Public Meeting August 19, 2015 Williams Cr (Shoup Bridge) Replacement Project.

Slides:



Advertisements
Similar presentations
Emergency Response via the Web Two emergencies in August 2007 highlight the Internet as a dynamic communication tool.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Replacement of the Queens Approach Bronx-Whitestone Bridge
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
ROCKY CREEK VIADUCT FINAL DESIGN. PROJECT DEVELOPMENT TEAM HERNAN PEREZ – STRUCTURE PROJECT ENGINEER FRITZ HOFFMAN – SENIOR BRIDGE ENGINEER BRIAN FULLER.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
6 th Street Water Main And Street Reconstruction 2013.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Utah’s Use of CMGC & Project Delivery
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
I-65 Added Travel Lanes Project in Tippecanoe County
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Current Construction Projects Major Projects Pinellas County.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Julius West Middle School Construction Updates
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
“Get in, do it right, get out, and stay out.”
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Holland High School Construction Update June 8, 2011.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
BRIDGE CONSTRUCTION FORUM 2006 Work Window Restrictions.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Maintenance and Temporary Traffic Control
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Chapin Town Hall Meeting
June 5, 2017.
June 26, 2017.
Low Level Road Project – Traffic Management Meeting August 2012
Work Zone Safety Review – District 1 - Duluth
US26: Cornelius Pass Rd -185th Ave
Facilities Report to the Buffalo State College Senate May 6, 2016
Measure A Financial Oversight Committee August 7, 2013
Highway 169 Bridge Replacement & Pavement Resurfacing
Issaquah-Fall City Road
Colchester Interceptor System Improvements Project
PROJ. 566(17) LOR PID MAJOR WIDENING
Galt Court Water Main Replacement
Metropolitan District | mndot.gov
Presentation transcript:

Public Meeting August 19, 2015 Williams Cr (Shoup Bridge) Replacement Project

WFLHD: Greg Gifford -Project Manager Scott Smithline- Environmental Specialist Benn Oltmann- Structures Manager Consultant Team: Mark Hirota -Project Manager Stacy Thomas - Public Information Specialist Matt Miller -Bridge Lead Chivanna Pot – Roadway Lead Evan Garich – Geotechnical Lead Pete Geiger – Environmental Lead Shoup Bridge Replacement Project Team

Project Schedule Typical Arch Construction Slide in Illustrations Next Steps How to Stay Involved Questions and Comments Agenda

Project Schedule Construction will start Summer 2016 and last about 2 years FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1

Project Schedule – 70% 70% Design: The Project Design is Currently at 70% complete FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV In-Water Work Restriction Typical High Flows STAGE III PHASE 1

Project Schedule – 100% 100% Design: The Design should be completed in Spring FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1

Contracting: The process of contracting with a construction contractor should be completed by Early Summer In-Water Work Restriction Ends June 15 th. Project Schedule – Hire Contractor FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1

Project Schedule – STAGE I, PHASE FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE I, PHASE 1: Construct Access and Work Bridge Single Lane Traffic Remains on the Existing Bridge Work Bridge shifts River Traffic to Shallow side.

Project Schedule – STAGE I, PHASE FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE I, PHASE 1: Construct Temporary Bridge Supports. Single Lane Traffic Remains on the Existing Bridge

Project Schedule – STAGE I, PHASE FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE I, PHASE 1: Construct Detour Road Single Lane Traffic Remains on the Existing Bridge

Project Schedule – STAGE I, PHASE 2 STAGE III In-Water Work Restriction Typical High Flows PHASE FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE I, PHASE 2: Construct New Bridge at the Temporary Location Single Lane Traffic Remains on the Existing Bridge Occasional River Traffic Disruption

Project Schedule – STAGE II FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE II: Traffic Closure for a few hours. Shift Traffic (Single Lane) to the New Bridge

Project Schedule – STAGE II STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE II: Remove the Existing Bridge Occasional River Traffic Disruption FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV

Project Schedule – STAGE II STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE II: Construct New Bridge Abutments FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV

Project Schedule – STAGE II FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE II: Construct Roadway Approaches

STAGE III: Close the Bridge to Traffic for 48 Hours (Feb 2018) Slide New Bridge from Temporary Location to New Location Project Schedule – STAGE III FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1

Project Schedule – STAGE III FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1 STAGE III: Two Traffic Lanes on the New Bridge

STAGE IV: Remove Temporary Work Bridge And Abutments Install Riprap around New Abutments Re-vegetate and Restore site. Project Schedule – STAGE IV FallWinterSpringSummerFallWinterSpringSummerFallWinterSpringSummer JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA 70% Engineering 100% Engineering Hire a Contractor STAGE ISTAGE I, PHASE 2 STAGE II STAGE IV STAGE III In-Water Work Restriction Typical High Flows PHASE 1

Williams Cr (Shoup Bridge) Replacement Project TYPICAL THROUGH ARCH CONSTRUCTION SEQUENCE

Arch Construction Stage I, Phase 1 (Summer- Fall 2016)

Arch Construction Stage I, Phase 2 (Fall 2016-Summer 2017)

Arch Construction Stage I, Phase 2 (Fall 2016-Summer 2017)

Arch Construction Stage I, Phase 2 (Fall 2016-Summer 2017)

Arch Construction Stage I, Phase 2 (Fall 2016-Summer 2017)

Arch Construction Stage I, Phase 2 (Fall 2016-Summer 2017)

Arch Construction Stage I, Phase 2 (Fall 2016-Summer 2017)

Arch Construction Stage III & Stage IV (Winter 2018-Summer 2018)

Williams Cr (Shoup Bridge) Replacement Project SLIDE-IN BRIDGE ILLUSTRATION

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Slide-In Illustration Stage 3- Looking West

Next Steps Winter 2016: Complete the Engineering Spring 2016: Hire a Contractor Summer 2016: Meet-The-Contractor During Constr.: Periodic Public Meetings Summer 2018: Project Complete

How to Stay Involved Website: Mail: JLA Public Involvement 1110 SE Alder, Suite 301 Portland, OR 97214

Williams Cr (Shoup Bridge) Replacement Project Questions & Comments ?