Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?

Slides:



Advertisements
Similar presentations
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Advertisements

Total Suspended Solids (TSS) Reduction Presenter: Keith Noble, Saginaw Bay District Office.
Major Sources of Nonpoint Source (NPS) Pollution and Best Management Practices (BMPs) By: David Wojnowski, Stream Watch/Project WET Coordinator Stream.
Katie Rousseau Clean Water Program American Rivers.
Low Impact Development They took all the trees and put them in a tree museum and they charged all the people a dollar and a half just to see 'em. Don't.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
December 3, 2012 Laurel Woodworth Center for Watershed Protection.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
Seattle Stormwater Runoff Remediation by Jimmy Mounivong.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Stormwater Management
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Storm Water Management and Erosion/Sediment Control Storm water management reduces quantity, and improves quality, of runoff in the watershed Site based.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Why and How; What’s Working and What Isn’t.  How Low Impact Development can mitigate effects of urban drainage  Applying design criteria for bioretention.
Lecture ERS 482/682 (Fall 2002) Urbanization ERS 482/682 Small Watershed Hydrology.
Western Washington Hydrology Model Version 3
LCRA Highland Lakes Watershed Ordinance
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
Sustainable Development: Practical Solutions to Real World Problems Fishkill, NY November 7, 2012 Low Impact Development and Rainwater Harvesting Solutions.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
Jason R. Vogel, Ph.D., P.E. Stormwater Specialist Biosystem and Agricultural Engineering Oklahoma State University.
Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Vegetated Filters Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
CHAPEL HILL HIGH SCHOOL ISLAND PROJECT Water: The Essential Ingredient & Thoughts for Sustainability ©Town of Chapel Hill Stormwater Management Division.
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Houston Land/Water Sustainability Forum David W. Peters, P.E., CFM, D.WRE February 6, 2008.
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Sizing Stormwater Control Facilities to Address Stream-Bank Erosion Control Anthony M. Dubin, PE Brown and Caldwell Anthony M. Dubin,
Stormwater and GIS Eastern Panhandle WV GIS User Group Meeting September 2, 2015 Jennifer Klages - Sebastian Donner -
Hydromodification Compliance in the Bay Area
Storm Water Runoff Storm Water Runoff
Green Infrastructure at the Campus and Watershed Scale at the University of North Carolina at Chapel Hill Carolyn Elfland, UNC Chapel Hill Sharon Myers,
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
A New Approach to Protecting Water Quality in Gallatin County through Better Site Design Tammy Crone, Water Quality Specialist.
Land Use. How We Use Land Urbanization of areas is becoming a problem. Thousands of acres of open space just in Pennsylvania have been lost to development.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Hydrosphere Notes Part 9-Land Use. What is land use? The way people use land.
Human Impacts Part 2- Watersheds. What’s a Watershed? An area of land that drains into a common body of water.
Modeling an Urban Development with MIKE-SWMM Presented by: Melissa Figurski.
Huntersville’s LID Ordinance
Hydrosphere Notes Part 9-Land Use.
L-THIA Online and LID in a watershed investigation
L-THIA Online and LID Larry Theller
Source: US EPA National Stormwater Calculator Release
by John Anderson, Martin Bermudez, and Megan Jordan
Northern California LID Hydrology and Hydraulics
Kickoff example Create a new file
What we have developed is…
Stormwater Best Management Practices
Presentation transcript:

Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?

Town Limits = 38.9 square miles ETJ = 22 square miles Total Area = 60.9 sqaure miles Huntersville Jurisdiction Effective February 2003 Stream Miles = 40 Impaired Stream Miles = 63%

Increased Development Results in Declining Water Quality Conditions

Storm Water Runoff Pollutants Bacteria Sediment Heavy Metals Pesticides Fertilizers Petroleum Products

Channel erosion due to storm water runoff volumes and rates.

McDowell Creek, Huntersville Mountain Island Lake

McDowell Creek Water Quality Model Developed by Tetra Tech, Inc. – Private consulting firm Objectives of the Modeling Effort: Quantify the negative impacts Identify causes Predict future impacts Develop solutions

Total Nitrogen ExistingFuture Total Phosphorus ExistingFuture Bank Full Conditions ExistingFuture Modeling Results

The conventional methods alone do not work effectively.

To establish storm water management requirements and controls to prevent surface water degradation by controlling discharges of pollutants as well as runoff volumes and rates. Goal Established by Elected Officials

Performance Criteria: 6 Basic Elements Need to be addressed: 1.85% TSS removal. 2.Using LID treat the runoff from the first 1 inch of rainfall. 3.Use LID in combination with conventional practices to treat the difference in runoff from pre versus post conditions for the 2 year 24 hour storm. 4.Any temporary water quality storage pools must drawdown in 48 to 120 hours. 5.Peak storm water runoff rates shall be controlled for development above 12% impervious 6.No one BMP shall receive runoff from an area greater than 5 acres.

Rain Gardens Dry Ponds Wet Ponds Grassed Swales LID Conventional Use a combination of conventional and Low Impact Development (LID) techniques to mimic, to the extent practicable, the natural hydrology of a site by: infiltrating, storing, retaining, and detaining storm water.

BMPs for Use in Huntersville (Tables 6.1 and 6.2, Pages 48 and 49) BMPApplicable Zoning Districts(1) Applicable Performance Criteria (2) Design Function(3) Function(4) (WQ, VC, PC) Strategic Clearing & GradingU, T, R3(a) WQ, VC, PC Reduce Impervious SurfacesU, T, R3(a) WQ, VC, PC Bioretention (Rain Garden)U, T, R3(a), 3(b)Section 4.0WQ, VC, PC Infiltration TrenchU, T, R3(a), 3(b)Section 8.0WQ, VC, PC Infiltration SwaleU, T, R3(a), 3(b)Section 8.0WQ, VC, PC SwalesU, T, R3(a)Section 5.0WQ, VC Swales with Outlet ControlT, R3(a), 3(a)Section 5.0WQ, VC, PC Vegetative Filter Strips & BuffersU, T, R3(a)Section 7.0WQ, PC Dry Well, Cistern & RainbarrelU, T, R3(b) WQ, VC, PC Porous PavingU, T, R3(b) WQ, VC Curb & Gutter EliminationR3(b) WQ, PC Rooftop StorageU, T, R3(b) VC, PC Wet PondU, T, R3(b), 3(d)Section 1.0WQ, VC, PC Extended Dry PondT, R3(b), 3(d)Section 6.0VC, PC Storm Water WetlandsT, R3(b)Section 2.0WQ, VC, PC Sand FilterT, R3(a)Section 3.0WQ, VC, PC (1) Applicable Zoning Districts: These are the Zoning Districts where the BMP can be used including U = Urban; T = Transitional; R = Rural. (2) Applicable Performance Criteria: These are the Performance Criteria Section numbers (see Section 3) that the BMP can be used to satisfy. (3) Design Function: All BMP designs are contained in the N.C. Department of Environment & Natural Resources, Storm Water Best Management Pratices, April 1999 (4) Functions: These are the dominate functions that the BMPs perform including WQ = Water Quality; VC = Volume Control, PC = Peak Control.

Site Data Sheet

BMPs

Model Output – Pollutant Loading

Davidson Goose, Duck & Stevens Creek Watersheds in Mint Hill Other Areas of Mecklenburg County where LID is being Considered

?