L2 CAL Status Vadim Rusu For the magnificent L2CAL team.

Slides:



Advertisements
Similar presentations
 Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting.
Advertisements

Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
1 Pulsar firmware status March 12th, 2004 Overall firmware status Pulsar Slink formatter Slink merger Muon Reces SVT L2toTS Transmitters How to keep firmware.
Using the Trigger Test Stand at CDF for Benchmarking CPU (and eventually GPU) Performance Wesley Ketchum (University of Chicago)
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
1 Design of Pulsar Board Mircea Bogdan (for Pulsar group) Level 2 Pulsar Mini-Review Wednesday, July 24, 2002.
Burkard Reisert June 11 th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting Ted’s overview talk: Pulsar production/testing success !  all hardware.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
L2CAL Pulsar Upgrade Proposal in 24 minutes An Executive Summary Ted Liu For the L2CAL upgrade team Pisa/Purdue/Rockefeller/UC/Upenn /Madrid/Padova/Academica.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Some features of V1495 Shiuan-Hal,Shiu Everything in this document is not final decision!
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Commissioning Experience and Status Burkard Reisert (FNAL) L2 installation readiness review:
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
1 Pulsar Design Mircea Bogdan Level 2 Pulsar - Production Readiness Review Friday, Nov.7, 2003.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
For more information on Pulsar board: Burkard Reisert (FNAL) Nov. 7 th, 2003 PULSAR Production Readiness.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Simple ideas on how to integrate L2CAL and L2XFT ---> food for thoughts Ted May 25th, 2007.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
NA62 straw tracker readout status Georgios Konstantinou
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Project Overview Ted Liu Fermilab Sept. 27 th, 2004 L2 Pulsar upgrade IRR Review
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
L2CAL Pulsar Upgrade Proposal in 24 minutes An Executive Summary Ted Liu For the L2CAL upgrade team Pisa/Purdue/Rockefeller/UC /Madrid/Padova/Academica.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
The DØ Silicon Track Trigger Wendy Taylor IEEE NSS 2000 Lyon, France October 17, 2000  Introduction  Overview of STT  STT Hardware Design u Motherboard.
Pulsar Status Report Ted Liu Friday Trigger Meeting, May 10th. 02 PULSAR: PULSer And Recorder Pulsar design overview:  from L2 teststand tool to a general.
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
Pulsar Hardware Status Burkard Reisert (FNAL) March, 14 th 2003.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
November 15, 2005M Jones1 Track Lists in Level 2 Outputs from SLAM provide lists of tracks faster than the current path to SVT and Level 2 via XTRP Sparsify.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
TOP Trigger Status Xin Gao and Luca Macchiarulo Tuesday January 17 th,2012, University of Hawaii Belle II TRG/DAQ Workshop.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
A. Salamon - TDAQ WG Pisa 27/03/ Lkr/L0 Trigger V. Bonaiuto, N. De Simone, L. Federici, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
Initial check-out of Pulsar prototypes
CLAS12 DAQ & Trigger Status
Production Firmware - status Components TOTFED - status
Update on CSC Endcap Muon Port Card
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Commissioning of the ALICE-PHOS trigger
L2 CPUs and DAQ Interface: Progress and Timeline
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

L2 CAL Status Vadim Rusu For the magnificent L2CAL team

L2 CAL status 2 The goal Improve the L2 MET resolution so that we can run at lower MET at L2  L1 only uses 8/10 bits  No L2 calculation in the current system Change the jet clustering so that we can control the rates at high luminosity  Current L2 clustering – pacman style MET+2 JETS JET40

L2 CAL status 3 The design L1CAL Dirac Board Calorimeter L2 CPU L2 Decision Crate 10-bits Energy/Tower 8-bits Global L2 Decision L2CAL Cluster Finder Dcas New Hardware Path L2 CPU Muon/XTRP/L1/SVT/XCES  Add new hardware to send the towers straight to the L2 PC  Get new PC for better performance (about time anyway)  Everything to be commissioned parasitically

L2 CAL status 4 The project An international mini-collaboration  Fermilab  Chicago  Madrid  Padova  Penn  Pisa  Purdue  Started – Oct 2006  Completed - ASAP

L2 CAL status 5 The know-how Use PULSARs as receivers for the LVDS data from DIRAC  Need to interface the 40 bit cables with the PULSAR  Build Mezzanine card Serialize the data in Slink format  Receive on PC through Slink-PCI boards TIMING GOAL ~ 20 us Pulsar Crate (6) 40-bit CDF_clk (132 ns) 6 slink outputs 6 slink outputs Slink merger Pulsars (8) PC Data transfer latency on average within ~10 us 40 Mhz Pulsar Crate (6) 80 MhZ 40 MhZ Clustering timing ~ 10 us Pulsar Crate (6) 6 slink outputs 80 MhZ 96 LVDS cables

L2 CAL status 6 The tool FPGA Altera LVDS Connector Pulsar side 40 EM HAD 10bits x4 = cdfclk (132ns) input data per cable JTAG Pulsar front panel 160 CMC Connectors to the pulsar  L2 CAL mezzanine card

L2 CAL status 7 The tool Built at UC in record time  Thanks Henry and e-shop Tested and commissioned revision 1.0 over the holidays  Worked out of the box Ted makes good for the bet he lost.

L2 CAL status 8 The pieces Mezzanine design  Laura Testing/Checkout  Lucas, Miguel Firmware  Marco, Laura FER code  Massimo, Laura Simulation package  Simone D., Gene F. Monitoring  Giorgio + Simone P., Michael – Wojtek/Carla – consulting PC infrastructure and algo  Gene + Kristian Hahn – consultant PC interface  Anadi Preparing the celebrations (parties, happy hours, etc…)  myself

L2 CAL status 9 The status Boards – arrive over the month of February  Mezzanine, Slink, AUX (Henry – UC) Front panels and strain relief (Richard – UC)  Pulsars (Paola – Pisa) Cables – 80% in hand  Cable map (thanks JDL) Software – final testings Firmware – stage 1 ready to go

L2 CAL status 10 The plan Start splitting the cables one DCAS crate at a time starting next week Have half the DCAS system split and parasitically running by the end of February March have all system running parasitically April – new trigger tables May – Project completed  10 bit MET resolution  New Jet algorithm (cone based)

L2 CAL status 11 The future The L2 CAL trigger will be a very versatile system What the new L2CAL will provide:  10 bit MET at L2  Better L2 jet position  L2 jet closer to offline jets What else?  Angular correlations (jets, MET)  Track jet matching  Dijet mass New paradigm: Your offline analysis code can be implemented in the trigger  Use the L2 CAL simulation to do studies that will improve the trigger selection  Already starting on this in the context of HTTF

L2 CAL status 12 THE END