PREZENTACJA WSPÓŁFINANSOWANA PRZEZ UNIĘ EUROPEJSKĄ ZE ŚRODKÓW EUROPEJSKIEGO FUNDUSZ SPOŁECZNEGO W RAMACH PROJEKTU MBM – KIERUNEK ZAMAWIANY.

Slides:



Advertisements
Similar presentations
Employ the Ace! Katarzyna Matynia SYNAPSIS Foundation, Poland Paving the way to employment of people with an ASD.
Advertisements

MPP für Physik München Sven.Vogt Tel.: IBL CO2 cooling meeting Junction box Manifold box Bart Verlaat,Jan.
Lab Course / Praktikum: Winter Semester 2011/2012 Project Management and Software Development for Medical Applications Computer Aided Medical Procedures.
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
HVACR316 - Piping Piping and Fitting.
Pneumo Kit Manufacturing Instructions for assembling the pneumatics workshop kits Questions? Contact Will Durfee, Version:
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Technical Vocational Schools (TEE). Secondary schools (duration 3 years) C.V.T. GEORGIKI ANAPTIXI C.V.T. GEORGIKI ANAPTIXI Naples 9-10/10/2006.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
Mechanical Design Of Cooling Layout Thermal Test of Test Module Type 0
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
© Swagelok Company, 2004 Modular Platform Components (MPC) Overview John Wawrowski Swagelok Company Solon, Ohio NeSSI Workshop May 6, 2004.
Dolce La Fleur The New You…. Christian Dior … the new era I would like to introduce to you… Dolce La Fleur …a brand new product design for the well known.
Update on the Gas-panel for the Target Li Ye Mississippi State University M PRad Collaboration meeting (09/13/13)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
Pneufit push-in fittings For general purpose pneumatic applications.
HVAC523 Piping and Fittings.
PREZENTACJA WSPÓŁFINANSOWANA PRZEZ UNIĘ EUROPEJSKĄ ZE ŚRODKÓW EUROPEJSKIEGO FUNDUSZ SPOŁECZNEGO W RAMACH PROJEKTU MBM – KIERUNEK ZAMAWIANY.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
1 HVACR216 - Hydronics Pipe support and Pipe fittings.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
© Swagelok Company, 2003 Swagelok confidential. For internal use only. © Swagelok Company, UW Series Bellows Valve BPVC ASME III Classes 1,2,3 Canada.
Model 2537A Training Course Detailed Instrument Description Rev: Nov
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
TRT active gas leak repairing F. Perez, C. Degeorge, S. Katunin, I. Zhukov, V. Myalkovskiy, S. Konovalov, A. Romaniouk, H. Danielsson, A. Catinaccio, K.
1 HVACR316 - Piping Copper Tubing and Fittings. 2 2 Safety Refrigerant cylinders should be stored and transported in the upright position to keep the.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Status of RF stations for NICA project MAC meeting october 2015.
Lab Course / Praktikum: S ummer Semester 2012 Project Management and Software Development for Medical Applications Computer Aided Medical Procedures (CAMP),
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Unit 16 Assembly Drawings.
Internship final report EDYTA PILORZ (Cracow University of Technology) September – October Supervisors: Jérôme Daguin Philippe Lenoir.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Collaboration diagrams. Deployment diagrams. Lesson 4.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Design and Technology: Resistant Materials Year 7 Art Deco Clock Name: Date:
Welcome! Drafting 2345: Advanced Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Vacuum, Charging and Recovery Sugiyanto, S.T., M.Eng.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ANALYSIS OF FLOW THROUGH BALL VALVE GUIDED BY: V.R.PRAMOD Sr. SCALE LECTURER ME DEPT. PRESENTED BY: RAJEEV THOMAS ROLL NO: 114 S7MB.
14 Refrigerant Recovery, Recycling, and Recharging.
LBNF CAD models, Drawings and Component list
Ti/SS transitions A.Basti INFN-PISA*
ATM 322 – Pneumatics Module 4
Chemical Engineering Drawing
Design and Technology: Resistant Materials Year 7 Art Deco Clock
Overview of Mechanical Design
Flexible lines assembly
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
Update on Junction Box Design
Teleconference ACS – FREIA 20th February 2018
Free Body Diagrams at an Angle
My experience in CATIA V5 and Solid Works modeling.
Stainless Steel Corrugated Braided Hose Metal Expansion Joints
Piping and Instrumentation for Process Industries
Instructions: Adding refrigerant fluid to system
PANDA The conceptual design of the control Dewar
Production process- your product processing cards, technology
UPPSALA UNIVERSITY_GERSEMI PROJECT
CO2 progress and issues on the control systems
SC1R Cold Box PDR Assembly Sequence
CRYOMODULE FINAL ASSEMBLY
CIRCUITS and SYSTEMS – part I
Presentation transcript:

PREZENTACJA WSPÓŁFINANSOWANA PRZEZ UNIĘ EUROPEJSKĄ ZE ŚRODKÓW EUROPEJSKIEGO FUNDUSZ SPOŁECZNEGO W RAMACH PROJEKTU MBM – KIERUNEK ZAMAWIANY

MICHAL SKAKUJ 7/28/2015Michal Skakuj PH/DT Internship final presentation June-July 2015

7/28/2015Michal Skakuj PH/DT During my internship I participated in the 3D design of the test stand for the validation of the 3M NOVEC 649 as future replacement of the C 6 F 14 refrigerant in the ATLAS cooling system. Main tasks: - Measurement of an existing frame and creation of the 3D model in Catia - Design of the 3D model pipeline - 3D modelling of mechanical components - Assembly of the components and the pipeline into the rack - Prepare 2D construction drawings

7/28/2015Michal Skakuj PH/DT Measurement of an existing frame and prepare the 3D model in Catia.

7/28/2015Michal Skakuj PH/DT Next step was introduction to the Process and Instrumentation Diagrams (P&ID) test bench. During my internship we had various version, below is the latest which is being base for 3D model.

7/28/2015Michal Skakuj PH/DT Design of 3D pipeline In the beginning pipeline and components was created as a simple shapes to see how much free space we have. In the course of time the model was improving.

7/28/2015Michal Skakuj PH/DT Part list:

7/28/2015Michal Skakuj PH/DT Based on part list I replaced the simple shapes by 3D models. Some of them was obtained from companies support and some was modeled by me. MECA-INOX PS4 TYPE 3-PIECE BALL VALVE

7/28/2015Michal Skakuj PH/DT Components modeled by me Pressure transmitter DMP 331 Pressure regulating valve with gauge

7/28/2015Michal Skakuj PH/DT Connection list Connection between components and pipeline was very important and time-consuming task. Finally thanks to collaboration with Dina Giakoumi and Piotr Dziurdzia we have created the connection list.

7/28/2015Michal Skakuj PH/DT Examples of connections : Swagelok union tee Swagelok tube fitting Welded connection Straight socket GAZ- NTP thread Tube fitting adapter Flange connection

7/28/2015Michal Skakuj PH/DT Final assembly

7/28/2015Michal Skakuj PH/DT Final assembly Manifold ⌀ 6mm, ⌀ 8mm, ⌀ 10mm

7/28/2015Michal Skakuj PH/DT 2D connection drawing One of the last tasks was creating 2D construction drawings with details to the connections. The 2D assembly drawings that will explain step by step the assembly procedure.

7/28/2015Michal Skakuj PH/DT Still to do : Add support for pipeline and tank. Select few missing components and create connection between them and pipeline.

7/28/2015Michal Skakuj PH/DT THANK YOU FOR YOUR ATTENTION !