CENIC/NLR Optical Network Management Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC
Agenda Provide overview of CENIC and NLR Optical Infrastructures Define the tools and procedures CENIC uses to monitor these networks Identify some challenges supporting these large optical networks
CENIC Corporation for Educational Network Initiatives in California Advanced optical network infrastructure servicing California’s colleges, research institutions and K-12 schools Multi-tiered services across a common backbone Cisco 15808/15454 Hybrid Long Haul platforms supporting up to 80 channels Cisco 15540/15454 Metro platforms supporting up to 32 channels
CENIC Optical Backbone
RAT STA CHI DAL SYR TUL PEN ELP KAN PHO National Lambda Rail BAT ALB HOU PIT WDC OGD BOI CLE ATL POR RAL NYC SAA DEN SVL SEA JAC Cisco terminal Cisco OADM Cisco terminal Cisco OADM SLC Level3 fiber WilTel fiber Qwest fiber Other fiber Managed waves LAX SAN Note: California (SAN-LAX-SVL) routes shown are part of CalREN; NLR is adding waves to CalREN systems. 4
Management Platforms Craft Interfaces for individual Network Element provisioning and troubleshooting –CTC - Cisco Transport Controller provisioning/troubleshooting –CWD - Cisco Wavelength Director provisioning/troubleshooting CTM - Cisco Transport Manager –GUI based NMS provides overview of multiple spans in the network. Inventory Management Fault Management Performance Management Configuration Management
Test Equipment OSA - Optical Spectrum Analyzer
Performance Monitoring PM Reports –trend analysis –Continuous, 15 min, 1 hr reports Forward Error Correction - FEC –Validates client’s payload over the DWDM transport
Commissioning Data Reports Run prior to and after maintenances or service interruptions –Provides detailed analysis of optical parameters
Optical Networking Challenges NE monitoring during fiber cuts –Complex routed solutions Hybrid Management systems –Utilize CTM and CTC/CWD to provision and troubleshoot NMS Upgrades to support new hardware Documentation –Keeping provisioning data up to date Deploying test equipment Configuration History –Audit Trail Alarm correlation