WHITE DELI SUB PRODUCTION PROCESS IMPROVEMENT SOLUTION APPROACH May 21 st 2012.

Slides:



Advertisements
Similar presentations
Linking IATI information to recipient budgets. Why? Alignment of donors with government activities Division of labour between all actors Evaluation and.
Advertisements

MPI ABI WG Status Jeff Brown, LANL (chair) April 28, 2008.
Workshop on freight train derailments - Next steps - Emmanuel Ruffin Safety Unit 06 – 05 – st Workshop on freight train derailments N° 1.
PhoenixPro Procurement. technology. contracts. projects.
Tree Diagrams 1. Learning Objectives Upon completing this module, you will be able to:  Understand the purpose and use of a Tree Diagram (TD)  Construct,
1 Job Element Sheet Process: Cheesecake Bake – Mixing Process Author: Andreana Crance, RIT MSD Date/Revision: 1/29/10, Rev 0 Job Element Sheet Process:
Institute of Innovative Design Project LOADER Krasnoyarsk 2001.
IMPROVEMENT PLAN UPDATESPO Richard Latham Bridget Eggers Tyler Brent Valeria Gonzalez.
St Anne’s: Ofsted Summary. Why is St Anne’s in Special Measures?  Achievement is poor. Progress is inconsistent  Some weak teaching observed and over.
Job Element Sheet Process: Cheesecake Bake – Dropper Process Author: Andreana Crance, RIT MSD Date/Revision: 2/5/10, Rev 0 1. Obtain dropper2. Set up dropper.
Operations Management
Joshua Kayiwa INRUD-IAA, Uganda. Session Objectives Narrate the experience of the Uganda INRUD-IAA team in collecting, cleaning, summarizing and analyzing.
Developing a thin ePortfolio for lifelong learning in the eFramework Peter Rees Jones CETIS ePortfolio feasibility study & Centre for International ePortfolio.
Lecture 22 CSE 331 Oct 26, Blog posts Please sign up if you have not If I have a pick a blogger I will only pick ONE/lecture Will lose out on 5%
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
ASSESSMENT OF CATASTROPHE RISK IN INDUSTRY Paul Kleindorfer Technology and Operations Management, INSEAD Ulku Oktem Risk Management and Decision Processes.
Logistics – important part of our live By Maksimova Valentina College № 31.
Define the Problem Gather the Evidence Identify the Causes Evaluate an Existing Policy Develop Solutions Select the Best Solution (Feasibility vs. Effectiveness)
Designing Learning.
© 2012 Common Core, Inc. All rights reserved. commoncore.org NYS COMMON CORE MATHEMATICS CURRICULUM Bridging the Gap Grades 6-9.
Goal Attainment Scaling
1 Project Charter DEFINE. 2 Project Charter DEFINE.
WIGAN’S LEAP PROJECT: ‘Stepping Out’ –Senior Peer Mentor Project Implementation Carol Southern LEAP Co-ordinator, Wigan Leisure & Culture Trust.
Calculation Policy Training for Parents 25 th February 2015.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
B AKER ’ S M ATH Working a Dough Formula in Percent.
st Quarter Results – June 7th, 2012 June 7 th, st Quarter Results for the three months ended April 30 th, 2012.
Recycle Today for A Better Tomorrow Recycle Today for A Better Tomorrow Cut Cost Cut Cost Put Money Back into your Bottom line Put Money Back into your.
IZABELLA K. LENTINO JORGE MARTINS MILENA BODMER presents Joint development feasibility.
E-JOURNALS Impact on document supply Jenny Greene Bangor University May 2009.
Example 1 Dividing a Fraction by a Fraction ÷ a. = • 6
ARMA International Washington, DC Chapter Change Management Seminar Using Change Management to Facilitate Enterprise RIM Implementation.
Undergraduate Curriculum Review Committee Progress Report.
BRIDGET EGGERS, RICHARD LATHAM TYLER BRENT, VALERIA GONZALEZ Frozen Cookies Capacity Increase.
Becoming a trainer – training needs analysis
© 2014 Core Knowledge Foundation. This work is licensed under a Creative Commons Attribution- NonCommercial-ShareAlike 3.0 Unported License.
Arithmetic Sequences In an arithmetic sequence, the difference between consecutive terms is constant. The difference is called the common difference. To.
Multi-company Project Management applied to Manufacturing Improvement
Dr. Susan Mpanga Mukasa 1 st Social Franchising Conference 10th – 11th November 2011, White Sands Hotel, Mombasa ProFam Uganda: Quality Assessment tools.
Parallel and Distributed Simulation Time Parallel Simulation.
Health Information Management Systems Foundation To Improve Programme Performance through Measurable Performance Indicator Outputs “Turning Green” Authors:
HOW WE CREATED A TWO DAYS TRAINING ON THE BASIS OF THE RAP GUIDE AND THE CASE STUDIES Ms. Edit NÉMETH, Hungarian CHU ASTANA 25th of September, 2014.
© BLR ® —Business & Legal Resources 1408 Problem Solving For Employees.
Overview of System or Process Design and Improvement 1.
قياس أثر التدريب أكاديمية العبيكان للمعرفة. تقييم التدريب Training evaluation methodologies Donald Kirkpatrick's Four Levels of Evaluation The Phillips.
2.9 – Weighted Averages.
Mixing our Concrete.
Cornerstone Human Resources and Payroll Project Overview
Weight vs. Speed By: Mckinzie White.
Level 4/5 Booster Lesson 7B Sequences.
رؤية مستقبلية لتطوير كلية الزراعة جامعة الفيوم
تکنیک های فروش. تکنیک های فروش آیا فروش همان بازاریابی است؟ نقطه شروع کانون توجه وسیله نقطه پایان سود آوری با تامین رضایت مشتری آمیزه بازاریابی نیازهای.
دانشگاه شهیدرجایی تهران
Plant and Animal Systems Lesson
التدريب الرياضى إعداد الدكتور طارق صلاح.
تعهدات مشتری در کنوانسیون بیع بین المللی
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Weighbridge Training Course Beijing - September 2017
Бази от данни и СУБД Основни понятия инж. Ангел Ст. Ангелов.
Arithmetic Sequences In an arithmetic sequence, the difference between consecutive terms is constant. The difference is called the common difference. To.
Summer Training Industrial Engineering Department
Facilities Planning and Design Course code:
Assignment Capacity The recorded solution to the first problem is available at
Work Breakdown Structure Tasks and Sub-Tasks
x/÷ Numbers Year 3-4 – Multiply and divide a multiple of 10
VGM – where are we.
ISO 9001:2000 Awareness Training
WHITE DELI SUB PRODUCTION PROCESS IMPROVEMENT
System of Tax Subsidies and Related Case Studies
Limited Resources Concept
Presentation transcript:

WHITE DELI SUB PRODUCTION PROCESS IMPROVEMENT SOLUTION APPROACH May 21 st 2012

BACKGROUND PROS Wonderful Product Good Quality Best Selling Good Production CURRENT OBSERVATION Low DoS (Missing Quality) ! Remix Type and Rate Mixing Pace Breakdowns

SUPPORTING DATA Average Mixing Pace : 14mn30sec vs 11mn37sec (Divider Time) AverageQ DoS 11 vs 14 (Required for best quality) Average remix rate 4.65% 20% over 10% Dough Weight Average Scrap rate 0.95% Average Moline Line Impact 2.00% Average Scaling Time 4mn Average Loading Time 1mn

SOLUTION FLOW Implementing work sequence Process flow plan: work sequence and timing Standard Work Diagram: walking path Job Aid : training and reference

Process Flow Plan Ingredients Scaling Ingredient Loading Auto-Delivery and Mixer Starting Picking up remix Mixing process Unloading Mixer Dividing Time Idle Time

Standard Work Diagram

Job Aid

Snapshot Audit Using Mixer timers as reference Link key process steps to timers reading Read timer to assess pace keeping Get back on pace after every unplanned gap

Remix Policy Providing new Remix buckets (max weight 53lb) Put additional doubles into trash No remix at Divider Weight and record trash at the end of every session

Thanks for your attention