Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #19 Gateway To Space ASEN / ASTR 2500 Class #19 T-18.

Slides:



Advertisements
Similar presentations
Presented by Marco Christov at the 11th Mars Society Annual Convention, 14 – 17 August 2008, Boulder Colorado. A Mars Heavy Transport.
Advertisements

A GenCorp Company High Thrust In-Space Propulsion Technology Development R. Joseph Cassady Aerojet 22 March 2011.
Ares V RFI Point of Departure Information Package
Exploration Launch Office Scope
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Architecture Team Industry Day Briefing 17 January, 2002.
Space Shuttle Justin Schultz. Space Shuttle Space Shuttle is the first orbital space craft designed for reuse Delivers payloads and a rotation of crew.
Delta Clipper To Boldly Go…. A presentation by: Jason Moore & Ashraf Shaikh.
Minimalist Human Mars Mission Surface infrastructure discussion July 26 th, 2008.
MAE 5495: Launch Vehicle Analysis LECTURE 1 Dr. Andrew Ketsdever Spring 2008.
THE FUTURE PLANS OF NASA FOR HUMAN SPACE FLIGHT; MISSIONS, LAUNCH VEHICLES.
Rocket Power Introduction to Rockets and Missiles Scott Schoneman.
National Aeronautics and Space Administration The Future of Space Exploration Orion, Ares and Beyond.... AIAA / NSC / JPL Town Hall Meeting 26 April 2007.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #18 Gateway To Space ASEN / ASTR 2500 Class #18.
Rocket Power – Part 2 Introduction to Rockets and Missiles Scott Schoneman 4 Nov 03.
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
Space Exploration Technologies Corporation Spacex.com 1 Rocket Road Hawthorne (Los Angeles) CA USA 1212 New York Ave, Suite 1025 Washington DC
Commercial Spaceflight Companies Could this be your ticket to space? 200, Amt: Courtesy of Spaceport America Image credit Virgin Galactic.
 The word "rocket" can mean different things. Most people think of a tall, thin, round vehicle. They think of a rocket that launches into space. "Rocket"
“Fly me to the Moon”. Few can argue there is a more exciting vehicle than the Saturn V One of the most successful craft ever built by NASA, no payload.
Today In Space Current Ventures In Space by NASA, Other Countries and the Private Sector USSRC Proprietary.
Launching to the Moon, Mars, and Beyond
Background The Apollo program sent 12 Americans to the lunar surface between 1969 and 1972, but humans have not set foot on the moon since then. In January.
The Return to Space Exploration Constellation. NASA Authorization Act of 2005 The Administrator shall establish a program to develop a sustained human.
Comprehend why the shuttle was developed Comprehend the space shuttle’s main features Comprehend the shuttle’s legacy The Space Shuttle Program.
November 30, 2006 Space Telescope Science Institute Conference Scott “Doc” Horowitz Associate Administrator NASA Exploration Systems Mission Directorate.
Chapter 24 Space Vehicular Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
A3 Altitude Test Facility
Oh, Thank Heaven for 7-Eleven: Fueling Up in Space with In-Situ Resource Utilization ASTE-527 Final Presentation Riley Garrett.
Constellation Program Overview Mark Geyer Constellation Program Office October 2006.
Current Need Aging space shuttle fleet’s retirement is imminent If the ISS is going to continue operation there needs to be a replacement to get humans.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #14 Gateway To Space ASEN / ASTR 2500 Class #14.
1 SpaceX proprietary data constituting “Confidential Information” under applicable agreements. Tim Hughes Vice President & Chief Counsel.
Team PM8 Eventus Slide 1. Commercial spaceflight has seen increased activity as more privately owned companies invest in the venture. To avoid a catastrophic.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
Copyright © 2008 United Launch Alliance, LLC. All rights reserved. Images Courtesy of Lockheed Martin and The Boeing Company O22P1-478 SPACE Transportation.
LAUNCH VEHICLE DOWNSELECT A Wide Variety of Launch Systems Are Available Today Initial Downselect Constraint Based Upon UMRM Requirements Primary Payload.
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
Introduction to the Altair Project
The Augustine Committee Review of Human Spaceflight Plans Committee Briefing to COMSTAC October 29, 2009 Review of US Human Space Flight Plans Committee.
LRO/LCROSS Launch Preview How Where When Presentation for NASA Solar System Ambassadors and Museum Alliance March 20, 2009 Brooke Hsu, LRO E/PO Lead Brian.
The Shuttle Transportation System Produced by Loren Fletcher (click picture)
Structural Practices Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Structural Design Practices Payload interfaces to launch vehicles.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
Learning Goals  I will be able to identify the names of the space shuttles in NASA’s program.  I will be able to identify two shuttle disasters.
National Aeronautics and Space Administration Ares Project Joel Best / EO10 November 6, 2006 Ares Project Joel Best / EO10 November 6, 2006.
NASA’s Organization National Aeronautics and Space Administration.
The final Space Shuttle has landed… Now what??. The Space Shuttle Since 1981, NASA space shuttles have been rocketing from the Florida coast into Earth.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #18 Gateway To Space ASEN / ASTR 2500 Class #18 T-23.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #19 Gateway To Space ASEN / ASTR 2500 Class #19.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #14 Gateway To Space ASEN / ASTR 2500 Class #14.
2015 in Spaceflight: A year in review Tal Inbar Head, Space Research Center The Fisher Institute for Air & Space Strategic Studies, Israel.
Mission data MissionTotal mission duration [d]Crew size [-] Total mission Δv [m/s] from LEO (including mid-course corrections) Lunar flyby Low lunar.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
Orbital Aggregation & Space Infrastructure Systems (OASIS) Background Develop robust and cost effective concepts in support of future space commercialization.
Dave McGrath ACM Chief Engineer February 18, 2010
The Shuttle Program. Warm Up Questions CPS Questions (1-2) Chapter 7, Lesson 1.
Flight Hardware. Flight Profile - STS Flight Profile - SLS Earth Mars 34,600,000 mi International Space Station 220 mi Near-Earth Asteroid ~3,100,000.
How Astronauts Got Launched to the Moon Created by: Luke Sharman.
The Future of Human Spaceflight *** A Journey to Mars
Callisto Mission LaRC Option
Space Tug Propellant Options AIAA 2016-vvvv
Manned Space Exploration
Space Travel Present & Future
  Robert Zubrin Pioneer Astronautics W. 8th Ave. unit A
Ares I System Requirements Review (SRR)
Introduction to the Altair Project
  Robert Zubrin Pioneer Astronautics W. 8th Ave. unit A
Team A Propulsion 1/16/01.
Presentation transcript:

Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #19 Gateway To Space ASEN / ASTR 2500 Class #19 T-18

One minute:

-Announcements -One Minute Reports -Mid semester Team Evaluation Due -Camera Programming Questions -Rest of Launch Vehicles -Next Classes – Spider (Thur) and Pre-launch inspection (Tues) -> Bring your hardware Today:

- Project help at Space Grant - Most people will help if you schedule a time to get that help - Use Tim May - Hardware? - My next four weeks… Announcements

Announcements

Announcements

Announcements

Announcements

Announcements

Announcements

Announcements

Announcements

One Minute Reports: - What launch vehicle took the Mars Rover to Mars? - Why was China putting that guy in space more important than the X-prize? - What other countries have real serious space programs? - Sea Launch – Private or government? - Cost/kg lower because of Russia/China labor costs? - What is your favorite old rocket? - What made the Saturn V carry so much cargo? - What are some of the reasons rockets blew up? - Do you think Saturn V was a better a launch vehicle to transport humans?

One Minute Reports: - What launch vehicle took the Mars Rover to Mars? - Why was China putting that guy in space more important than the X-prize? - What other countries have real serious space programs? - Sea Launch – Private or government? - Cost/kg lower because of Russia/China labor costs? - What is your favorite old rocket? - What made the Saturn V carry so much cargo? - What are some of the reasons rockets blew up? - Do you think Saturn V was a better a launch vehicle to transport humans?

One Minute Reports: - Why didn’t they pass down the knowledge for the Saturn V? - Which country is the US most likely to work with in the future (space-wise)? - What direction do you think we should take (Augustine report)? - Should we watch the Right Stuff? - Don’t the engineer know that they don’t have enough thrust? - Space elevator replace rockets? - Where do you get to eat under a Saturn V?

One Minute Reports: - Why didn’t they pass down the knowledge for the Saturn V? - Which country is the US most likely to work with in the future (space-wise)? - What direction do you think we should take (Augustine report)? - Should we watch the Right Stuff? - Don’t the engineer know that they don’t have enough thrust? - Space elevator replace rockets? - Where do you get to eat under a Saturn V?

One Minute Reports: - What do we have to have done for preflight inspection? - Can we watch the movie “The Right Stuff?” - If camera stops working, who do we talk to? - How far should we be through our project at this point? - Camera display date and time on picture? - These cameras are evil! - Can we get more hot glue for free? - Why do we use aluminum tape instead of duck tape?

One Minute Reports: - Will we see the results of the team evaluations? - What is the temperature of outer space? - Does our whole group get the same grade? - Will space propulsion be on the test? - What are the three sheets of foam core?

One Minute Reports: - Will we see the results of the team evaluations? - What is the temperature of outer space? - Does our whole group get the same grade? - Will space propulsion be on the test? - What are the three sheets of foam core?

Colorado Space Grant Consortium Launch Vehicles Part 2 Class #18 Launch Vehicles Part 2 Class #18

Present

Present: United States -Shuttle -Atlas -Titan -Delta -Pegasus -Athena -Taurus -Falcon -ARES -Dragon (COTS) -Orion Foreign -France (Ariane) -Japan (H-series) -China (Long March) -Russia (Proton, Buran)

Present: Space Shuttle Thrust:28,200,000 N (6,340,000 lb) Fueled Weight:2,040,000 kg Payload to Orbit:24,400 kg LEO Cost per launch:$245,000,000 Cost per kg:$10,040 SRB Recovery SRB Recovery External Tank External Tank

Present: First Shuttle Flight Video

Present: SRB Separation Video

Present: External Tank Video

Present: Atlas IIAS Thrust:2,980,000 N (670,000 lb) Fueled Weight:234,000 kg Payload to Orbit:8,390 kg LEO Cost per launch:$78,000,000 Cost per kg:$9,296

Present: Atlas II Video

Present: Titan IV Thrust:4,800,000 N (1,080,000 lb) Fueled Weight:860,000 kg Payload to Orbit:21,645 kg LEO Cost per launch:$248,000,000 Cost per kg:$11,457

Present: Titan IV Video

Present:

Present: Delta II Thrust:2,630,000 N (591,000 lb) Fueled Weight:230,000 kg Payload to Orbit:5045 kg LEO 17,000 kg Cost per launch:$60,000,000 Cost per kg:$11,892

Present:

Present:

Present: Delta IV Height m ( ft) Diameter 5 m (16.4 ft) Mass 249, ,400 kg (550, ,616,800 lb) Stages 2 Capacity Payload to LEO 8, ,800 kg (18, ,800 lb) Payload to GTO

Present:

Present: Pegasus Thrust:486,000 N (109,000 lb) Fueled Weight:24,000 kg Payload to Orbit:455 kg LEO Cost per launch:$9,000,000 Cost per kg:$19,800

Present:

Present: Pegasus Video

Present: Ariane 44L (France) Thrust:5,380,000 N (1,210,000 lb) Fueled Weight:470,000 kg Payload to Orbit:9,600 kg LEO Cost per launch:$110,000,000 Cost per kg:$11,458

Present: Ariane 5 (France) Thrust:11,400,000 N (2,560,000 lb) Fueled Weight:737,000 kg Payload to Orbit:18,000 kg LEO Cost per launch:$120,000,000 Cost per kg:$6,666

Present: Ariane V Video

Present: H-2 (Japan) Thrust:3,959,200 N (890,060 lb) Fueled Weight:260,000 kg Payload to Orbit:10,500 kg LEO Cost per launch:$190,000,000 Cost per kg:$18,095 Video

Present:

Present: H2 Video

Present: Long March CZ2E (China) Thrust:5,922,000 N (1,331,000 lb) Fueled Weight:464,000 kg Payload to Orbit:8,800 kg LEO Cost per launch:$50,000,000 Cost per kg:$5,681

Yang Liwei

Present: Sea Launch / Zenit Widest Diameter: 14 feet Overall length: Approximately 200 feet All stages are kerosene/liquid oxygen fueled Capacity to geosynchronus transfer orbit: 6,000 kg

Present: Proton D-1 (Russia) Thrust:9,000,000 N (2,000,000 lb) Fueled Weight:689,000 kg Payload to Orbit:20,000 kg LEO Cost per launch:$70,000,000 Cost per kg:$3,500

Present:

Soyuz: Gross mass: 98,100 lbm Propellant: 86,400 lbm Diameter: 8 ft 10 in Length: 64 ft 4 in Burn time: 118 s Thrust 813 kN (183 klbf) at liftoff Specific impulse 245 kgf·s/kg (2.40 kN·s/kg) at liftoff Specific impulse 310 kgf·s/kg (3.04 kN·s/kg) in vacuum

Present:

Present:

Present:

Present:

Present:

Present:

Present/Past: Energia (Russia) Thrust: 34,800,000 N (7,820,000 lb) Fueled Weight: 2,400,000 kg Payload to Orbit:90,000 kg LEO Cost per launch:$764,000,000? Cost per kg:$Not Known

Present/Past: Buran “Snowstorm” (Russia) First and only launch November 15, 1988 No one on board - Life support not tested - CRT’s did not have software Only 2 orbits - This was limited because of computer memory Landed by autopilot

Present/Past: Aero Buran was test unit Had 24 test flights 3 others were being built - Pitchka (Little Bird) - Baikal (Typhoon) All dismantled in 1995

Present/Past:

Present/Past:

Present/Past:

Present/Past:

Present/Past:

Present/Past:

Future

Future/Past:

Falcon 1: -Length: 21.3 m (70 ft) -Width: 1.7 m (5.5 ft) -Mass: 38,555 kg (85 klbs) -Thrust on liftoff: 454 kN (102 klbf) -Launch video

Future:

Falcon 9: -Length: 54.3 m (178 ft) -Width: 3.6 m (12 ft) -Mass (LEO, 5m fairing): 325,000 kg (716 klb) -Mass (GTO, 4m fairing): 323,000 kg (713 klb) -Thrust (vacuum): 4.4 MN (1 M lb)

Dragon: -Fully autonomous rendezvous and docking with manual override capability in crewed configuration -Pressurized Cargo/Crew capacity of >2500 kg and 14 cubic meters -Down-cargo capability (equal to up-cargo)

Dragon: - Supports up to 7 passengers in Crew configuration -Reaction control system kg of propellant from sub-orbital insertion to ISS rendezvous to reentry -Designed for water landing under parachute for ocean recovery

Dragon: -Lifting re-entry for landing precision & low-g’s -Ablative, high-performance heat shield

Future/Past:

NASA’s Exploration Roadmap Lunar Lander Development Ares V Development Earth Departure Stage Development Surface Systems Development Orion CEV Development Ares I Development Space Shuttle Ops Lunar Outpost Buildup Initial Orion Capability Ares/Orion Production and Operations Lunar Robotic Missions Science Robotic Missions 1st Human Orion Flight 7th Human Lunar Landing Early Design Activity Demonstrate Commercial Crew/Cargo for ISS Demonstrate Commercial Crew/Cargo for ISS Mars Expedition Design

Ares I Crew Launch Vehicle Earth Departure Stage Orion Crew Exploration Vehicle Lunar Lander ELO Ambassador Briefing – 78 Ares V Cargo Launch Vehicle Our Exploration Fleet

Crew Lander S-IVB (1 J-2 engine) 240k lb LOx/LH 2 S-II (5 J-2 engines) 1M lb LOx/LH 2 S-IC (5 F-1 engines) 3.9M lb LOx/RP Lunar Lander Earth Departure Stage (EDS) (1 J-2X) 499k lb LOx/LH 2 Core Stage (5 RS-68 Engines) 3.1M lb LOx/LH 2 Upper Stage (1 J-2X) 280k lb LOx/LH 2 5-Segment Reusable Solid Rocket Booster (RSRB) Space Shuttle Ares I Ares VSaturn V Height: ft Gross Liftoff Mass: 4.5M lb 55k lbm to LEO Height: 321 ft Gross Liftoff Mass: 2.0M lb 48k lbm to LEO Height: 358 ft Gross Liftoff Mass: 7.3M lb 117k lbm to TLI 144k lbm to TLI in Dual- Launch Mode with Ares I 290k lbm to LEO Height: 364 ft Gross Liftoff Mass: 6.5M lb 99k lbm to TLI 262k lbm to LEO Two 5-Segment RSRBs Orion CEV Building on a Foundation of Proven Technologies – Launch Vehicle Comparisons –

Ares I Elements Stack Integration ~25 mT payload capacity 2 Mlb gross liftoff weight 315 ft in length NASA-led Stack Integration ~25 mT payload capacity 2 Mlb gross liftoff weight 315 ft in length NASA-led Upper Stage 280 klb LOx/LH 2 stage in. (5.5 m) diameter Aluminum-Lithium (Al-Li) structures Instrument unit and interstage Reaction Control System (RCS) / roll control for 1st stage flight Primary Ares I avionics system NASA Design / Contractor Production First Stage Derived from current Shuttle RSRM/B Five segments/Polybutadiene Acrylonitrile (PBAN) propellant Recoverable New forward adapter Avionics upgrades ATK Launch Systems Upper Stage Engine Saturn J-2 derived engine (J-2X) Expendable Pratt and Whitney Rocketdyne Orion 198 in. (5 m) diameter Orion 198 in. (5 m) diameter Interstage Cylinder Interstage Cylinder LAS Spacecraft Adapter Instrument Unit

Ares V Elements Stack Integration 65 mT payload capacity 7.3 Mlb gross liftoff weight 358 ft in length NASA-led Stack Integration 65 mT payload capacity 7.3 Mlb gross liftoff weight 358 ft in length NASA-led Earth Departure Stage TBD klb LOx/LH 2 stage in (5.5-m) diameter Aluminum-Lithium (Al-Li) structures Instrument unit and interstage Primary Ares V avionics system NASA Design / Contractor Production Core Stage Two recoverable five-segment PBAN-fueled boosters (derived from current Shuttle RSRM/B). Five Delta IV-derived RS-68 LOx/LH 2 engines (expendable). LSAM TBD LSAM TBD Spacecraft Adapter Interstage

NASA’s Exploration Transportation System

Our Nationwide Team Dryden Ames Kennedy Langley Marshall Glenn Goddard Stennis ATK Launch Systems Pratt and Whitney Rocketdyne Jet Propulsion Laboratory Johnson Michoud Assembly Facility

Future/Past:

Future/Past:

Future/Past:

Future/Past:

Future/Past:

Future/Past:

Sci-Fi Future: -$10 Billion

Future/Past:

Sci-Fi Future:

Future/Past:

Future/Past: -Crew Return Vehicle -X-38

Future/Past: X-38 Video

Future/Past:

Future/Past: -X-33 -VentureStar

Future/Past:

Future/Past:

Future/Past:

Future: - Delta IV Heavy

Future:

Future: -Shuttle Fly-back boosters

Future: -Hyper-X Hyper-X

Future: - X-37

Future: Ion Drive Video

Sci-Fi Future

Sci-Fi Future:

-Anti-matter

Sci-Fi Future: -Boussard Ramjet Fusion Propulsion

Sci-Fi Future: -Electrodynamic Tether

Sci-Fi Future: -Jovian Electrodynamic Tether

Sci-Fi Future: -Laser Propulsion

Sci-Fi Future: -Beamed Energy Propulsion

Sci-Fi Future: -Pulsed Detonation Rocket

Sci-Fi Future: -Space Based Laser Re-boost

Sci-Fi Future: -Plasma Rocket

Sci-Fi Future: -Plasma Rocket

Sci-Fi Future: -Space Elevator -Original concept as old as Mesopotamia: Biblical “Tower of Babel” and “Jacob’s Ladder” -Five Critical Technologies (Source: MSFC Study) -High Strength Materials -Tension Structures -Compression Structures -EM Propulsion -Supporting Infrastructure -May Lower Launch Costs to <$10/kg!

Sci-Fi Future: -$10 Billion -To LEO or GEO? - LEO: Possible Today - Lower end just inside atmosphere - Space plane flies to lower end for cargo times the cargo lifted by SSTO - GEO: YR Time Frame: Years for enabling technologies - YR for actual construction

Sci-Fi Future:

-$10 Billion