© ABB Inc. - 1 A robust portfolio of interoperable solutions Getting started with Industrial IT Certification Document# 3BSE042726, September 2005.

Slides:



Advertisements
Similar presentations
Our Corporate Mission Quality Systems Management, Inc. (QSMI)
Advertisements

What is Business Architecture?. Overview Agility matters today more than yesterday Previous methods for managing change were designed for the needs of.
© Telelogic AB Modeling DoDAF Compliant Architectures Operational Systems Technical.
System Integration Verification and Validation
HP Quality Center Overview.
<<Date>><<SDLC Phase>>
Bringing it all Together Sierra as Library Services Platform Today and Tomorrow Next Generation Library Services Platform Steven Nielsen Vice President-
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
2003 Indigo Technology, Inc. All Rights Reserved Alliance Portfolio Computing Infrastructure Services Customer Relationship Management Engineering Services.
Stepan Potiyenko ISS Sr.SW Developer.
ISS IT Assessment Framework
School of Computing, Dublin Institute of Technology.
Configuration Management
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Process, Communication, and Certification Padma Venkata
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Introduction to Software Testing
Configuration Management
Release & Deployment ITIL Version 3
Effective Methods for Software and Systems Integration
How get your project management or professional services organization ISO 9001 certified.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 KTN106 – KTN Account Team / Partner Presentation_ v1.1.ppt KTN Preparation for Account.
Software Quality Assurance Activities
© 2006 Avaya Inc. All rights reserved. Avaya Services Michael Dundon Business Development Manager.
From Research Prototype to Production
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Copyright © 2004 by The Web Services Interoperability Organization (WS-I). All Rights Reserved 1 Interoperability: Ensuring the Success of Web Services.
Configuration Management (CM)
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
L ON M ARK Interoperability Association L ON M ARK ® Transportation Meeting April 28, 1999 Brooklyn, New York.
1-1 System Development Process System development process – a set of activities, methods, best practices, deliverables, and automated tools that stakeholders.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
© Copyright year ABB. All rights reserved BSE033264R0001, Industrial IT for improved productivity.
Landstar Application Case Study: Development Of Content-rich Solutions For The Mobile Employee Bob Leo Director of Professional Services October 15, 2000.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Develop Project Charter
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Quick Recap Monitoring and Controlling. Lesson 11: Monitoring and Controlling Project Work Topic 11A: Identify the Monitor and Control Project Work Process.
Updates to the Windows Logo Program Tools for Windows 7 Karl FroelichCraig Rowland Lead Program ManagerSenior Program ManagerOnline Device Services
Software Engineering Lecture # 1.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
Lectures 2 & 3: Software Process Models Neelam Gupta.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
Overview + Digital Strategy + Interactive Engineering + Experience Design + Product Incubation + Data Visualization and Discovery + Data Management.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Supportability Design Considerations
CIM Modeling for E&U - (Short Version)
Chapter 11: Software Configuration Management
Overview of PROFITsystems’ Integration with DispatchTrack
Software and System Delivery
PROJECT SCOPE MANAGEMENT
Quality Management Systems – Requirements
BU IS GIG Chemical, Oil & Gas
Engineering Processes
Product Development Scenario Overview
Introduction to Software Testing
Chapter 11: Software Configuration Management
PROJECT SCOPE MANAGEMENT
PSS verification and validation
Software Reviews.
Presentation transcript:

© ABB Inc. - 1 A robust portfolio of interoperable solutions Getting started with Industrial IT Certification Document# 3BSE042726, September 2005

© ABB Inc. - 2 System 800xA is the core of Industrial IT Integrated ABB & 3 rd party products complete the IIT portfolio Industrial IT products will be “integrated” on market need basis Only products that have been tested to prove their integration capability will be marketed as Industrial IT enabled. 800xA 800xA Extensions 800xA Software 800xA Hardware Industrial IT is ABB’s commitment to open interconnectivity of Automation and Power solutions and services, leveraging the ABB portfolio, 3 rd party products and the relevant standards to deliver Continuous Productivity Improvement for our customers: Industrial IT Strategy & Definition Industrial IT enables ABB to provide three core values to our customers: Reduced Total Cost of Ownership (TCO) Increase Production Output Reduced Risk and Improved Safety

© ABB Inc. - 3 Industrial IT Architecture Single window environment for information access Context sensitive decision and action tools Unique object-oriented architecture Certified “building blocks” for maximum interoperability Field bus technology support for intelligent devices At the core of Industrial IT is an information architecture that seamlessly links equipment and applications in real time. Industrial IT technology consists of: Verified by Certification

© ABB Inc. - 4 Value of Certification Certification is focused on integration and usability: Installation Documentation Operation Certification testing verifies a products installation, documentation and operation with respect to System 800xA, providing: Assurance of non-interference and integrated system test Documentation of required configuration and test results Certificate Formal certificate defining product and 800xA versions Certified product data sheet Value proposition identification

© ABB Inc. - 5 Certification Alternatives Product included within System 800xA and certification handled as part of the 800xA release program Decision by System Focus Team (SFT) Based on existing system requirements specification (SRS) Product integrated with 800xA based on market requirements Product owner develops integration ABB partners available to develop and maintain integration Costs paid by product owner Certification independent of System 800xA release schedule

© ABB Inc. - 6 Certification Centers Main Center: Vasteras, Sweden Certification Manager: Rolf Setthammar Americas Center: Wickliffe, Ohio, USA Responsible: Tem Murray Device Integration Center (fieldbus technology): Minden, Germany: Responsible: Detlef Bierwagen Bangalore, India: Responsible: Ajay-Krishna Koppam First Point of Contact: Rolf Setthammar

© ABB Inc. - 7 Product Requirements Internal / External market requirements: Performance, functionality (external) Product deliver as stand alone or part of an Industrial IT system Certification will ensure that the internal market requirements are met: Product has an ABB identity that makes the product unique and traceable Product is well documented Product has a defined quality (follows gate model) Product is supported in an Industrial IT system Integrated product will meet technical requirements according to IIT Certification checklist

© ABB Inc. - 8 Certification Pre-requisite The electronic documentation object (.afw file) is a pre-requisite for Industrial IT Certification. ABB Gate Model Local product management and development Prepare EDP Object Fill in Check list Create Afw-object Product definition Product identification Classification Quality Production Gather Documentation Reference Document 9AKK Finalize Upload to ABB library (ABB PLM) Submit to Certification manager (3 rd party) GO – Identification of project G1 – MRS G2 – SRS / project plan G3 – System design G4 – Document / release plan G5 – Beta / type test reports G6 – R&D project closed G7 – Product feedback

© ABB Inc. - 9 Certification Process Overview G1G2 Local product management and development Certification Test Certificate Issued G5 Certification Center Prepare release candidate Product test including checklist items Apply for certification Local product management and development G4 Prepare EDP Object Gather Documentation Product definition Finalize

© ABB Inc Product Owner IIT Marketing IIT Certification Center Product Owner Certification Test Details 1. Reserve time for IIT Certification (at G2) 2. Apply for IIT Certification (at G4) 3. Deliver project for Certification 4. Test according to IIT Certification requirements 5. Test report when test complete 6. Validate application / checklist 7. Issue IIT Certificate 8. IIT marketing program initiative begin 9. Begin using IIT Enabled symbol

© ABB Inc IIT Certificate (Software Example)

© ABB Inc IIT Certificate (Software Example)

© ABB Inc Certification – How to get started Contact Main Certification Center with request Submit existing documentation / product description The Certification Center will provide certification checklist for completion Based on documentation and checklist, the Certification Manager will: Advise correct certification alternative Advise testing considerations (simulation / hardware requirements) Determine preliminary test schedule Integration requirements to be defined (with Certification and PLM/SFT) Upon completion of test candidate Finalize test schedule and location with the Certification Center Certification test Test of installation and operation in 800xA test system Completion of test report Delivery of Certificate

© ABB Inc Where to find detailed information Detailed certification documentation can be found on the new Industrial IT Portal on inside.abb (live in October 2005). Go to inside.abb Divisions Automation Technologies Industrial IT Industrial IT Available Documents Industrial IT Portal