Negotiations and Agreements Between Ganges River Basin Riparians Khalid Khan Khalid Saifullah Muhammad Arif Goheer.

Slides:



Advertisements
Similar presentations
Irrigated Agriculture Sector in South Asia Challenges and Potential Soft Solutions Mani Manivasakan Practice Leader Rural Water.
Advertisements

THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Environmental Flow Issues in Ganga Basin ByN.N.Rai Director, Hydrology Central Water Commission.
Fresh Water Historically limiting factor in arid regions World population more than doubled 2.3 billion  5.3 billion Per capita water use doubled.
Indo-Nepali Water Relations Meg Patterson International Water Law April 7, 2009.
Flood Management in GBM Basin: A Mechanism for Natural Resource Management Between Co-riparians Priyanka Mallick JNU.
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
Transboundary Water Resources Paula Kulis Indus River
Hydropower Development: Experience of Nepal
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
Spatio-Temporal variability of Water resources in the Ganga basin By Subashisa Dutta Associate Professor DEPARTMENT OF.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
The Australian telecommunications access regime Presentation to ACMA International Training program 2006 Michael Eady Communications Group Compliance and.
EU: Bilateral Agreements of Member States
EU: Bilateral Agreements of Member States. Formerly concluded international agreements of Member States with third countries Article 351 TFEU The rights.
Colorado Basin Water Conference Dr. Tim Casey, Professor of Political Science Colorado Mesa University.
The Ganges Water Conflict Prof. Hem Raj Subedee, Ph.D. Conflict, peace and department studies Tribhuvan, University Kathmandu, Nepal.
1 Columbia River Forum Columbia River Treaty A Federal Perspective David Burpee Natural Resources Canada November 9, 2005.
Transboundary supply issues
Okavango Basin Abigail Tomasek. Okavango Basin Approximately 1600 km long Majority of basin undeveloped and one of.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
The Euphrates-Tigris River Basin By Ziad Al Awar.
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
Institutional and Legal Issues in Managing shared Water Resources The Arab Region's Experience Chara Ksia League of Arab States.
THE RHONE RIVER BASIN Alex Houston February 23, 2012.
The Ganga, especially, is the river of India, beloved of her people, round which are intertwined her memories, her hopes and fears, her songs of triumph,
The Jordan River Basin Fall Overview Location and History Importance of the Jordan Basin Problems in the Jordan Basin History behind the conflict.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
The Governments of Cambodia, Lao PDR, Thailand and Viet Nam signed the; “Agreement on the Cooperation for the Sustainable Development of the Mekong River.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Ms. Reba Paul, Bangladesh Water Partnership Bangladesh Water Partnership 2.3 billion people live in river basins under ‘water stress’(
Assessment and planning of the water resources under various scenarios in the Ganges and Indus basin: Glaciers contribution and WEAP modelling Devaraj.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 2.4.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Nishesh Mehta 27 th March Geography Originates in China India – upstream Pakistan – Downstream Main tributaries Ravi Jhelam Sutlej Chenab Beas.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 6.1.
Opportunities and Challenges of Water Resources Management in Lao PDR
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
Water Resources in the Indus-Gangetic Basin
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 2 APPLICATION OF BASIN PLANNING PRINCIPLES Phnom Penh January 2003.
Interest-Based Bargaining.  Interest-based bargaining involves parties in a collaborative effort to jointly meet each other’s needs and satisfy mutual.
The Mekong River Commission: Challenges, Mission, and Strategies.
Mekong River Commission Meeting the Needs - Keeping the Balance MRC Water Utilization Programme: GEF International Waters Project (GEF/World Bank)
Improving Purchasing of Clinical Services* 21 st October 2005 *connectedthinking 
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 Refining Objectives and Developing Scenarios.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
JORDAN RIVER BASIN GROUP: MEHR SALEEM, TAHIR ABBASI AND MOHSIN MUNIR Israel Jordan Treaty-1994.
Mekong River – Negotiations Kamran Soomro Shabeena Faraz Zareen Fiza Qureshi.
River Nile Group Work. Problem Statement Issue: forward look on equitable distribution and efficient utilization of Nile water resource amongst 10 Riparians.
International Conventions on Collective Bargaining.
The Mekong River Commission: Challenges, Mission, and Strategies.
Benefit (Cost) Sharing In the context of the Okavango.
The Azerbaijani Republic The Ministry of Ecology and Natural Resources WATER RESOURCES OF AZERBAIJAN, THEIR MANAGEMENT AND BILATERAL AGREEMENTS Matanat.
Mahakali. Sarada Agreement 1920 sharing of the Mahakali River India exchanged 4000 acres of land for 2898 acres of land of Nepal Maintenance, Operation,
POTENTIAL FOR IMPROVEMENT IN CONJUNCTIVE MANAGEMENT OF SURFACE AND GROUND WATER SUPPLIES IN IBIS Muhammad Basharat, IWASRI-WAPDA,
A Jurisprudential Model for Sustainable Water Resources Governance By Professor D. E. Fisher.
The United Nations Charter How the members organise peace in times of potential conflict.
1.Who is in favour of this? Why? 2.Who is against this? Why?
Environment, Climate Change and Water Tenzin Wangmo Chief Environment Officer National Environment Commission April 6, 2016.
The Blackfeet Water Rights Settlement Act
Objectives of WHO's collaboration with NGOs
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Protection, Transparency, Exclusion
Agenda 5.11 General Regulations
Benefit (Cost) Sharing
Gathering Background Information and the Role of Technicians
Presentation transcript:

Negotiations and Agreements Between Ganges River Basin Riparians Khalid Khan Khalid Saifullah Muhammad Arif Goheer

 Total Watershed Population: 200 million  Total Watershed Area: 1,634,900 km2  Land Use: agricultural cropland, pasture, industrial use, urban high density, religious/cultural sites  Important Uses of Water: Agriculture or Irrigation, Domestic/Urban Supply, Hydropower Generation Features of the Watershed

 Dramatic seasonal variations in rainfall Problems developed between India and Bangladesh  The headwaters of the Ganges and its tributaries lie primarily in Nepal and India, where snow and rainfall are heaviest  Newer treaty is unlikely to make any substantial contribution to alleviate water scarcity during the dry season in southwestern Bangladesh Hydrologic and Geopolitical Background

 India, as the upper riparian, developed plans for water diversions for irrigation, navigability, and water supply interests.  Bangladesh, has interests in protecting the historic flow of the river for its own downstream uses.  This potential clash set the stage for attempts at conflict management. The Problem

 1960–1970 – a series of meetings were held but were not successful because of lack and inefficient data provided by Pakistan and other technical facts.  Pakistan’s goal: Substantive talks on the framework for a settlement for equitable sharing of the Ganges waters between the two countries." Attempts at Conflict Management

 Construction and maintenance of such works, if any, in India as may be necessary in connection with the construction of the Ganges Barrage in Pakistan ;  Setting up of a permanent Ganges Commission to implement the agreement;  Machinery and procedure for settlement of differences and disputes consistent with international usages. Pakistan’s Proposal

 The point of delivery of supplies to Pakistan of such quantum of water as may be agreed upon will be at Farakka  Constitution of a body consisting of one representative from each of the two countries for ensuring delivery of agreed supplies at Farakka is acceptable in principle  A meeting would be held in three to six months’ time at a level to be agreed to by the two governments to consider the quantum of water to be supplied to Pakistan at Farakka and other unresolved issues relating thereto and to eastern rivers which have been subject matter of discussions in these series of talks. India’s Recommendations

Ganges Water Agreement covers;  Sharing the waters of the Ganges at Farakka.  Finding a long term solution for augmentation of the dry season flows of the Ganges. Outcomes

There were two general approaches to augmenting Ganges Flow presented to the Commission, which defined the negotiating stance for years:  Augmentation through storage facilities within the Ganges basin, proposed by Bangladesh  Augmentation through diversion of water from the Brahmaputra to the Ganges at Farakka by a link canal, proposed by India. Approaches

 There is adequate storage potential of monsoon flow in the Ganges Basin for Indian needs;  There is additional storage along the headwaters of the Ganges tributaries in Nepal, and that country might be approached for participation;  A feeder canal from the Brahmaputra to the Ganges is both unnecessary and would have detrimental effects within Bangladesh, not least of which would be massive population resettlement;  Indian needs would be better met through amending the pattern of diversion of Ganges water into the Bhagirathi Hooghly, and constructing a navigation link from Calcutta to the sea via Sunderban. Bangladesh Position

 Additional storage possibilities in India are limited, and not sufficient to meet Indian development needs;  The most viable option both to supplement the low flow of the Ganges, and for regional development, is a link canal and storage facilities on the Brahmaputra, to be developed in stages for mutual benefit;  Approaching Nepal or other third countries is beyond the scope of the Commission, as is discussing amending the pattern of diversion into the Bhagirathi Hooghly;  Constructing a separate navigation canal is not connected to the question of optimum development of water resources in the region. India Position

 In January 1976, Bangladesh lodged a formal protest against India with the General Assembly of the United Nations which, on November 26, 1976, encouraging the parties to meet urgently at the ministerial level for negotiations, "with a view to arriving at a fair and expeditious settlement."  At an April 18, 1977 meeting, an understanding was reached on fundamental issues, which culminated in the signing of the Ganges Waters Agreement Diplomatic Techniques Role of Third Party

 In December 1996, a new treaty was signed between the two riparians, based generally on the 1985 accord, which delineates a flow regime under varying conditions.  The most notable change in the 1996 Ganges River Treaty is the establishment of a new formula for the distribution of Ganges waters from January 1st to May 31st, the region's dry season, at Farraka Barrage.  The following schedule is to be respected with regards to 10day period flows. If flows at Farakka Barrage should fall below 50,000 cusecs, the two governments will meet together to consult as to the appropriate actions taking into consideration "principles of equity, fair play and no harm to either party." Strategic Approach

Flow AmountIndiaBangladesh <70,000 cusecs50% 70, ,000 cusecs Balance of flow35,000 cusecs Ganges River’s Allocations