March 13, 2006 slide 1 HIAPER Pod Development Group Discussion topics: brief review of where we are: pod group, large pods, NCAR pod, pylons, PMS canisters.

Slides:



Advertisements
Similar presentations
2007 CAH HF Program Group 2 Roadmap Next Steps for Phase II January – March 2007 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Engage Internal Stakeholders Plan/Educate.
Advertisements

Tentative HIAPER Development Plan Critical Infrastructure Dev. (10/1/04 – 4/30/05) Pilot Proficiency (5/1/05 – 5/15/05) Science Systems Flight Checks (5/15/05.
AMS Performance at DC3-Test Some preliminary results Pedro Campuzano Jost, Douglas Day, Michael Lechner, Jose Luis Jimenez.
NETCARE – POLAR Two aircraft campaigns – summer 2014, spring 2015 (spring 2016 in proposal) Close collaboration with Alfred Wegener Institute (Andreas.
Smart Fixed-Wing Aircraft
ICE-T Payload & Performance. Seat Hudson CCN 1 & 2 CVI Prather AMS WCL DMT RAF Chem WCR WCL Seat SID-2 3V-CPI DMT Shuttle RAF Aerosol Seat Hudson 3 Seat.
Technology Advisory Committee (TAC) Charge Familiarize itself with strategic plans and emerging technologies. Evaluate issues and opportunities associated.
Page 1© Crown copyright The Facility for Airborne Atmospheric Measurements (FAAM) BAe-146 Steve Abel First VOCALS Regional Experiment (REx) Preparatory.
General: Very likely both aircraft are to be based at Arica. The UK recce is early April, both Arica and Iquique will be visited. Total of 120 flight hours.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
BIG Process Flow Annexure A1. Call for Proposals Opens Call for Proposals Closes BIG Partners assigned proposals to review Preliminary screening by BIG.
Gravity Waves – #1 The NSF/NCAR G-V Research Aircraft: A New Observing Platform for Environmental Research.
C-130 Flight Plan Refinement Cross-section –lose MASTER? return leg at 3 km? –length of outbound legs? number of levels? POC-drift/lagrangian –fewer levels.
NCAR Research Aviation Facility CSU visit 11-April-2007 Dave Rogers -
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Robert Wood, University of Washington many contributors VOCALS-REx Facility Status – NSF C-130.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Photo courtesy Carly Calvin, NCAR NSF C-130 Platform Report Robert Wood (a) 20 o S Cross-Sections [4 full missions+5 partial missions] - to characterize.
EUFAR Mid Term Review Toulouse, 8 June 2007 EUFAR FP6 Introduction Dave Kindred (The Met Office UK)
BAE 146 Aircraft RICO Schedule RICO Participating Scientists RICO Instrumentation Contact: Alan Blyth
1 Measuring the flow boundary layer on HIAPER's fuselage Rogers, Fox, Lord, Stith, Maclean, EOL technical staff, Friehe, McClusky goal: measure air speed.
EUFAR Joint Research Activity Airborne Aerosol Reference Pod (AARP) enviscope GmbH, JRA_envi_status_ H. Coe, J.-L. Brenguier, J. Curtius, R. Dupuy,
Al Cooper Jeff Stith Earth Observing Laboratory (EOL) HIAPER Debrief 9 November 2005 Ongoing Development and Support: EOL Plans for Deployment of HIAPER.
Page 1© Crown copyright 2004 Cirrus Measurements during the EAQUATE Campaign C. Lee, A.J. Baran, P.N. Francis, M.D. Glew, S.M. Newman and J.P. Taylor.
Introduction to EUFAR EUropean Fleet for Airborne Research
GV Sites in Canada David Hudak Paul Joe Environment Environnement Canada 2nd International GPM Ground Validation Workshop, September, Taipei, Taiwan.
NCAR/RAF Aerosol and Cloud Particle Instrumentation for DYCOMS-II Investigator meeting 15-Feb-2001 Jeffco.
ICE-T Project Schedule 1 April 2011 – NSF Decision Deadline* 1 April 2011 – Documentation Due at RAF (rack layouts, power, data) 1 May 2011 – Start of.
Comparison of Arithmetic Mean Stage vs. Weighted Mean Stage in Refuge Compliance Calculations Cheol Mo, PhD Lead Environmental Scientist South Florida.
Flight schedule and staff limitations Hardpoint allocation and cabin layout Time synchronization Flight issues – expectation around convection Sensor groups.
A Strategic Initiative for UT/LS Research at NCAR L. Pan, S. Schauffler, M. Barth, T. Campos, A. Heymsfield, A. Lambert, D. Lenschow, W. Randel, P. Rasch.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 MICROPHYSICS AND OPTICS IN TRADE-WIND CUMULUS Hermann E. Gerber Gerber Scientific, Reston, VA RICO Planning Meeting; Feb.,
VOCALS NSF C-130 Data Assessment Report. Resources Project Documentation: (RAF – Field Projects) Project Documentation:
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
minstrelinhibernation.blogspot.com community.sparknotes.com yamber.deviantart.com
John M. Hubbe DOE ASP G-1 DOE has two climate-motivated programs John M. Hubbe
Jeff Stith, Andrew Gettelman NCAR is sponsored by the National Science Foundation Southern Ocean Studies: NCAR Measurement capabilities and integrating.
King Air Deployment in RICO Larry Oolman University of Wyoming.
PRINCIPLE OF OPERATION
C-130 Payload Issues Proposed instruments What can be sampled where (below/above cloud)
Draft for discussion1 OSLC PLM roadmap discussion Aug 30 th 2011 Rainer Ersch Gray Bachelor V0.4 updated at meeting Aug 30th.
© Crown copyright Met Office Cloud observations at Cardington Simon Osborne (OBR, Cardington) OBR Conference, 11 th -13 th December 2012.
HIAPER in PACDEX (Apr-May 2007). START08 RAF wing pod instruments.
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
GAP Measurements and Instrumentation
Key Value Indicators (KVIs) ‘Accepted’ Version 1.0
Change Network Timeline
Integration, Test, and Calibration
Wyoming King Air in RICO
RICO Schedule RICO Participating Scientists RICO Instrumentation
Intro – RAF software OUTLINE: Real-time data - on aircraft or ground
NSF C-130 Platform Report MISSIONS INSTRUMENTS Robert Wood
DOE G-1 Research Aircraft Facility Instrument Summary
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
9 April 2018 Phil Brown, Met Office, UK
DSC ChMC CSS Consequential Update 13th March 2019
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
Imaging & Engineering STAP Meeting 12th-13th of April 2018
1.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Status of P3DWL for T-PARC and TSC-08
Potential Minor Release Drop 4 Timeline & Scope
Budget Planning Calendar
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
RICO Schedule RICO Participating Scientists RICO Instrumentation
LCLS Instrument MIE Project: Staffing, Schedule
Presentation transcript:

March 13, 2006 slide 1 HIAPER Pod Development Group Discussion topics: brief review of where we are: pod group, large pods, NCAR pod, pylons, PMS canisters GAC flow study - status (typical wing stores) RAF flow studies – status & plans gap & HAIS pod instruments (what/when) collaborations (EUFAR, DLR, UK) next steps (tasks, staffing, schedule) other ______________?

March 13, 2006 slide 2 review of where we are pod group Sep ’03 met with EUFAR to discuss collaboration; planned to submit NSF proposal for HIAPERSep ’03 met with EUFAR to discuss collaboration; planned to submit NSF proposal for HIAPER July ’04 pod group created & scope definedJuly ’04 pod group created & scope defined Feb ’05 pod plan document releasedFeb ’05 pod plan document released large pods - NGCP & NRL400 Dec ’03 GAC flow study :Dec ’03 GAC flow study : “Results show that the impact is large, with significant flow interference, drag and potential for buffeting and vibration.”

March 13, 2006 slide 3 review of where we are NCAR pod GAC flow study  favorableGAC flow study  favorable PMS canisters will be first pods on G5will be first pods on G5pylons video cameravideo camera laser velocimeterlaser velocimeter -single beam in PMS canister initially -next version multi-beam in pylon or ? PMS canisters two per pylonPMS canisters two per pylon SPEC 2D-S/CPISPEC 2D-S/CPI NCAR 20” podNCAR 20” pod EUFAR reference pod ?EUFAR reference pod ?

March 13, 2006 slide 4 GAC flow study - status (typical wing stores) -

March 13, 2006 slide 5 gap & HAIS pod instruments UHSAS PMS can gap2006-May PMS 2D-c; FSSP “gap2006-Aug all wx turb flux “gap2006-Oct SID-2“HAIS2006-Oct laser velocimeter “gap? MTP PMS can HAIS2007-March 2D-S/CPICustomHAIS2007-Dec dropsondes 20” pod ?? all wx radar 20” pod HAIS2008-June

March 13, 2006 slide 6 “reference pod” Enviscope, ” dia, 115” long, 250 # load15” dia, 115” long, 250 # load collaborations – EUFAR -Jean-Louis Brenguier, Hugh Coe, Rolf Maser-

March 13, 2006 slide 7 1M €; design end Apr-2005; completion Oct-20081M €; design end Apr-2005; completion Oct-2008 Flow modeling IFT & Meteo FranceFlow modeling IFT & Meteo France pod #1.pod #1. X-probe on nose; 4 cm i.d. concentric isokinetic inlet feeds optical particle counter + CN + other aerosol instrument, venturi + pump,.. pod #2.pod #2. integrated optical measurements such as nephelometer, aethelometer, DMT SP-2 soot instrument, Gerber open-path neph,.. EUFAR wants partners & share engineering costsEUFAR wants partners & share engineering costs collaborations – EUFAR -Jean-Louis Brenguier, Hugh Coe, Rolf Maser-

March 13, 2006 slide 8 collaborations - DLR HALO DLR  new G-550DLR  new G-550 possible avenue of collaboration:possible avenue of collaboration: NCAR under-wing mount for PMS canisters UCAR-DLR non-disclosure agreement signed April 26, 2005non-disclosure agreement signed April 26, 2005

March 13, 2006 slide 9 collaborations ? - UK BAe (link)

March 13, 2006 slide 10 UK BAe tufting - reverse flow Flow

March 13, 2006 slide 11 next steps set priorities design & build wing pylon & PMS canister mount pod-related work: all-weather flux pod: gust probe, temp, water vapor, LWC laser velocimeter: pylon or PMS canister ? staffingscheduledocumentationcertification flight testing

March 13, 2006 slide 12 update staff estimates (Feb. 17, 2005) Staff months Wing Pylon PMS Canister Mount 20” NCAR pod Special Use Pods Aeronautical Engr Electrical Engr Software Engr Technician Aircraft Mechanic Project Mgr Scientist DFS-Design DFS-Machinist Materials & Services $20k materials $50k CFD services; $50k materials $10k materials