Kitsap County SMP Work Group August 2, 2011. Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process.

Slides:



Advertisements
Similar presentations
An Overview of the 2007 WRIA 8 Implementation Survey Presented to the WRIA 8 Salmon Recovery Council January 17, 2007.
Advertisements

Shoreline Master Program Update Shoreline Master Program Update: Process Overview City of Benton City August 30,
Shoreline Master Program Update: Planning Commission Benton City, WA June 24,
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Fish and Wildlife Protection through Critical Areas Ordinances: WDFW’s role.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Shoreline Management Act approved by voters in the early 1970’s to: – Encourage water-dependent uses – Protect shoreline natural resources – Promote public.
Shoreline Master Program Update. Shoreline Management Act approved by voters in the early 1970’s to: – Encourage water-dependent uses – Protect shoreline.
Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
Clallam County Shoreline Master Program Update: Cathy Lear for DRMT October 2009.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Local Updates to Shoreline Management Master Programs Kitsap County and Cities Discussion Meetings Informational Briefing.
Agenda for Improving Lake Washington’s Shoreline Habitat July 19, 2007 Ruth Howell, Kelli Roberts, Bryan Russo, Angela Wallis, Gregg Casad, and Dave Fries.
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
Island County SMP Shoreline Residential Development Workshop December 5, 2011.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Alachua County Wetland Protection Regulations Alachua County Board of County Commissioners October 22, 2013.
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller.
An Overview of Recent Changes To the EEP Restoration Plan and Mitigation Plan Templates Steven D. Roberts Vegetation Senior Specialist
The Legal Implications of Sea Level Rise Erin Crisman-Glass Attorney at Law The Washington Climate Change Impacts Assessment Conference Conference Presentation:
Section 404 of the Clean Water Act 404(b)(1) Guidelines Field Exercise
Kitsap County Shoreline Master Program Update Task Force Work Group Meeting August 16, 2011.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Summary of Proposed Changes to Shoreland Zoning Ordinance April 10, 2012.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Shoreline Master Program Update First Review of Preliminary Draft Shoreline Master Program City of Wenatchee April 15,
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Shoreline Master Program Update First Review of Preliminary Draft Shoreline Master Program [Entity] [Month Day, 2009] 1.
KITSAP SMP TASK FORCE Reconvened Meeting #1 November 9, 2011 Draft SMP Progress Update.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Lakes District At Louisiana State University CAP 206 Project US Army Corps of Engineers New Orleans District.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Spokane River Riparian Enhancement Project at State Line.
Habitat Restoration Area PLEASE DO NOT DISTURB THE VEGETATION BEYOND THIS FENCE CAUTION: STRONG CURRENTS, UNEVEN RUGGED AND SLIPPERY WALKING SURFACES THANK.
Nonconforming Uses and Structures Washington Dept. of Ecology Betty Renkor October 25, 2007.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
August 30, 2011 Board of County Commissioners. Background Physical Description Small cylindrical beige to grayish nearly legless lizard Adults 4 to 5.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
ENOTICE Guide Center for Coalfield Justice. Summary eNOTICE is the Pennsylvania Department of Environmental Protection's (DEP) Electronic Notification.
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
Land Use Planning in Oroville: How is the Community Thinking? Presenter: Chris Branch Community Development Director City of Oroville Ph:
Washington’s Shoreline Management Act and Shoreline Master Program Updates City of Fife Special Planning Commission Meeting May 19, 2019.
LESSONS LEARNED January 2007 Presented by: Thomas J. Young, Assistant Attorney General Peter Skowlund, Department of Ecology.
Permitting in the Shoreline 201 What all Homeowners Need to Know.
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
KITSAP COUNTY SMP UPDATE Board of County Commissioners Decision-only hearing to consider local adoption of SMP January 28, 2013 Kitsap County Department.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
Back River Flooding and Shoaling Citizens Committee Back River Flooding and Shoaling Citizens Committee August 15, 2007.
Restoration of the Swan Pond Embayment Michelle Cagley, Tennessee Valley Authority.
PORT OF TACOMA. 1. Background 2. City Process Update 3. Review Guiding Principles 4. Next Steps General Business: City of Tacoma Shoreline Master Program.
Draft California Eelgrass Mitigation Policy PUBLIC MEETING Oakland, California June 27, 2012 Korie Schaeffer NMFS Habitat Conservation Division.
Wetlands Focus Group. Responsibilities and Goals   Growth Managements Act (Chapter 163, FS) of 1985   Included the adoption of the State Comprehensive.
The Mystery of the Disappearing Sand
Environmental Critical Areas Regulations
Continuing Authorities Program
Nourishment, Groins, Seawalls, Breakwaters, Jetties.
Shoreline Trees & Shrubs
Construction Management & Inspection
Identifying Barriers to Fish Passage in Mason County
US Army Corps of Engineers
Southern Delivery System
Flood Plain Regulations
Winter Water: A hot topic for cold fish.
Moving Our Coastal Lakes Into a Healthier and More Resilient Future
Beach Erosion.
NMTA Permitting Marinas and Boatyards 2012 Regulatory Developments
Presentation transcript:

Kitsap County SMP Work Group August 2, 2011

Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process (Kitsap County, WDFW) WAC Guidelines Photo Tour of County Shorelines Issues for Discussion: o New bulkheads o Repair / Replacement o Appurtenances o Incentives Breakwaters, Jetties, Groins Wrap up

Permit Process: Local Jurisdiction (Kitsap County) Washington Department of Fish and Wildlife Army Corps (if at or below Mean High Water)

WAC Guidelines [WAC (3)(a)] Shoreline Stabilization New development should be located to avoid need New structural stabilization shall not be allowed except: when necessary to protect existing primary structures for new and existing development under specific conditions ecological restoration projects, when determined necessary Geotechnical reports must address time frame (3 years) Must consider soft shoreline stabilization measures When allowed, must be at or near Ordinary High Water Mark, replacements included.

Issues: New Bulkheads Repair and Replacement Appurtenance Protection Incentives

Breakwaters, Jetties, Groins, and Weirs Only allowed where necessary to protect water dependent uses, public access, shoreline stabilization, or other specific public purpose. Require a Conditional Use Permit, except where installed to protect or restore ecological functions Provide for mitigation [WAC (2)(e)]

Wrap Up Summary will be ed to Task Force Next Meeting: August 16 – Buffers