Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

Electronic Systems Support LV PS Procurement - Status February 28, 2005.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 Cooling Unit.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 19" rack mountable unit has optimized performance density Mounting for.
Shelf Management & IPMI SRS related activities
Topical Workshop on Electronics for Particle Physics Perugia 24/9/2013 Evaluation results of xTCA equipment for HEP experiments at CERN 1 Collaboration.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
First test results with the Gigabit Link Interface Board (GLIB) Paschalis VICHOUDIS CERN PH-ESE-BE on behalf of the GLIB team (M. Barros Marin,
xTCA at CERN an overview based on input from many kind colleagues
1 An Introduction to the Storage Bridge Bay Specification.
WAO 2007 Andrej Košiček Dealing with the Obsolescence in state-of- the-art Electronic Components 27 September 2007.
About Samway Electronic SRL Founded in 2005 in Bucharest, Romania Focused on management and monitoring solutions for telecom/industrial computers Active.
XTCA working group M. Hansen, CERN. xTCA Owned by PICMG (PCI Industrial Computer Manufacturers Group) ATCA (2002, 2007) – Advanced Telecommunications.
March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan.
New crate/bus standards: ATCA, uTCA, AMC, VXS and VPX An overview of the features of the respective standards and feedback from the IEEE/NSS conference.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
Evaluation of ATCA/  TCA M. Haney ILLINOIS UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
The design of HEPS digital BPM electronics BI Group, accelerator division.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
Operations, Test facilities, CF&S Tom Himel SLAC.
ΜTCA for physicists? A project of PH-ESE group to evaluate platforms for uTCA based systems at CERN and in the HEP community M. Joos, CERN on behalf of.
Slide ‹Nr.› l © 2015 CommAgility & N.A.T. GmbH l All trademarks and logos are property of their respective holders CommAgility and N.A.T. CERN/HPC workshop.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
The PH/ESE µTCA evaluation project a (short) status update Markus Joos CERN M. Joos, CERN13rd meeting of the xTCA IG.
XTCA Interest Group meeting Topical Workshop on Electronics for Particle Physics - Perugia 26/9/2013 Summary of evaluation results of xTCA equipment 1.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
ATCA in ATLAS meeting 16/05/2013 Evaluation results of equipment equipment PH-ESE-BE 1 Collaboration (PH/ESE) Vincent Bobillier, Matteo Di Cosmo, Stefan.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Standard electronics for CLIC module. Sébastien Vilalte CTC
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
IPMI: New MMC firmware IN2P3: DAQ working group (19/06/15) 19/06/2015IN2P3: DAQ working group (06/19)1 PH-ESE-BE collaboration Vincent Bobillier, Stefan.
Possible replacement of VME Philippe Farthouat, CERN.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
3 rd xTCA IG meetingVincent Bobillier et al. 1 MMC mezzanine.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
Modular Electronics an overview of modern standards
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
Design of an AdvancedTCA board Management Controller Solution
RT2010 & xTCA workshop a (personal) summary
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
CERN-IPMC Solution for AdvancedTCA Blades
SEVERITY & PRIORITY RELATIONSHIP
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
EDR HLRF Work Packages Draft Summary
New xTCA Developments at SLAC
uTCA A Common Hardware Platform for CMS Trigger Upgrades
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
xTCA interest group meeting
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Presentation transcript:

Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M. JoosThe PH/ESE xTCA Evaluation Project H. MüllerAn ATCA framework for the RD51 SRS electronics R. Je GacOverview on the LHCb ATCA strategy J. P. CachemicheRecent ATCA development for P. FarthouatxTCA in ATLAS N. LetendreIPMC Mezzanine for ATCA boards B. BielawskiBE/CO: uTCA projects R. LarsenOngoing developments at SLAC aimed at RF, BPM and Control systems for upgrades and LCLSII accelerator

The PH/ESE xTCA Evaluation Project Progress report Markus Joos in collaboration with Vincent Bobillier, Stefan Haas, Francois Vasey and Paschalis Vichoudis M. Joos, PH/ESE2

Project definition M. Joos, PH/ESE3 Evaluate µTCA for it suitability as a platform for future modular electronics for HEP experiments Tasks: Technical evaluation of components for µTCA and MTCA.4 systems Development of tools (H/W and S/W) for the testing of commercial components Conduct market surveys Report results to the xTCA IG Build up support for components of common interest Project duration: February 2011 – mid 2012 Discussion of continuation in early 2012

M. Joos, PH/ESE4 Equipment purchased ManufacturerTypeNumber Schroff6-slot MTCA.4 shelf (type: )1 KontronKontron AM4904 MCH (with PCIe GEN2 switch )3 KontronKontron AM5030 processor AMC5 ElmaElma AMC load module (ref.: ; single width full size)6 ESDADIO-24 AMCNot shown on picture Vadatech12 slot µTCA shelf (ref.: VT )2 Vadatech792W power module (ref.: UTC )2 NATMCH (with PCIe GEN2 switch; NAT-MCH-Base12-GbE-SSCH-TCTCXO-PCIEx48). So far only GEN1 switch received 4 Concurrent Technologies AM310 processor module (ordered)

M. Joos, PH/ESE5 Equipment developed MMC mezzanine (based on design from CPPM) MMC test AMC AMC load boardRTM load board Production of 15 boards of each will start very soon Might become a reference design

M. Joos, PH/ESE6 Results For the detailed report see: uTCAEvaluationProject/Shared%20Documents/xTCA%20summary.docxhttps://espace.cern.ch/ph-dep-ESE-BE- uTCAEvaluationProject/Shared%20Documents/xTCA%20summary.docx Many (mostly minor) interoperability problems encountered Components providing the same function (e.g. shelf or MCH) can have very different features and user interfaces (S/W) µTCA seems to be growing rapidly Large choice of shelves, MCHs, processors, FPGA/FMC AMCs Also some digitizers available now MTCA.4 received well by OEMs Many customizations Special signal routing on backplanes Backplanes with integrated MCH functionality Many options (cooling, PSUs, data transfer protocols)

M. Joos, PH/ESE7 Results Crate PSU preliminary tests Regulation and ripple measurements Long term measurements with load variations and temperature monitoring

M. Joos, PH/ESE8 The next phase Complete the tasks of the first phase (MMC S/W, load board H/W and S/W) Continue the market surveys and maintain contacts with (potential) users via e.g. the xTCA IG Continue and expand the project with these objectives: Pay equal attention to µTCA and ATCA Discuss collaboration with LHCb and ATLAS on ATCA evaluation Discuss collaboration with BE/CO and CMS on µTCA evaluation Focus efforts of PH/ESE on infrastructure components Shelves and Power supplies (with focus on electrical and cooling performance) Manufacturers contacted for offers for shelf Continue evaluation of µTCA MCH modules (and processor AMCs) Propose procedures for the acceptance testing of (commercial) xTCA components