the actual amount of funds that will be made available (obligation limitation) for the fiscal year

Allocations Discretionary nature (Congressionally directed/earmarked) Distribution of funds that do not have a legislatively mandated distribution formula Limited funding Not every state will receive allocations in any given year Can be withdrawn and reallocated to other states if not used within specified period of time

Allocations (cont.) Also called EARMARKS High Priority Projects (HPP) – earmarked during authorization of multi-year Authorization Act Surface Transportation Projects – similar to HPP projects but vehicle to allow Congress to add projects during annual Appropriation Act Discretionary Projects – Congress adds these projects during annual Appropriation Act. Expected to be spent in the year received

Availability New formula apportionments are added to amounts unused (uncommitted) from previous years and new allocations identified Most Federal Aid Program funds are available for three years beyond the year received (4 year total) Should a state not obligate these dollars within 4 years, the remaining amount lapses (no longer available) HPP and Surface Transportation Projects earmarked are available until expended

Flexibility Hallmark of ISTEA, TEA-21 and SAFETEA-LU Broad highway/transit capital eligibility Transfer of apportionments within Federal- aid highway program Transfer of funds from FHWA to FTA and vice versa

Equity Bonus 1) Each state guaranteed a certain share of total program (apportioned formula plus allocations) 2) Ensures that each state will receive at least 91.5 percent of its share of contributions in Federal FY 2007 and 92 percent thereafter 3) $1 million per year minimum per state Funding Equity Addresses state’s concern that they contribute more in federal user taxes than they receive in federal funds TEA-21 addressed this issue through minimum guarantee SAFETEA-LU addresses through equity bonus

Federal Aid Financing Authorization Act (e.g., TEA-21 & SAFETEA-LU) Annual Distribution (Apportionment) Total Federal Aid Available for a Fiscal Year Obligation Limitation (Federal Government’s Promise to Pay) Reimbursement (Federal Government Pays Its Share) Annual Appropriations Act

Federal Aid Highway Program Not a traditional grant (cash up-front) program Reimbursable program Authorized amounts are “distributed” to the states but no cash is disbursed Projects approved, work started, State pays contractor, State bills FHWA, FHWA pays (reimburses) federal share of costs

Reimbursement

Advance Construction (AC) Congressionally established innovative finance method of using future (anticipated) years’ federal funds to guarantee funding for a project to be let in the current year AC has been used for many years on short-term basis AC law changed in 1995 to provide states with more flexibility in financing projects Key factor here was large number of federal funds remaining unspent on multi-year projects

Benefits of Advance Construction Reduces need to stage project to stay within annual federal target limit Facilitates funding of large project (packaged project) Economies of scale (lower unit costs) Supports the design-build environment attracts larger construction companies to state creating healthy competition Not a loan, therefore no interest to pay Reduced inflation impact Large benefit to motoring public (roadway completed earlier)

3-Year Construction Project Project Packaging is most often preferred: Economies of scale Inflation Lower administration costs

Desire is to only use Obligation Limitation (OL) needed for each year of project. Committing all OL up front reduced availability for other projects that year. 3-Year Construction Project

Federal Fund Categories Formula Categories Interstate Maintenance (IM) National Highway System (NHS) Bridge Replacement and Rehabilitation (HBRRP) Congestion Mitigation & Air Quality (CMAQ) Highway Safety Improvement Program (HSIP) Surface Transportation Program (STP) Enhancements (TEA) Urban Guarantee (> 200 k population) Small Urban (< 200 k population) Any area Equity Bonus

Federal Fund Categories (Cont.) Allocations TEA-21 High Priority Projects 28 projects with balances Appropriation Bills 27 projects with balances SAFETEA-LU High Priority Projects 134 projects Transportation Improvement Projects 3 projects

Planning/Programming Process

State Transportation Improvement Program (STIP) Four year priority list of transportation projects Consistent with: Statewide Transportation Plan Metropolitan planning requirements Air quality requirements Finanically constrained Public involvement

Area Transportation Partnership (ATP)  Roughly coincident with Mn/DOT’s 8 districts  Membership determined at ATP level  Includes Mn/DOT district, MPO or regional development commission representatives, transit representative, city and county perspectives, other key transportation stakeholders  Role is to recommend funding priorities for federal aid funds

Allocation of Federal and State funding to each ATP is by formula Currently based on system size and usage, but transitioning to performance-based factors for 2009 investments Support for reserving limited funding for major bridge preservation projects of statewide significance and major mobility corridor needs Area Transportation Partnership (ATP)

ATPs

STIP Each ATP develops an Area Transportation Improvement Program (ATIP) Mn/DOT’s Office of Investment Management combines ATIPs into document called the STIP Mn/DOT submits STIP to FHWA and FTA for formal approval STIP updated each year. After STIP approval, federal funds may be authorized to implement projects

STIP Amendments Formal Amendments Add a project not listed in STIP Identifying use of Congestion Mitigation/Air Quality, Highway Safety Improvement Program or Enhancement funds Major change in project termini or scope of work Administrative Modifications Advancing a project from 2 nd, 3 rd or 4 th year of STIP to current year Change requests to approved STIP

Project Approval Requirements FHWA needs to approve (authorize) federal commitment Project must be in current STIP or have approved amendment Federal apportionment must be available Federal obligation authority must be available This FHWA approval needs to occur before projects are advertised For TH this is typically 5 ½ weeks prior to bid opening For State Aid/local projects, this is handled by not setting a letting date until federal funds are approved  NO FEDERAL REIMBURSEMENT WITHOUT FHWA APPROVAL

Web Sites FHWA SAFETEA-LU Program Fact Sheets factsheets.htm Mn/ DOT Home Page Mn/ DOT Office of Investment Management Home Page