1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009.

Slides:



Advertisements
Similar presentations
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Michael Thow Cyber Security Engineering Supervisor
New Reactor Activities Joseph Colaccino, Senior Project Manager Division of New Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory.
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Cumulative Impacts James Slider November 7, 2013.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Licensing of Nuclear Power Plants in Pakistan
Stepan Potiyenko ISS Sr.SW Developer.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
1 Software Requirements Specification Lecture 14.
Software Engineering Institute Capability Maturity Model (CMM)
Effective Methods for Software and Systems Integration
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
Server Virtualization: Navy Network Operations Centers
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Building Hotel reservation System !!! The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
1 RIC 2009 Engineering Issues Design Acceptance Criteria Laura Dudes Deputy Director, Division of Engineering NRO/DE March 11, 2009.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
Lecture 7: Requirements Engineering
BE-SECBS FISA 2003 November 13th 2003 page 1 DSR/SAMS/BASP IRSN BE SECBS – IRSN assessment Context application of IRSN methodology to the reference case.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
New Reactor Construction Inspection
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
A Mid-Process Review Marilyn C. Kray Vice President, Exelon Generation President, NuStart Energy Development Regulatory Information Conference March 10,
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
CLOSE PROJECT OR PHASE CLOSING PROCESS GROUP PROJECT INTEGRATION MANAGEMENT.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
RIC 2009 Human Factors DAC/ITAAC Reviews Michael Junge USNRC/NRO/DCIP March 11, 2009.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Fukushima Flooding Task Force Jim Riley April 5, 2012.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Joe Bellini, Exelon Drew Miller Exelon April 6, 2012
TechStambha PMP Certification Training
Flooding Walkdown Guidance
Adding Nuclear Power to the Grid
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Anna Bradford, Deputy Director Division of New Reactor Licensing
TRTR Briefing September 2013
Engineering Processes
RESOLUTION OF GENERIC SAFETY ISSUE 191
HHS Child Welfare National IT Managers' Meeting
DOE Review of the LCLS Project October 2006
Atefeh Sadeghzadeh Control engineer – Target safety and control
Software Reviews.
LEARNING OBJECTIVES The key objectives of this lecture are to familiarize the workshop participants with the: Different stages of the licensing process.
Presentation transcript:

1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009

2 Purpose of DAC Allows NRC Reasonable Assurance Conclusions in Special Areas –Areas where as-built or as-procured design information is required Piping Radiation Protection –Areas subject to rapidly evolving technology I&C HFE

3 Challenges Design Certification Finality Applied to Design Process in These Areas Establishing and Implementing Process for Closure –When? –What? –Who? –How? Maintaining Standardization

4 DAC Closure Challenges—When? Timing for Closure –Prior to COL Issuance DCD Amendment R-COL Application S-COL Application –Following COL Issuance –Issues

5 DAC Closure Challenges—What? Level of Detail Required for NRC to Reach a Reasonable Assurance Conclusion –Piping ASME Design Reports –I&C Hardware Functional and System Design Documents –I&C Software Functional and Performance Requirements Design Documents

6 DAC Closure—What? Piping Closure of DAC –ASME NCA-3550 compliant Design Reports –HELB Analysis Engineering Design Verification Process –Detailed design implementation –May be used to confirm licensee’s implementation of DAC Critical Challenge is Level of Detail

7 DAC Closure—What? Instrumentation & Controls I&C DAC are Life-Cycle Phased –Planning, requirements, and design activities –Closure documents can be submitted either at the end of each Phase or following completion of the Design Activities –Hardware and Software Activities

8 DAC Closure—What? I&C Challenges Processes Vary across Platforms Level of Detail Understanding NRC Expectations Quality of Submittals NRC Inspections Communication of Process to NRC Early and Often is Critical

9 DAC Closure—What? HFE HFE DAC are Programmatic –NUREG-0711, Revision 2 –HFE Design Development Process defined in the DCD –Verified through the ITAAC at various phases of design development and implementation –Critical Challenges are Schedule for Implementation and Communication

10 DAC Closure—Who? Design is implemented by the Plant Designer but…. Formal DAC Closure Options –DC Holder (through DCD Amendment) –R-COL Applicant or Licensee During COL application review Post-COL issuance –S-COL Applicant or Licensee May require Exemption

11 R-COL DAC Closure—How? Present Design Information to NRC Inspectors and Technical Reviewers NRC Feedback Submittal of DAC ITAAC Completion Notification Letter NRC Acceptance Results in DAC Closure

12 Progress NRC/Industry Interactions –RG –NRC/Industry Task Force Efforts –Design-Centered Working Group Meetings –Numerous NRC/Designer Interactions including Engineering Design Verifications –NEI 08-01, “Industry Guideline for the ITAAC Closure Process Under 10CFR52”

13 Searching for Acceptance…. Success Hinges on: Clear Definition and Understanding of Detailed Criteria for Closure Agreement on Implementation Process Establishing a Manageable and Maintainable Schedule for Design Completion Activities Early and Often Communication Future COL Applications Benefit from Eliminating DAC either through DCD or COL Reviews