D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.

Slides:



Advertisements
Similar presentations
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Collaboration Mtg Cotober 11, 2000 Installation Status Opening Remarks Overview, logistics Recent events, status Outlook, concerns Conclusions Jon Kotcher.
P. Shanahan June 13, Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.
Tracker Summary Alan Bross MICE CM October 10, 2007.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Status of NA62 straw electronics Webs Covers Services Readout.
Fermilab PMG Jan 20, 2000 Reconsideration of the Installation at D0  Overview  Major constraints  Basics of old, new schemes  Some details on each.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
DoE Review June 6-7, 2000 Installation and Commissioning of the D0 Detector Overview since last review Organization Current status Installation sequence,
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Technical Design for the Mu3e Detector
Calice Tile-HCal and Tail-catcher/Muon Tracker
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications - Cooper  Fallback Options & Installation - Kotcher

D0 PMG 2/3/00 Completed Reportable Milestones  3 early  3 on schedule (  |.2w|)  7 late MilestoneBaselineNewVariance H half wedge fab 20% complete10/15 0w 3 chip ladder fab 80% done10/2010/260.6w Arrival of C-layer MDT modules at FNAL10/2211/31.7w 9 chip ladder fab 20% complete11/311/40.2w M3-Fiber Tracker ribbon fab 50% complete11/1211/5-0.9w First silicon readout crat installed & working 12/211/16-2w Calorimeter SCA testing complete12/1511/23-2.8w MDT ADB Fabrication complete12/2 0w SLIC’s received11/1012/104w Si F wedge assemblies 20% complete1/191/240.4w 6 chip ladder fab 20% complete1/31/313.9w Muon MDC fab complete12/131/315w M2 Muon electronics preprod inst complete12/131/315w

D0 PMG 2/3/00 Near Term Reportable Milestones MilestoneBase line NewVar.SlackSince 1/20 Comments M2 – Fiber tracker assembly begun 12/62/16.2w~1w0wLikely to be 1w later M3 1 st FPS detecor complete 1/122/104.2wlarge0wRecover later Muon FEB, CB prod complete 1/32/146w~2w0w M3-Establish single crate data movement 1/62/176wlarge0wNon-critical FPS mod. Fab & testing complete 12/102/259wlarge0wNon-critical M3 – Fiber tracker cyl. 8,7,6,5 compl. 1/283/25w~1wOr 6w slack if it slips M3 – ICD tile modules ready 1/183/36.6wlargeCoupled to FPS install Preprod. Muon Electr (MTCx MTFB, MTCM) 1/243/66w12w6wCompleted 4 of 5 boards, remaining not critical M3 – 2 nd FPS detector complete 3/83/7-.2wlargeNon-critical Multichip module received 2/233/82w12wLikely more delay M3 – L0 south installed 2/93/94.2wlargeCoupled to FPS install M2 – ICD modules arr. at FNAL 1/253/106.6wlargeCoupled to FPS install

D0 PMG 2/3/00 Status Overview since last PMG  Silicon sensors u Axial (3 chip) s No problems u 90deg (6 chip) s Micron delivery an issue (sputterer problem at Micron, being fixed) s Micron delivery paces s Fallback – accept lower grade detectors u 2deg (9chip) s Production going well (last batch 19/25 passed) s Full delivery in April u F wedges s Proceeding well at 50-60% yield at Micron (last batch 5/6 passed) s Received 5/75 sensors from Eurisys u H wedges s 60 more on order

D0 PMG 2/3/00 Silicon  HDI u Getting sufficient HDI’s to keep pace with production is a problem s Expediting additional HDI orders s 2 nd vendor for bonding, Silitronics, looking good u H wedge s 2 HDI left, as expected s Production stops for 4 wks u 2deg (9chip) s Out of HDI’s, rounding up what is available 5-9 u F wedge s Almost out of HDI’s

D0 PMG 2/3/00 Silicon  Ladder & Wedge production u Axial (3 chip) s Picking up next week u 2deg (9chip) s Production lagging, out of HDI’s u 90deg (6chip) s Paced by Micron delivery u F wedges s Limited by HDI availability u H wedges s Limited by HDI availability

D0 PMG 2/3/00 Production Status

D0 PMG 2/3/00 Fiber Status  Fibers u Waveguide production going well s 175 bundles pulled & cut u Cylinders 8, 7 complete u Nesting cart is being measured; delays by about 4 weeks s 8a and 7a installed and glued s Final stiffness tests in progress s Start assembly next week, 2/7 u Flex circuits still a concern, delaying complete start of VLPC cassette production s Compunetics 100pc order nearly complete – 34 good, 31 to go s 1 st production cassette under test s Many components done while awaiting flex circuits (~20%)

D0 PMG 2/3/00 Fiber Tracker Status  Ribbon Production u Continues

D0 PMG 2/3/00 Fiber Tracker Status  Ribbon Mounting u Continues s C8 and C7 Done s C6 axial started

D0 PMG 2/3/00 Status Overview  Preshowers u Some schedule re-arrangement, net speedup  Tracking Electronics u Some (2-4wks) slippage in layout and vendor production, worry here…….  Calorimeter Electronics u 98% of preamps (59kch) in hand u Power supplies complete u 80% of packaged SCA’s in hand, will need to order 5k more u Small layout problems cause 6 week delay to BLS schedule u Installed 2 power supplies & 16 card of preamps in detector with online controls for p.s.

D0 PMG 2/3/00 Status Overview  ICD u Module testing underway u Preamps in hand, motherboard ordered  Central Muons u Commissioning continues u First ½ truss in D0 Hall  Forward Muons u Trig Pixels: Proceeding well on schedule. u See no problems meeting April completion date u completed. Being shipped in heated container. u Production on A MDTs layer has started u C MDT parts presently most critical items (panels, etc)

D0 PMG 2/3/00 EMC north truss, being taken apart for transport to D0. January 31, 2000

D0 PMG 2/3/00 Trigger pixels The forward muon trigger planes: 3 planes: A, B, C with 16 octants ( north & south) each All pixel counters are at FNAL Layers A & C are completed Layer B started

D0 PMG 2/3/00 MDT chambers & octant assembly The tracking planes: MDT production at Dubna complete ( shipping) A layer assembly done

D0 PMG 2/3/00 Status Overview  Trigger & DAQ u Proceeding well u Delays in some in 12MCM boards ( stereo CFT, CPS, FPS), because of engineering  Online u Manpower in good shape u No schedule concerns, not on critical path u Being tapped for manpower in other systems

D0 PMG 2/3/00 Summary  Concerns u HDI deliveries u Silicon testing u Fiber flex circuits for VLPCs u Forward muon installation u M&S cost contingency continues to dwindle  On the horizon u Lehman review…….