RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
Link Board Upscope Frascati group Napoli group Warsaw group.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
GEMs for CMS Upgrade Muons are quite central to most of the Physics that would unfold from “CMS” Triggering and tracking with muons, is therefore a challenging.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
SiO x coated fiber optic sensor for gas monitoring in RPC S. Grassini 1, M. Parvis 2, M. Ishaiwi 2 1 Dip. di Scienza Applicata e Tecnologia 2 Dip. di Elettronica.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Use of fiber optic technology for Relative Humidity monitoring in RPC detectors- M.A. RPC Use of fiber optic technology for Relative.
The GEM Proto-Collaboration (“GEMs for CMS”) Marcus Hohlmann, Florida Tech Interim Chair of Proto-Collaboration Board 2 nd CMS Workshop on High-eta Muon.
Progetto CMS RPC: Preventivi 2017
University of Wisconsin
Production ad Quality control of RPCs for the CMS muon barrel system
Atlas: Upgrade Phase I Massimo Della Pietra.
RPC Barrel HV & LV system Lappeenranta University
HCAL M&O-B Budget CMS Finance Board
Jan Królikowski Warsaw University
Electronics for RPC Upscope
CMS Goal of the experiment
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
RPC Detector Control System
LINK BOARD PROJECT UPGRADE
RPC Detector Control System
on behalf of Barrel RPC Collaboration
HL-LHC upgrade at IPHC news
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
LINK BOARD PROJECT UPGRADE
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

RPC project Upgrade phase I Pierluigi Paolucci

RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with 3 rings of chambers The present system has 3 disks equipped with 2 rings of chambers – Barrel trigger is done with 6 layers – Forward trigger is now 3/3 (design was 3 out of 4) Phase I: 2 rings in disk 4 th Phase II: |η| > 1.6 CNS novembre 20102P. Paolucci (Napoli)

Institutions The groups from Pakistan, China and Korea have already committed themselves to this completion. In addition, groups from Belgium, India, and Egypt have confirmed their involvement in the project while negotiations with Italy are under way to provide the off-detector electronics. Other countries (Finland, Poland) have expressed an interest in joining the project, although they have not yet committed to any financial contribution. Recently interest has been expressed from Iran and Colombia and negotiations have started to define possible contributions and areas of involvement. CERN will joint the RPC project In red the approved CNS novembre 20103P. Paolucci (Napoli)

Chamber production and test High Pressure Laminate (HPL): – Raw material production at the Puricelli industry near Milan – Quality check and resistivity measurement at INFN Pavia The gas gaps: – chambers will be produced by KODEL at Korea University. A total of about 660 (432 + spares ) gaps are needed Honeycomb boxes and auxiliary parts will be produced in Beijing Axicomb Technology Co., Ltd (China) Readout strips will be produced in Beijing Gaonengkedi GT Co., Ltd (China) Gap and chamber test sistes: – CERN site at 904: CERN and Pakistan group, which has an outstanding experience in chamber assembly, will provide qualified manpower for the assembly and test. – Belgium site: The chamber construction will be the main effort of the University of Gent. The manpower to perform the assembly will be provided by both the University of Gent and the Vrije Universiteit Brussel. – India site: Under India-CMS-RPC collaboration, RPC assembly and testing would be done at two sites: Nuclear Physics Division-Bhabha Atomic Research Centre (NPD- BARC) at Mumbai; and Panjab University at Chandigarh. CNS novembre 20104P. Paolucci (Napoli)

Installation and commissioning The upgrade of the forward region is part of the RPC project and so all the people and experts will be involved in the commissioning and integration of the full system Bari group ( Colaleo, Iaselli, Loddo, Maggi, Nuzzo, Pugliese ) will be involved in the quality control program: Quality control of single gap at CERN – 1 physicist + 2 technicians (0.3 FTE) Quality control of chamber production at CERN – 1 physicist + 2 technicians (0.3 FTE) Quality control of FEB production 1 engineer ( 0.2 FTE) CNS novembre 20105P. Paolucci (Napoli)

Off-chamber Electronics CNS novembre 20106P. Paolucci (Napoli)

Electronics The 144 new chambers have to be equipped with FEB, Link board and power systems : FEB and distribution boards will be produced under the F. Loddo supervision (project founds) Power system will be ordered to the CAEN under the Napoli supervision (Pakistan budget) The CMS electronic/trigger groups have strongly recommended to review to old project and to implement all the protections and improvements needed (comes from the experience accumulated in these years) The main goals are: build an updated and more robust system and involve more groups in the RPC trigger in order to compensate for the Warsaw dependence. Link Board system will be designed (revision of the old project) and produced by Napoli, LNF and Warsaw groups: – link board crates (3.000 euro each) 78 K – link boards (800/900 euro each) 124 K – control boards (900/1100 euro each) 29 K – cable and connectors 30 K – LV system (CAEN) 50 K – 7% Spare for the whole RPC system costs 50 K o Total cost of the Link Board Project is about 361 Keuro CNS novembre 20107P. Paolucci (Napoli)

Link board interests and manpower Napoli is interested in the design of the up-to-date system – P. Paolucci, S. Buontempo, N. Cavallo (sabbatical year in the 2011) – Electronic Service: 8-7 months in the 2010 and 2011 – Napoli is now (2010) designing the up-to-date LB system including: LVDS suppressor, LV regulators and new FPGA configuration. – First design almost ready (80%). Cost estimation ready LNF is looking at the test and commissioning of the system – L.Benussi, L.Passamonti (Tech.), D.Pierluigi (Tech.) and Electronic Service: 3-4 months in 2011 Warsaw is in charge for the test, commissioning and installation of the system Warsaw is the only group having the full expertise of the link board hardware and firmware system The participation of new groups at the LB project has been strongly recommended by the CMS management CNS novembre 20108P. Paolucci (Napoli)

Preliminary schedule JFMAMJJASONDJFMAMJJASOND LB prototype LB test CB prototype CB test Lbox production Test 904 CNS novembre 2010P. Paolucci (Napoli)9 Installation and commissioning in the 2013 Prototypes test at CERN:1 tech + 1 phys for 3 months (2011) + Warsaw Test at CERN (blg 904):1 tech + 1 phys for 6 months (2012) + Warsaw Installation:2 tech + 1 phys for 6 months (2013) + Warsaw Commissioning:1 phys for 3-4 months (2013) + Warsaw

T/H sensors Sensors for T and H monitoring in RE4 new endcap stations and for existing stations RE2 and RE3 (in collaboration with LNF, Napoli and CERN) Expertise on FBG sensors in HEP detectors (FINUDA, BTEV, CMS) and industrial applications S.Bianco, M.Caponero, S.Colafranceschi (dott.), G.Breglio NA, S.Buontempo, L.Passamonti (tech), D.Pierluigi (tech), M. Giordano (ric) e A. Cusano (ric) Explore possibility of using optical sensors for gas contaminants (PRIN funded) F.Felli, M.Parvis, G.Saviano RESOURCES Clean room in Frascati for sensors assembly and QA/QC Lab space in Frascati Use of lab facilities in Napoli, Ing. Roma1, Polito Total core budget PRELIMINARY Frascati + Napoli 75 k CERN 45k CNS novembre P. Paolucci (Napoli)

Cost and manpower CERNChina Belgiu mIndiaItalyKorea Pakista nEgypt Total KSF CNS novembre P. Paolucci (Napoli)

Conclusions 1.Bakelite test – Pavia lab. 2.Chamber and single gap test and commissioning – Bari 3.Electronic production supervision – Bari/Napoli 4.Link board system (360 K) – Napoli, LNF and Warsaw – Final and formal agreement with Poland still not ready 5.T/H sensors (75 K) – Napoli (centro di competenza con CNR ed Univ. del Sannio), LNF 6.Project has been already discussed in CMS Italy and in the Italian Institution. I.N.F.N. foreseen contribution is 600/4200 KCHF CNS novembre P. Paolucci (Napoli)

CNS novembre 2010P. Paolucci (Napoli) T,H Sensors for RE2,3,4 RPC chambers Frascati, Napoli, CERN Temperature (T) and relative humidity (H) are parameters that affect the response of RPC detectors. Typical requested precisions are o C for temperature monitoring and +-2% for H monitoring. Optical sensors based on the Fiber Bragg Grating (FBG) are radiation hard; insensitive to magnetic field; precise; no electrical noise; ease of installation; minimal cabling; precise. Each new RE4,and existing RE2 and RE3 chamber will be equipped with one FBG sensor for T measurement. H monitoring will be performed via conventional electronic sensors. An R&D is in progress to develop optical sensors for HF detection in the RPC gas mixture. Bibliography 1.RPC Upscope Technical Design Report 2.L.Benussi et al., ``The Omega-Like: A Novel Device Using Fbg Sensors To Position Vertex Detectors With Micrometric Precision,'' Nucl. Phys. Proc. Suppl. 172 (2007) 263; M.Caponero et al., Optical sensors at INFN Frascati for CMS: past, present and future, CMS Upgrade week April A. Laudati, G. Parente, G. Lanza, A. Cusano, A. Cutolo, M. Giordano, S. Balzarini, "A New Hydrophone Based on Fiber Bragg Grating Sensor", PHOTONICA Exp. 2008, November 2008, Milano, Italy ; A. Laudati, G. Parente, G. Lanza, A. Cutolo, A. Cusano, G. Breglio, M. Giordano, A. Antonelli, G. Bocchetti, "Railway Monitoring and Train Tracking by Fiber Bragg Grating Sensors: A Case Study in Italy", FIRST MEDITERRANEAN PHOTONICS CONFERENCE June 2008, Ischia, Italy. 4.N.Beni, S4CMS: A combined monitoring of sensors in CMS experimental site, presented at Siena 2010.