Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.

Slides:



Advertisements
Similar presentations
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Advertisements

M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
CALO News Pascal Perret LPC Clermont 26 November 2014.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
Calorimeter Status: Preparing RUN II & LS2 Pascal Perret LPC Clermont 24 February 2015.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
PS/SPD VFE Electronics Boxes Repairs Philippe Jacquet, Pascal Perret, Guy Reinmuth LPC Clermont 23 October 2007.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
V. Bobillier1 Cable installation status.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CALO News Pascal Perret LPC Clermont 23 October 2011.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
CALO News Pascal Perret LPC Clermont 22 January 2012.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Identify the types of maintenance for the examples bellow
Cabling for LHCb Upgrade
COOLING LHC RACKS PROCUREMENT
RICH Status from last RICH meeting
2009: restart the system: few observations. Hw maintenance week:
T1 Electronic status Conclusions Electronics Cards:
LHCb & EYETS
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
VTX readiness for RUN15 Y. Akiba.
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008

2 Wiener Maraton PS  According to Wiener some Maraton are “at risk” of water leakage and have to be sent back to Wiener for repairs: A first list of PS (Feb. 12 th ): 10 concerned CALO (the last ones purchased: HV/LED system, PS/SPD VFE, FE spares). Sent to Wiener into 2 batches: 5 on Feb 21 th : 2 back on March 4 th The last 3 Maraton were back on March 11 th : ”The both ones with broken OVP circuits (channel 0, 1, and 3) have been destroyed by permanent current (from an other channel or power supply) into these very outputs when they were in off state.” A new list from Wiener (March 17 th ): all our Maraton have to be repaired: 29 used for FE crates! Sent to Wiener into 2 batches… 16 on March 20 th (5 1 rst list, 13 2 nd list), back on April 3 rd : A-side (2 not working …) 13 (1 lost!, 4 back from repair beginning of March and checked by Wiener) on April 17 th (2 days delay …): C-side, back April 25 th ? 16/04/2008 Pascal Perret - LPC Clermont

3 Wiener Maraton PS  A lot of work to: remove put back check the settings: Some problems with Vincent’s test bench Thanks to all the people who participate!!!  Commissioning affected (2 weeks?)! 16/04/2008 Pascal Perret - LPC Clermont

4  All our crates are equipped with a turbine for air cooling 16/04/2008 Pascal Perret - LPC Clermont Turbines  The first one broke Mid-December (not yet repaired …)  Since ~2 weeks, 3 are very noisy 1 stopped last Wednesday (April 10 th )  In conjunction metallic powders (brass?) on the crates, cables, boards, …

5 Pascal Perret - LPC Clermont24/01/2008

6 Turbines  Axis and fixation piece: 16/04/2008 Pascal Perret - LPC Clermont Metallic powder inside the turbine

7 Turbines 16/04/2008 Pascal Perret - LPC Clermont

8 Turbines  4 turbines are broken: 2 have the same problems: destruction of the axis (powder) For the 2 other ones, axis ok, problem not yet identified We decided to stop the remaining 2 noisy turbines  We have 3 spares + 1 spare at CERN store  All our turbines could be affected (fabrication problem?)  Problem with the company in charge of turbine fabrication and maintenance (no more contact since weeks) … 16/04/2008 Pascal Perret - LPC Clermont