Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®

Slides:



Advertisements
Similar presentations
29 May GNSO Improvements Top Level Plan 29 May 2009 Plan distributed 22 May by Avri.
Advertisements

MTEF BUDGET PROCESS – A TOOL FOR MAINSTREAMING MDGS
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
Coherent Web Sustaining Engineering Plan 1. The Coherent Web team will: Utilize two-week development “sprints” to plan and track implementation activities.
1 The FGDC and NIMA’s National Center for Geospatial Intelligence Standards (NCGIS) Tiger Team Presented by Julie Binder Maitra FGDC Standards Coordinator.
A-16 Supplemental Guidance Document FGDC Annual Report Ken Shaffer FGDC Deputy Staff Director FGDC Coordination Group November.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
Project Management: A Critical Skill for Organizations Presented by Hetty Baiz Project Office Princeton University.
Clinical Information System Implementation Project Prepared for Clinical Affairs Committee December 4, 2002.
Annual Monitoring and Review & Mutual Review Quality Assurance Services.
3G.IP/ R1 3G.IP 2002 Charter. 3G.IP/ R1 2 3G.IP Mission Statement u Actively promote a common IP based wireless system for third generation.
Roles and Responsibilities QMS Infrastructure. All Rights Reserved, Juran Institute, Inc Performance System.v1 1.PPT Learning Objectives 1.Become.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
ISO 9001:2015 Revision overview - General users
DPW BD&C Employee Performance Evaluation Guideline Discussion
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
How To Apply Quality Management
NATIONAL STATISTICAL COORDINATION BOARD 1 COMMENTS ON THE WASHINGTON GROUP GOVERNANCE PROPOSAL BY ROMULO A. VIROLA Secretary General National Statistical.
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
Stage 3 Review: TFEIP/ETC-ACC Karin Kindbom, Martin Adams & Justin Goodwin.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)
Project Management Workshop Overview By Tarek Lahdhiri Region 4 PACE Chair IEEE Region 4 Meeting January 30/31, 2004.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed draft.
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
TSG-S OMA AD-HOC RECOMMENDATIONS TSG-S OMA AdHoc.
The Road to Version 3 27 th October  Created and maintained through a group of DIA (Drug Information Association) volunteers ◦ ~350 contributors.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
Framework on National Water Sector Collaborative Structures Progress on Structure and Establishment of STTs WSLG Meeting – 19 November 2009 (Presented.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
RESEARCH PROGRAMS GETTING OFF ON THE RIGHT FOOT AND STAYING THERE Sue Sillick Montana Department of Transportation July 28, 2010 Methods to Ensure the.
Future Meetings for TSG-S TSG-S Chair Nick Yamasaki (KDDI) 21 July
State of Georgia Release Management Training
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
1 CCSAS Governance An Overview 2007 Annual Child Support Training Conference and Expo September 18, :30 – 12:00.
3GPP2 Restructuring Source: TSG-A Chairman; Xiaowu Zhao TSG-C Chairman; Ed Tiedemann TSG-S Chairman; Nick Yamasaki TSG-X Chairman; Marvin Bienn Copyright.
TSG-S Comments to TSG Chairs Regarding Proposed 3GPP2 Restructure Nick Yamasaki Chair, 3GPP2 TSG-S
1 Source:Bob Plunkett TSG Coordination Ad Hoc Chair Copyright Statement The contributor grants a free, irrevocable license to 3GPP2 and its Organizational.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC D.
Project Planning and Management Gail Campbell and Tom Broadhurst.
1 Contributor: Bob Plunkett QuickSilver Technologies Copyright Statement The contributor grants a free, irrevocable license to 3GPP2 and its Organizational.
Formation of a Market Analysis Subcommittee Charlie Grist and Jennifer Light RTF Policy Advisory Committee February 19, 2016.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B.
Chapter 4 Systems Planning and Selection
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Presentation transcript:

Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®

Page 1 3GPP2-S xxxA Contents Objectives PMT Functions Overview PMT Composition PMT Functions u Work Plan Management u Release Plan Management u Work Item Creation PMT Meeting Scheduling

Page 2 3GPP2-S xxxA Objectives SC/OP Directives ref: S , SC summary ref: S , OP summary ref: S , SC Chair to S Chair u TSG-S assigned to deliver status report for July SC/OP meetings u PMT to stay organized under TSG-S u All TSGs - begin using TSG Coordination Ad-Hoc Report Results –Specifically Section 3 Bold-font items from SC Agree to Framework by Close of this PMT Meeting

Page 3 3GPP2-S xxxA PMT Functions Overview Key elements of program management u Work Plan & Release Plan developed by the Team –PMTeam Member Composition is critical - see next slide u SC is final arbitrator when PMT cannot agree to items within Work Plan or Release Plan PMT meeting schedule that allows full participation –see detailed slide Empowered Program Management function u PMT directs activities based on the approved Work & Release Plans u With PMT cross TSG membership, empowerment is maintained Release Plan is System-wide (E2E) u Release items (features/capabilities) & their interdependencies u Annual (assume ?) release with point releases (?)

Page 4 3GPP2-S xxxA PMT Composition While organized under TSG-S, membership is cross-TSG u PMT Chair u PMT staff support –one or two permanent members –possibly from 3GPP2 Secretariat u General membership from all TSGs –TSG leadership members typically TSG Chair or V-Chair selected WG or SWG chairs –Subject Matter Experts –others PMTeam has stake in success of 3GPP2

Page 5 3GPP2-S xxxA PMT Functions - Work Plan Management PMTeam members have responsibility for assigned TSG Work Plan Items from “the” Work Plan u allows monitoring of stage 1, 2, 3 development & milestones u PMT system allows for early detection of slips or non-compliance u This is not “Big Brother” looking over TSGs but rather TSG members taking an active role in keeping 3GPP2 on track PMT to make maximum use of tools & communications u available to all - common PMT member user experience with the system

Page 6 3GPP2-S xxxA PMT Functions - Release Plan Management Release Plan development in TSG-S by the PMTeam u same basic process as Work Plan development u while the Work Plan is primarily for internal 3GPP2 use, the Release Plan will have external customers

Page 7 3GPP2-S xxxA PMT Functions - Work Item Creation Key words used previously apply for Work Item creation: u The process is “Top Down” because the Work Plan is created by the PMT which has a coordinated, central focus u The process is also “Bottom Up” because the genesis of an individual item will most often come from a specific member of a TSG, MRP, industry- regulatory mandate, or other source Steering Committee TSG-ATSG-CTSG-NTSG-P Work Item Proposals SPECS Work Plan WG1 TSG-S PMT Propose work items (Stage 1)s Release Plan SPECS Work Item Proposals

Page 8 3GPP2-S xxxA PMT Meeting Schedule Key to Successful PMT Function