STGC Trigger Electronics sTGC Trigger Electronics ATLAS New Small Wheel Milestone Meeting 17-18 January 2013 Lorne Levinson L. Levinson, sTGC Trigger Electronics1NSW.

Slides:



Advertisements
Similar presentations
20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Ancillary firmware for the NSW Trigger Processor Lorne Levinson, Weizmann Institute for the NSW Trigger Processor Working Group NSW Electronics Design.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Overview of NSW trigger electronics Lorne Levinson NSW Electronics Design Reviews, February Lorne Levinson, Overview of NSW trigger electronics.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Erez Etzion, Tel Aviv University
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
Muon New Small Wheel sTGC Trigger for Phase I ATLAS New Small Wheel Electronics Workshop Les Houches December 2012 Lorne Levinson L. Levinson, December.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
The ATLAS New Small Wheel Trigger Lorne Levinson For the ATLAS NSW collaboration ACES workshop, 19 March 2014 Thanks to my NSW colleagues for many slides.
Elec 関係、情報収集 ( 中。。 ). Design review for NSW electronics (2015/2) Design review for NSW ASIC (2015/4)
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Transfering Trigger Data to USA15 V. Polychonakos, BNL.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
STGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
Prototyping electronics and data acquisition for sTGC
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Overview of NSW trigger electronics Lorne Levinson Weizmann Institute of Science TDS and ART ASIC Design Review, 21 July Lorne Levinson, Overview.
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Muon New Small Wheel sTGC Trigger for Phase I ATLAS NSW sTGC Workshop July 2012 Lorne Levinson, Nachman Lupu, Giora Mikenberg, Julia Narevicius,
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
DAQ and TTC Integration For MicroTCA in CMS
Kenneth Johns University of Arizona
ATLAS calorimeter and topological trigger upgrades for Phase 1
Atlas: Upgrade Phase I Massimo Della Pietra.
Optical data transmission for
CMS EMU TRIGGER ELECTRONICS
ATLAS L1Calo Phase2 Upgrade
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
NSW Electronics workshop, November 2013
Example of DAQ Trigger issues for the SoLID experiment
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

sTGC Trigger Electronics sTGC Trigger Electronics ATLAS New Small Wheel Milestone Meeting January 2013 Lorne Levinson L. Levinson, sTGC Trigger Electronics1NSW Milestone Meeting, 17 Jan 2013

L. Levinson, sTGC Trigger Electronics2

Centroid algorithm L. Levinson, December 2012 sTGC Electronics Overview, Les Houches NSW Electronics Workshop 3 Use average of centroids in each quad to define space points R1 & R2 1, 2, or even 3 of the 4 centroids of a quadruplet are omitted in averaging if: –  -ray's: wide (>5 strips) – Neutrons: large charge or wide – Noise: single strip – Pileup, i.e. pulse in a component strip is active before the trigger

Read out ASD has pipeline and derandomizer. – Supports a token readout where up to 32 ASDs can share, in sequence, a serial output line (empty ASDs are skipped) A chain of ASDs can be connected to one GBT E-link – Optimize number of chains versus their bandwidth depending on expected occupancy GBTs for read out on Level-1 Accept: – all strip, pad, wire ASDs: 1-2 GBTs for each of 3 multiplets in one 1/16 th  4x16 = 64 fibre links per side from NSW periphery to USA15 – Pad trigger – Centroid finder input (from TDS) and output (to SL) The same GBTs can do the configuration of the ASD and TDS and provide the TTC signals. (Pad Trigger GBT configures Pad Trigger and Router.) There will be a common ROD for the sTGC and MicroMegas. – Platform/technology not yet decided L. Levinson, December 2012 sTGC Electronics Overview, Les Houches NSW Electronics Workshop 4

Builds tower coincidences from 3-out-4 coincidences in the two quads Identifies which bands of strips should be read out to the centroid logic – Pad signals synchronized to BC clock in the ASD or TDS ~1549 (1387) pad inputs per large (small) sector – serialized 32:1 by Trigger Data Serializer ASIC & transmitted in 1 BC On-periphery so it can be programmable Provides the BCID tagging of the strip trigger data Pad trigger L. Levinson, December 2012 sTGC Electronics Overview, Les Houches NSW Electronics Workshop 5 32

BCID synchronization Note that BCID is defined by the pad logic BCID is assigned to strip data in TDS ASIC and pushed thru’ the system No need to synchronize along the path Resynchronized to BC on output to Sector Logic The Router is passive: it merely choses the active channel and routes it to the output optical link – (GBT cannot be used: its Tx thru’ Rx latency is too high (~175ns)) L. Levinson, December 2012 sTGC Electronics Overview, Les Houches NSW Electronics Workshop 6

Basics of triggering with pads NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics7 from Daniel Lellouch Pivot MM Confirm Trigger: 3-out-of 4 & 3-out-of-4

Pad definitions NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics8 All lot of recent work by Giora Mikenberg and Daniel Lellouch on pad geometry. on the NSW Wiki Zoom to see details from Daniel Lellouch

NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics9

Improving granularity by Pad staggering Pivot Layer 1 Pivot Layer 2 NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics10 from Daniel Lellouch

Pivot/Confirm wedges are also staggered wrt each other: 1/4 th pad granularity Pivot Layers 1&2 Confirm Layers 1&2 NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics11 from Daniel Lellouch

Shift pads to reduce complexity, accidentals Pivot Layers 1&2 Pivot Layers 3&4 Tracks disperse between layers due to multiple scattering, z-spread of IP, and bending by magnetic field. Shift reduces complexity of pad logic and accidental coincidences: for pad j, need to look for coincidence in next layer only in pad j+1, not j±1 J+1 J NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics12 from Daniel Lellouch

Complete picture Pivot Layers 1&2 Confirm Layers 3&4 Confirm Layers 1&2 Pivot Layers 3&4 NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics13 from Daniel Lellouch The various trigger towers and the logic defining them for such an over- lapping scheme has been described by a fast Monte Carlo which is being used to evaluate and check the scheme.

Configuration of 12x4 VMM ASDs NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics14 Each VMM has 1072 configuration bits. Shifted in and out serially ADC with serial output will be added (Technion). Potentially useful for chamber testing with cosmics at construction sites

Latency – recent changes Fiber to USA15: 5.5 to 5ns/m (495 → 450ns) – Specified as a T/DAQ requirement for all systems ASD latency: from 10ns → 25ns (measured) With FADC, strip data now waits for the Pad Trigger – Use pulse from falling edge of threshold-to-peak – Adds 25ns wait for peak compared to pulse from threshold crossing Added better estimates of TOF and delays to/from Pad trigger Centroid runs at least 250MHz (was 200MHz, expect more improvement) – Worst case: 65ns → 52ns Increased estimates of latency for the serial links from TDS to Router and from Centroid Logic to Sector Logic  Essentially no net change on total latency estimate. NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics15

Latency requirement: <1050 ns L. Levinson, sTGC Trigger Electronics16NSW Milestone Meeting, 17 Jan 2013 Latency from the interaction point, through the sTGC trigger logic for the NSW to the Sector Logic in USA-15. All times are estimates, except for the centroid finder and the VMM1 ASD latency which have been measured.

Combined MM-sTGC trigger Will probably use ATCA for USA15 trigger modules Both MM and sTGC trigger modules in same crate One or two ATCA crates per side MM and sTGC trigger modules communicate via ATCA backplane ATCA crate (14 slots) board is 8U high x 28cm deep. – Official ATLAS recommendations for ATCA almost ready e.g. TTC is external to the crate, not in the backplane – full mesh backplane, 6-10G per lane What to combine??? Vectors Probably not hits How to combine??? Exchange data Identical merging Only one sends to SL NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics17

Issues – NSW Elx working groups WG1: VMM analog issues On-chamber topics: VMM digital/readout Companion “TDS” chip TTC distribution config of VMM+TDS Connections to GBT, GBT and readout fibers to USA15 On-chamber DCS: SCA, sensors, etc. Lay-out of the on-chamber electronics Power, cooling, shielding & grounding WG3: Backend Backend readout, DCS, configuration, trigger and event data monitoring WG2: Trigger data transport High speed serializer for TDS, Router for sTGC (and MM if not using GBT for trigger) sTGC Router on NSW periphery WG4: Trigger Trigger backend platform and interfacing to TTC sTGC trigger – Pad trigger – USA15 trigger logic – Readout of trigger info (incl pads) MM trigger – USA15 trigger logic – Readout of trigger info NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics18

NSW electronics: Critical issues TDS ASIC – ASICs take time – Michigan and Chile interested On-chamber 6Gb/s serializer + electro-optics – Serializer: SMU for Lar: 16 bits X 500Mz = 8Gb/s: in R&D – Does an appropriate commercial serializer exist? – Electro-optics: Versalink (<~7Gb/s?) from CERN ESE: exists ATLAS Readout Upgrade Working group – Will define Phase II requirements which we must meet – Moving towards a Common ROD(s). Natural for us to participate Power and cooling: 1.2V on detector NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics19

The end NSW Milestone Meeting, 17 Jan 2013L. Levinson, sTGC Trigger Electronics20

27-28 June 2005 EBEX Collaboration Meeting -- Lorne Levinson, Weizmann 21 ATCA PICMG 3.0 specification NO backplane bus: Full mesh or dual redundant star – via 100  differential serial interconnects – supports 1G E’net, Infiniband, PCI-Express, Fibre Channel, … 8U high by 280mm deep – c.f. VME: 6U or 9U Single 48V DC distribution  local on-board generation/regulation of all voltages Wider front panel for user IO, mezz, cooling – 6HP (1.2”) c.f. 4HP for VME Dual starFull mesh