L ASER - WIRE U PDATE Commissioning of the PETRA3 Laser-wire Summary of first ATF-ext laser-wire Installation of ATF2 laser wire Grahame Blair CLIC Technical.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Myriam Newman April 13, 2007 Laser-Wire 1 Myriam Newman LC-ABD Meeting University of Oxford Thursday, April 13 Lens Performance Review Laser-Wire Team.
Beam Delivery Simulation Development & BDS / MDI Applications L. Nevay, S. Boogert, H. Garcia-Morales, S. Gibson, J. Snuverink, L. Deacon Royal Holloway,
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
A_RD_01 Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay French Labs. :
Latest laser-wire results ● How does a Laser-Wire work? ● Latest ATF results ● Focusing optics ● Latest PETRA results University of Oxford: Nicolas Delerue,
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Yb Fiber Laser System Xiangyu Zhou 19. Feb
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Installation of a Four-mirror Fabry-Perot cavity at ATF 1.Our setup/goal 2.Why 4 mirrors ? 3.The ATF 4-mirror cavity 4.The optical scheme 5.The laser/cavity.
NanoBPM schedule California Institute of Technology Toyoko Orimoto Cornell University Robert Meller DESY Vladimir Vogel KEK Hitoshi Hayano, Yosuke Honda,
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
Experimental Effort for Alternative Schemes Experimental Effort for Alternative Schemes Hirotaka Shimizu Hiroshima University ILC2007 at DESY Hamburg.
Status of R&D of Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Out Look KEK, Hiroshima University LAL (Orsay) in Collaboration withCELIA.
What’s already existing?What’s already existing? Laser system & impacts on Optics TransportLaser system & impacts on Optics Transport –Laser power –Focusing.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
IPBSM status and plan ATF project meeting M.Oroku.
Laser based Emittance Measurement for LINAC4 Project Overview & Current Status T. Hofmann, E. Bravin, U. Raich, F. Roncarolo, F.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
LC Beam Diagnostics Key Issues – Existing and Future Tests in Test Facilities – Thibaut Lefevre Manfred Wendt CERN.
CLIC Workshop 07 CERN, October 2007 Instrumentation Working Group In conference room Bldg Grahame Blair & Thibaut Lefevre.
European Plans for ATF2 G.A. Blair LCPAC, KEK 24 th March 2006 Overview CERN + LAPP EUROTeV UK France DESY.
LINEAR COLLIDER BEAM INSTRUMENTATION T. LEFEVRE, CERN ON THE BEHALF OF THE LC BEAM INSTRUMENTATION COMMUNITY.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Laser Wire: :LBPM G A Blair EUROTeV Scientific Workshop, Uppsala 27 th August 2008 Introduction Emittance extraction Experimental programme Laser R&D Summary.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF LBBD-collaboration Laserwire update Adams Institute (Oxford/Royal Holloway) G.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
PULSE LASER WIRE Laser pulse storage in an optical cavity as a beam monitor & an X-ray source Kaori Takezawa Kyoto Univ. 2nd Mini-Workshop on Nano Project.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Coherent Diffraction Radiation experiment Konstantin Lekomtsev, Grahame Blair, Gary Boorman, Pavel Karataev, Maximilian Micheler John Adams Institute at.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
Extraction Line Laser-wire 24 th January 2013 A.Aryshev, G.A.Blair, S.T.Boogert, L.Corner, L. Nevay, P.Karataev, N.Terunuma, J.Urakawa, R.Walczak.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
LUCX FACILITY INTRODUCTION : PRESENT STATUS AND FUTURE PLANS A. Aryshev On behalf of QB group and THz collaboration Mini-workshop for advanced THz and.
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Workshop for advanced THz and Compton X-ray generation
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
CLIC-UK Collaboration CERN, May 9 – 11, 2012 Pavel Karataev John Adams Institute for Accelerator Science at Royal Holloway, University of London.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
T. Aumeyr 1, L. Bobb 1, 2, M. Billing 3, E. Bravin 2, P. Karataev 1, T. Lefevre 2, S. Mazzoni 2, H. Schmickler 2 1.John Adams Institute at Royal Holloway,
February 17-18, 2010 R&D ERL Brian Sheehy R&D ERL Laser and laser light transport Brian Sheehy February 17-18, 2010 Laser and Laser Light Transport.
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
3rd September 2004 G. Blair, RHUL1 Laser Wire Update G. A. Blair Royal Holloway Univ. London ECFA LC Workshop Durham 2 nd September 2004 Laser-wire at.
3/10/061 Smith- Purcell radiation bunch profile diagnostics / Laser wire Lawrence Deacon, LCUK Meeting, Durham 25/9/06.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
Lasers in Particle Accelerators
R&D description Schedule
Testbeam plans for LEP instrumentation
Plans for Laser-wire System Grahame Blair 30th May 2005
Laserwire: high resolution non-invasive beam profiling
Beam Size Monitor Model
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
Laser-wire Measurement Precision
Presentation transcript:

L ASER - WIRE U PDATE Commissioning of the PETRA3 Laser-wire Summary of first ATF-ext laser-wire Installation of ATF2 laser wire Grahame Blair CLIC Technical Board CERN 29 th June

T HE RHUL T EAM Grahame Blair Laser-wire, BDSIM, … Stewart Boogert Laser-wire, low-Q BPM, ATF2… Pavel Karataev CDR, CTF3, ATF2 … Stephen Molloy RF Simulation, RTML, ATF2… Alessio Bosco Laser-wire (Anne Dabrowski) CTF3, … Lawrence Deacon Laser-wire, BDSIM (Alexey Lyapin) Laser-wire, BPM, ATF2, … Robert Ainsworth RF Simlation, Thomas Aumeyr Laser-wire Nirav Joshi BPM Konstantin Lekomtsev CDR/CTF3 Maximilian Micheler CDR/CTF3 + 2 others to join this year CLIC-related activities P OST -D OCTORAL RA S A CADEMICS P H D STUDENTS

3 DESY : V. Gharibyan, S. Schreiber, K. Wittenburg, K. Balewski B. Foster, N. Delerue, L. Corner, L. Nevay, R. Walczak Aumeyr, G. Blair, S. Boogert, G. Boorman, A. Bosco, L. Deacon, P. Karataev KEK: A. Aryshev H. Hayano, K. Kubo, N. Terunuma, J. Urakawa Laser-wire People

4 PETRA II

5 PETRAII Detector Requirements for detector material – short decay time (avoid pile up) – short radiation length – small Moliere radius Cuboid detector crystals made of PbWO 4 3x3 matrix of 18x18x150 mm crystals Energy resolution better than 5%

6 Q-switched, unseeded Laser Longitudinal Profile Example of a single shot measurement of the profile 500 ps window, resolution 5 ps 60 ps 66 ps

7 Laser Temporal Profile Unseeded Seeded

8 Laser Pointing Jitter Translates into a 1.6  m jitter at the LW IP for Both horizontal and vertical scans Translates to longitudinal so not relevant

9 PETRAII Results: Vertical Convoluted profile (takes<50s) Fit to Rayleigh formula

10 PETRAII Results: Horizontal Convoluted profile Fit to Rayleigh formula

PETRAIII Laser-Wire Installed early 2009 Easy initial commissioning Currently have Laser problems

PETRAIII Laser-wire

Breadboard layout Raw scan

ATF-ext Laser-wire

15 Aiming at micron-scale vertical scans ATF Laser-Wire

16 Layout in ATF Extraction line

17 ATF2 Detector

optimum Where we were running Effect of Optical Aberrations

Pulsed laser performance Profile scans (shows astigmatism) Temporal scans (shows laser pulse length)

Simple Gaussian Fit

22 Laserwire principle

Systematic Effects: Fit methods  Important to know beam aspect ratio

ATF2 Laser Infrastructure installation Large laser room on ATF2 shield blocks – Facility for future users – 6 m optical table – Temperature stabilised – Seismic safe

ATF2 Laser Tests Tasks completed: 1.Check laser working (sorted out cooling) – very good 2.Started work on software for DAQ and experiment control 3.Set up temperature logging around laser hut 4.Aligned cw laser into tunnel and through laser-wire IP 5.Completed laser pulse duration measurements 6.Started laser spatial quality measurements Interferometric autocorrelation Laura Corner Laurie Nevay Stewart Boogert Alex Aryshev (KEK) Intensity autocorrelation

Mode-Locked Oscillator Pulse duration: 10 ps Pulse energy: 15 nJ Pulse power: 1.5 kW Repetition rate: 62.5 MHz Average power: 1 W Fiber Amplifier Fiber Core 30  m Diode Pump Pw = 12W Pulse duration: 10 ps Pulse energy: 500 nJ Pulse power: 50 kW Repetition rate: 1 MHz Average power: 500 mW RHUL Mode-Locked Laser Current Status Pulse duration: 10 ps Pulse energy: 180 nJ Pulse power: 18 kW Repetition rate: 62.5 MHz Average power: 12 W Pulse duration: 10 ps Pulse energy: 10 nJ Pulse power: 1 kW Repetition rate: 1 MHz Average power: 10 mW Pulse Picker Possible Improvement

Current Status PETRAII showed good results for an accelerator ring LW PETRAIII laser wire installed and commissioning has Started; however there are currently laser problems ATF-ext: Proof of principle for a BDS LW ATF2 LW has been installed and attempts at signal observation have so far been unsuccessful; there is a very long path for photon extraction (electron extraction not relevant due to relatively small Compton energy loss) Laser R&D ongoing at both RHUL and Oxford; fibre lasers are being actively developed and tested. (Funding issues beyond March 2011).

Relevant Publications Theory/emittance extraction: Phys. Rev. ST Accel. Beams 10, (2007) PETRAII laser-wire: Nucl.Instrum.Meth.A592: ,2008 ATF Laser-wire: Proc. PAC09 A. Aryshev et al. (PRST-AB in preparation) Possible fast scanning system based on EO: Applied Physics Letters 94, 1 (2009)