Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.

Slides:



Advertisements
Similar presentations
NDVCS measurement with BoNuS RTPC M. Osipenko December 2, 2009, CLAS12 Central Detector Collaboration meeting.
Advertisements

W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Proton test facilities Uppsala, TSL, GWC, B-line (Blue hall): Energy ±0.80 MeV. Flux reduced from normal 2·10 8 s -1 to 900 s -1 with a profile as.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Software parallel session summary MICE collaboration meeting INFN, Frascati 27/6-05.
B. Jakobsson, CWG meeting, June 18-19, 2007: Intoductory slide
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
27 Jun 2005S. Kahn -- Tof/Ckov Status1 Status of TOF and Ckov Sub- packages in G4Mice Steve Kahn 27 June 2005.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
Overview of the GlueX Tagger and Photon Beamline..
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
G4 Validation meeting (5/11/2003) S.VIRET LPSC Grenoble Photon testbeam Data/G4 comparison  Motivation  Testbeam setup & simulation  Analysis & results.
E. A. Albayrak, HCAL Meeting, Fermilab, Nov HE CALORIMETER DETECTOR UPGRADE R&D STATUS E. A. Albayrak for The University Of Iowa Fairfield University.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
CaTS and Dual Readout. CaTS – Calorimeter and Tracker Simulation Describe detector in gdml file (xml like) Define.
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
The large-angle photon veto detector for the P326 experiment at CERN R. Fantechi INFN – Sezione di Pisa on behalf of the P326/NA62 Collaboration Villa.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
Prototypes photon veto detectors for NA62 experiment CERN M. Raggi - INFN/Frascati for the NA62 Photon Veto Working Group LNF, RM1, NA, PI, SOFIA First.
WP 22 – SciFi Development and Characterisation of Inorganic Scintillating Fibers Made of LuAG:Ce and LYSO:Ce S. Diehl 1, R. Novotny 1, Aubry Nicolas 2.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Activities and Results from PNPI GATCHINA
An Active TARget for MEG-II, a status report
The LHCb Calorimeter system
Ultra fast SF57 based SAC M. Raggi Sapienza Università di Roma
LXe Alignment with X-rays
Gamma-ray Large Area Space Telescope ACD Final Performance
Software development status in Rome
GLAST LAT tracker signal simulation and trigger timing study
Prototype activities update
IFR detector mechanics
OPERETTE TEST BEAM EXPERIMENT :
Preparation of the CLAS12 First Experiment Status and Time-Line
SIDDHARTA Setup SIDDHARTA Kaon monitor focusing quads bhabha monitor
Status Report and highlights from workshop II
LC Muon Detector Development Overview
Presentation transcript:

Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti (KLOE prototype) 5.Report on Tagged Photon beam Presented by P.Valente

Conclusions from last report

1. Status of G4 simulations Concentrating on creating a full LAV structure for the TileCal solution… …since SpaCal simulation is CPU demanding and still has some problem (thousands of fibers inside!)

1. Status of G4 simulations X 0  Full LAV layout, but 42.5 cm depth  No projectivity (straight bottom surface)

1. Status of G4 simulations X 0  Realistic materials, including:  Aluminum enclosure  Paper wrapping for tiles

1. Status of G4 simulations

 Realistic light yield, 25 p.e./MeV  No threshold applied  Look at 3 inefficiencies:  not seen, not interacting  seen by nearest ring  seen by any of the rings

1. Status of G4 simulations

 Inefficiency = 6×10 -4  Essentially punch- through, apart from border effects  X 0 are not enough!

2. Discussion on LAV structure  15 X 0 are not enough!

2. Discussion on LAV structure

1. Status of G4 simulations

Solve SpaCal problems…

Add to To-Do List

One more point to To-Do list: check effect of projective shape (Niels) 50 mrad

3. Discussion on readout  FADC vs. TDC/ADC drives a number of choices for the readout implementation

Yet another To-do for simulators… 1.Persistency at the hit level 2.Second step for digitization, signal shaping, etc. Optimize CPU Easy to change readout/shaping configuration

3. Discussion on readout Discussion has just started… Some of the questions on the table:

3. Discussion on readout

 Electronics on-detector  Virtual technical gallery

3. Discussion on readout  Crucial, in order not to spoil the inefficiency!  Paper reference histograms will not be adequate…

4. News on Spaghetti Lead Scintillating fiber Winston concentrator light guide …a reminder

4. News on Spaghetti How to make spaghetti? Go to Frascati… 1. Machine for making grooves in lead foils 2. Working prototype Black box: Light guides+PMT’s

4. News on Spaghetti Total energy distribution for 0,1,2,3… electrons Electrons energy = 500 MeV Prototype readout

 General description in the proposal as a backup solution  Still a lot of details missing, so…  …work on SpaCal simulation! Establish performance Compare with TileCal Refine design Compare realistic costs with TileCal  In the famous To-Do list of simulation activities…

5. Report on photon beam …where it will be

5. Report on photon beam Electron beam parameters

5. Report on photon beam Electron facility working efficiently since almost 3 years Good performance, good beam diagnostics Project of tagged photon beam in advanced status

5. Report on photon beam Active target inserted in the e- beam (Si microstrip, two x-y planes) Electrons from time to time irradiate Bremsstrahlung photons (thickness=0.02 X 0 ) Si microstrip tagging detectors inside the magnet measure the deflection of emitting electrons Impact point correlated with  E i.e. with E 

5. Report on photon beam

Signal pulse height vs. number of incoming electrons Beam spot on tagging target 3 mrad 13 mrad

5. Report on photon beam All photons Tagged photons: Only 2/7 tagger modules No analysis on energy resolution Poor statistics: all 384 strips together

5. Report on photon beam Si tracker 241 MeV tagged  converting in the Si tracker

5. Report on photon beam Geant 3 simulation…

5. Report on photon beam

Conclusions A long To-Do list for simulation activities…  a more and more detailed simulation of the LAV At the same time, start thinking at other important issues:  Readout  Signal shaping  Trigger  Monitoring Project for tagged photon beam at BTF (LNF) is advanced  Final installation in July, first runs in August  Tagging efficiency has to be carefully studied  Could be very useful even if could not be reached “Geant” simulation of logo…