Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.

Slides:



Advertisements
Similar presentations
18 Bit ADC Status Collaboration meeting May 18, 2007.
Advertisements

The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Analog Comparator Positive input chooses bet. PB2 and Bandgap Reference. Negative input chooses bet. PB3 and the 8 inputs of the A/D. ACME= Analog Comparator.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Pulse Width Modulation (PWM) LED Dimmer Circuit
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
MB, 9/8/041 Introduction to TDC-II and Address Map Mircea Bogdan (UC)
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Data Acquisition ET 228 Chapter 15 Subjects Covered Analog to Digital Converter Characteristics Integrating ADCs Successive Approximation ADCs Flash ADCs.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
P. Aspell PACE 3 design meeting 10,11/10/02 Thursday Analog : Morning : DELTA : Delta architecture, project status..... Paul Front-end design
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
Trip-t testing progress report
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
L.Royer – Calice Manchester – Sept A 12-bit cyclic ADC dedicated to the VFE electronics of Si-W Ecal Laurent ROYER, Samuel MANEN LPC Clermont-Ferrand.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
QIE10 development Nov. 7, 2011: The first full-chip prototype was submitted to MOSIS. Output is 2-bit exponent (four ranges) and 6-bit mantissa (non-linear.
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Design of the 64-channel ASIC: update DEI - Politecnico di Bari and INFN - Sezione di Bari Meeting INSIDE, December 18, 2014, Roma Outline  Proposed solution.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
Rainer Stamen, Norman Gee
"North American" Electronics
A 12-bit low-power ADC for SKIROC
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
BNL electronics: first tests
Power pulsing of AFTER in magnetic field
F.Guber, A.Ivashkin INR, Moscow
BESIII EMC electronics
Calorimeter calibrations with Flight Software.
PID meeting Mechanical implementation Electronics architecture
Presented by T. Suomijärvi
Readout electronics system for Laser TPC prototype
Presentation transcript:

Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately with numerous errors concerning mechanical specifications of parts and their mounting pads – expect to have this fixed by 12/12, to receive 5 boards on 12/20 Power board – layout is still in progress (delayed by readout board fixes) – expect to have completed on 12/16 and to receive 5 boards during week of 12/23 Interface board – layout completed (by AVID, work started 11/26, just finished) – expect to have 60 boards on 12/27 FEE board – layout completed 12/10/02 – expect to have 240 boards on 12/23/02 Mechanical First box and FEE heatsink parts are expected in 1/03; design is now finalized (approx. 12/6/02). Parts We have all parts for 5 boxes, except: Simple resistors and capacitors (2-day deal, always in stock) Have only 100 ADC’s, 50 FEE FPGA’s (one box full) Most of the internal connectors will only be here at Christmas Clock multiplier chip not found yet – but we can live without it for a while A few other items we have only for 1 box so far Parts count: 10,338 parts per box (937 IC's, 301 transistors, 212 diodes, 4122 capacitors, 4415 resistors, 214 connectors, and 137 assorted other bits). Gadzooks!

Status of MAPMT FEE Electronics Summary of Specifications Resolution: 12 bits (4096 LSB) (LSB a.k.a. “channel”) 1/(Conversion gain): fC/LSB (±1.5 % channel-channel variation, tempco  ±100 ppm/K) Pedestal (excluding contribution of offset current): 97.5 LSB (±10 LSB channel-channel variation, tempco  ±0.3 LSB/K) Offset current: ±100 nA (so ±1.1 LSB pedestal 75 ns) at 25 °C; tempco probably ±5 nA/K Noise:   0.7 – 1.0 LSB (FEE noise only – does not include MAPMT gain fluctuations, etc.) History effects: anticipate <10 LSB error for event preceeded by a long run of full-amplitude events (but this is hard to estimate... we must measure) Flat-top integration window (to 0.1%): about 40 ns (reset interval will be set about 25 ns) Crosstalk: <1% (probably will be much better) No adjustments or trimming of the analog circuits – just build and test... Latency buffer size: 170 cycles (17.5  s) Test pulser: Each channel may be individually enabled or disabled to inject charge on the next subsequent pulser trigger command (which is received from the TCD). Pulser amplitude is set (calibrated to 5% accuracy) on the FEE board level, in common for all four channels. Pulser requires a pre-charge time of order 200 ms before each firing. (In particular, maximum rate is 4-5 Hz at best...) Reset pulse skipping: Normal readout will use a reset of the integrator on each RHIC cycle. Reset skipping mode will reset only every N th cycle. This is for diagnostic use (checking offset currents, for instance) and for use together with histogramming mode for gamma source calibration of the detector. Fault-tolerant design allows defective FEE modules to be switched off with no ill effects on the others. FSR 27.6 pC

Interface Board

FEE Board

FEE Assembly (MAPMT and CW Base Sold Separately...)

Readout “MUX” board