NENG-Combined Cycle, New Unit Hierarchy, and Growth Rates.

Slides:



Advertisements
Similar presentations
Graphing Review Booklet. Graph #1 1. What are the major differences between the lines? The blue line grows a lot more than the red. The blue line is curved,
Advertisements

Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
ERTAC EGU MACE/MACW Case Study December 10, 2012 DRAFT - DO NOT DISTRIBUTE1.
P. 102, Analyzing Data #1, 2, 3.
ERTAC EGU Growth Model Executive Summary September
Draft-Version #17 12/20/10 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
Draft-Version #19 5/15/13 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD Hourly.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Supply and Demand The Supply Curve
B KK/2 Catch rate Constant Quota fishing at levels approaching the MSY shortens the biomass range the population will recover, and the likelihood of entering.
Of Microeconomics 3. The Production Possibilities Frontier and Gains From Trade* Akos Lada July 22nd 2014 * Slide content principally sourced from N.
LEDC NOMADIC FERTILITY RATE POPULATION GROWTH DEATH RATE
Deliver Multimedia Streams with Flexible QoS via a Multicast DAG Yu Cai 02/26/2004.
ANALYZING YOUR ELECTRIC BILL Bob Walker Met-Ed November 7, 2007.
99th Percentile 1st Percentile 50th Percentile What Do Percentiles Mean? Percentiles express the percentage of students that fall below a certain score.
LAST SECTION OF CHAPTER 12 AND OF THE ENTIRE ELECTRICITY UNIT Reducing Our Electrical Energy Consumption.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
ERTAC EGU Growth Code “Proof of Concept” USEPA Briefing Washington, DC December,
Status of ERTAC EGU Growth Committee September 16 th 2013.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ERTAC 1DRAFT - DO NOT DISTRIBUTE. Presentation Overview 1.Process Overview and Timelines 2.Inputs 3.Algorithm Details 4.Results 5.Outstanding issues 2DRAFT.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Load Data for Vermont Docket 7081 workshop 9/30/05.
ERTAC EGU Growth Tool Stakeholder Rollout Lake Michigan Air Directors(LADCO) Rosemont, IL May 20 th,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
DORIS MCLEOD AIR QUALITY PLANNER VIRGINIA DEQ 804/ ERTAC Tool Logic and Flowcharts.
ERTAC 1. P RESENTATION O VERVIEW 1. Process Overview and Timelines 2. Inputs 3. Algorithm Details 4. Results 5. Outstanding issues 2.
WCOAEE Meeting: Natural Gas & Electric Update April 16, 2015.
Developing PHEV Charging Load Profile Based on Transportation Data Analyses Developing PHEV Charging Load Profile (PCLP) PHEV : P lug in H ybrid E lectric.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
1 Public Power Looking to Participate in New Coal Generation Public power communities are very concerned about affordable electricity and –Coal is the.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
6 | Consumer Choices • Consumption Choices
Monterey Plaza Hotel October 8-10, 2007
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Terms & Definitions.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
Draft-Version #18 9/13/11 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
EGU Forecasting Tool (Data Elements) Office of Air Quality (800) John Welch Senior Environmental Manager IDEM.
5-Number Summary A 5-Number Summary is composed of the minimum, the lower quartile (Q1), the median (Q2), the upper quartile (Q3), and the maximum. These.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Competency 37 Demonstrate knowledge that many factors affect income Do Now: Average NFL player’s salary - $1.9 million E1 US soldier salary - $18,378 1.
The Working Theory of an RC Coupled Amplifier in Electronics.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Balance of Year Auction Frequently Asked Questions
Contents Introduction Focus area Wind scenarios
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Go Fish!.
2018 VELCO IRP Forecast Preliminary results
ISO-NE Load Forecast Methodology
How to Write a Hypothesis
Study Results Common Case Study
Massachusetts Electric Restructuring Roundtable
Draft 2013 Energy-Efficiency Forecast
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Sound Important words: vibrate pitch (high or low) ...objects vibrate
ISO-NE Load Forecast Methodology
Study Results Common Case Study
Honors Statistics Review Chapters 4 - 5
DDS Presentation to CT Nonprofits January 21, 2010 Why are we moving to Utilization Payments? Connecticut continues to have economic issues that started.
Why are we moving to Utilization Payments?
DDS Presentation to CT Nonprofits (revised February 3, 2010) Why are we moving to Utilization Payments? Connecticut continues to have economic issues.
Presentation transcript:

NENG-Combined Cycle, New Unit Hierarchy, and Growth Rates

Background on NENG-Combined Cycle Units in CT, MA, ME, NH and RI About 53 existing units – Sizes range from 40 MW to 330 MW – Total capacity = 10,505 MW Existing unit UF’s range from to 0.67, most in upper portion of range No retirements Three new state-supplied units, total capacity about 700 MW One generic unit of 500 MW 2

More Background Hourly hierarchy = 6 hour block Hour 19 of 8/27/2007 had max generation, so the first 6 hours in the hierarchy are > Hierarchy Value Hour and Date #1Hr 18, 8/27/07 #2Hr 19, 8/27/07 #3Hr 20, 8/27/07 #4Hr 21, 8/27/07 #5Hr 22, 8/27/07 #6Hr 23, 8/27/07 Also: Peak growth rate = 1.36 Annual growth rate = 0.72 (?) Transition Hours are 10 and 50 NonPeak growth rate = Note large difference between Peak and Annual GR!

Overall BY & FY Activity 4

July-August Detail of BY&FY Activity 5

Trial Changes Version # New Unit Hierarchy Percentile New Unit Hierarchy Placement Mimic Unit #195 th (default)Position #455661, #1 #275 th Position # , BE1 #340 th Position #343236, 10 New Unit Hierarchy Percentile determines where in the unit hierarchy new units are inserted The placement determines which unit is the combined cycle mimic unit Units higher in the hierarchy receive excess generation before units lower in the hierarchy. 6

What Happens to Mimic Units? Every hour, the new units are loaded with generation first. – Amount provided is scaled to the amount generated by the mimic unit in the base year – Other existing units operating that hour in the base year may be curtailed or turned off, if the hour’s growth rate is low enough. Annually, the mimic unit’s total generation is the most affected due to new unit loading 7

Effects of New Unit Loading on Mimic Units ORISUnit ID Base Year Utilization Fraction Future Year Utilization Fraction V1V2V BE In Version 1, each new unit was initially loaded at a UF of 0.62; V2 of 0.53; V3 of Existing units that start with a higher utilization fraction continue to have a higher utilization fraction in the FY as compared to other existing units. Being the mimic unit tends to depress the annual FY UF, as compared to trials where the existing unit is NOT the mimic unit 8

Comparing Changes to the HSGR and the AFYGR HSGR=Hour specific growth rate – Not dependent on retirements and new units – If the universe of units for BY and FY were identical, HSGR would equal AFYGR AFYGR=Adjusted future year growth rate – Changes hourly depending on retired unit generation, new unit generation, base year generation, and HSGR – In any hour, for NENG-combined cycle, the more the new units operate, the bigger the difference between HSGR and AFYGR = (HSGR*base year generation-total new unit generation)/(base year generation – retired base year generation) 9

V1 Graph of HSGR versus AFYGR 10 1 st 6,000 hrs, mimic heavily utilized in BY, so large difference between HSGR and AFYGR. Last 2,000 hrs, mimic unit was off, so no loading to new units. HSGR=AFYGR

V2 Graph of HSGR versus AFYGR 11 Hrs when mimic unit made up most or all of BY power. New units operate in the FY, but existing units turned off (AFYGR=0)

V3 Graph of HSGR versus AFYGR 12 Much less difference in AFYGR and HSGR due to change in mimic unit. Note in some instances peak rates are reduced less- existing units will be operating more on peak hours.

Food for Thought Where to set the transition hours? – 10 and 50 are not necessarily demonstrative of anything. Where to set the new unit hierarchy percentile? – In general, higher is better—want the new units to operate a lot. – Region should be reviewed/understood before deciding. Limits or caps on relative differences between peak and annual growth rates? 13