THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.

Slides:



Advertisements
Similar presentations
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Advertisements

Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Company History  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦ 72 Hour.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
ITAR Restricted Data THEMIS Power Subsystem CDR Peer Review 6/14/04 Probe and Probe Carrier Harness Dave Manges (301)
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Reliability Applied to KM3NET
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 1 GLAST Large Area Telescope: Performance & Safety Assurance WBS: 4.1.A.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
FIELDS Mission Assurance Manager University of California, Berkeley
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
THEMIS Mission Assurance
FIELDS SCM Thermal iPER
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
University of California - Berkeley
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
Instrument PDR Summary of Objectives
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California – Berkeley (510)

THEMIS Instrument PDRMission Assurance- 2 UCB, October 15-16, 2003 Status of PAIP UCB At GSFC for approval TUBS (FGM) At GSFC for approval CETP (SCM) At GSFC for approval SWALES (Probe) At GSFC for approval

THEMIS Instrument PDRMission Assurance- 3 UCB, October 15-16, 2003 QA Requirements and Documentation Performance Assurance Implementation Plan (PAIP) THM_pa_001A.doc Version A-2003-Sept 30

THEMIS Instrument PDRMission Assurance- 4 UCB, October 15-16, 2003 Responsibilities of Mission Assurance Flow-Down of PA Requirements FGM / TUBS SCM / CETP Probe / Swales Use of Previously Flown Hardware Will be subject to PA requirements Comply with EWR127-1 requirements for safety Establish and support spacecraft system safety plan Perform Preliminary Hazard Analysis (PHA) Maintain hazard control verification log Develop safety noncompliance reports as required

THEMIS Instrument PDRMission Assurance- 5 UCB, October 15-16, 2003 Responsibilities of Mission Assurance EEE Parts Requirements GSFC-311-INST-001 Parts Derating Radiation tolerance Alerts Parts age control Parts Control board Materials and Processes Controls Hazardous materials requirements Vacuum outgassing requirements Materials lists Alerts

THEMIS Instrument PDRMission Assurance- 6 UCB, October 15-16, 2003 Responsibilities of Mission Assurance Procurement and Subcontractor Controls Receiving Inspection Clean Room Controls Manufacturing and ESD Controls Calibration Controls Personnel Training and Certification to NASA Standards

THEMIS Instrument PDRMission Assurance- 7 UCB, October 15-16, 2003 Manufacturing, Assembly, and Quality Control of Electronic System will be in compliance to the following NASA technical standards: NASA-STD Workmanship Standards for Staking and Conformal Coating of Printed Wiring Boards and Electronic Assemblies NASA-STD Workmanship Standard for Surface Mount Technology NASA-STD Soldered Electrical Connections NASA-STD Crimping, Interconnecting Cables, Harness, and Wiring NASA-STD Electrostatic Discharge Control

THEMIS Instrument PDRMission Assurance- 8 UCB, October 15-16, 2003 In-process Inspection and Test Monitoring During Manufacturing Integration and Testing Readiness Review / Test Witness Verification and Environmental Test Review Final Acceptance Data Package Problem Failure Reporting and Review Configuration Management and Data Control Internal and External Auditing Support Test Readiness Reviews and Pre-Ship Reviews Contamination Control Plan Software Assurance Plan

THEMIS Instrument PDRMission Assurance- 9 UCB, October 15-16, 2003 Supplier Audit Status CETPC SwalesP University of ColoradoP ICS Radiation TechP Valley CircuitsA Speedy CircuitsA Wyle LabsA CorwilA MaxwellA ECR LabsA Golden Altos Inc.A UTMCA Sierra CircuitsA Rigiflex TechA TUBSC Notes: Approved = A Pending = P Conditional = C