Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 DES Instrument Project.

Slides:



Advertisements
Similar presentations
Brenna Flaugher Sept. 26, The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics 1.4 Optics 1.5.
Advertisements

Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
DARK ENERGY SURVEY (DES) Francisco Javier Castander Serentill All material borrowed from DES collaboration IEEC/CSIC.
The National Science Foundation The Dark Energy Survey J. Frieman, M. Becker, J. Carlstrom, M. Gladders, W. Hu, R. Kessler, B. Koester, A. Kravtsov, for.
CCD Mosaics at CTIO and SOAR. Abstract: Mosaics based on 2K x 4K CCDs are briefly reviewed. An 8Kx8K mosaic of SITe002A CCDs is in use at the 4m Blanco.
Semiconductor Technology Associates Siliconus Maximus SDW2005 Scientific Detector Workshop June 19 – 25, 2005 Taormina, Italy Richard A Bredthauer Semiconductor.
Brian Schmidt, Paul Francis, Mike Bessell, Stefan Keller.
DES Meeting in Michigan April Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO, Barcelona, UCL, Cambridge, Edinburgh 1 Dark Energy Survey 5000 sq-deg.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
1 Large Synoptic Survey Telescope Review Kirk Gilmore - SLAC DOE Review June 15, 2005.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
Construction of the Dark Energy Camera Brenna Flaugher, DECam Project Manager CTIO Nov John Peoples (1 st DES Director ) Symmetry Magazine.
Bulk Silicon CCDs, Point Spread Functions, and Photon Transfer Curves: CCD Testing Activities at ESO Mark Downing, Dietrich Baade, Sebastian Deiries, (ESO/Instrumentation.
1 B. Flaugher P5 April 2006 The Dark Energy Survey From Scientific Goals to Science Quality Data Brenna Flaugher Fermilab April 2006 P5 Meeting.
Takeyasu Ito University of Tennessee EDM Collaboration meeting December, 2004 Cost and Schedule Estimate WBS 2.5- Neutron beam polarizer/splitter for SNS.
Advanced Concepts & Science Payloads Office Eddicam/EST MeetingPage 1 CCD Procurement Schedule driven Review off-the shelf availability Specific mode of.
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
1 K. Gilmore - SDW The Large Synoptic Survey Telescope (LSST) Status Summary Kirk Gilmore SLAC/KIPAC.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
Each 6” wafer contains: four 2k×4k, one 2k × 2k, eight 512 × 1k Follows SNAP model: Foundry performs first 8 steps on 650  m high resistivity wafers (10.
Juan Estrada July 25, Focal Plane Detectors WBS 1.2 this talk Breakout session L. Buckley-Geer J.E. T.Diehl H. Cease Multi CCD (part of WBS 1.5)
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Brenna Flaugher July 25-27,2006 Directors Review 1 The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics.
Brenna Flaugher Dark Energy Symposium StSci May The Dark Energy Survey (DES) Proposal: –Perform a 5000 sq. deg. survey of the southern galactic.
Each 6” wafer contains: 4 2k×4k, 1 2k × 2k, & × 1k Follows SNAP model: Foundry performs first 8 steps on 650  m high resistivity wafers (10 kohm-cm)
Brenna Flaugher DES presentation to the Fermilab PAC Nov. 12, 2004 Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 DES Technical Progress, Cost and.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
SNAP CCD Development Progress Hakeem Oluseyi January 9, 2003.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Julian David Rodriguez Javier.
Jim Annis for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Design of the Dark Energy Survey James Annis.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Focal Plane Detectors and CCD Camera Roger Smith Steven Kahn DECam CD-1.
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
A Detector Upgrade for LDSS3 Mike Gladders Jacob Bean (on the phone) with Andreas Seifart, Josh Frieman, John Carlstrom.
THE WEEKLY DETECTOR Taormina, Italia June, 2005 € 0.00 The Nerds are Back In Town !! This Week’s Forecast Clear Skies Seeing 0.4” Some Ash Warm.
FourStar Status Eric Persson (OCIW) Presented By.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Brenna Flaugher October 30, 2007 Preliminary Directors Review 1 Outline This talk will describe progress on DECam since the joint NSF/DOE CD-1 review in.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Brenna Flaugher July 25-27,2006 Directors Review 1 The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Extended Detector Cutoff Considerations WFIRST Project Office May
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Brenna Flaugher July 6, DECam Project Summary Outline –WBS 1.1 Management –WBS 1.2 Focal Plan Detectors –WBS 1.3 Front End Electronics –WBS 1.4.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
DES Review CCD Focal Plane and Camera Roger Smith George Ricker.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Brenna Flaugher for the DES Collaboration; DPF Meeting August 27, 2004 Riverside,CA Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 Dark Energy and.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
Oct. 19, 2006V. Scarpine1 DES Posters to AAS 2007, Seattle 1.Brenna Flaugher – “The Dark Energy Survey instrument” 2.Tom Diehl – “Characterization and.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
LSST Sensor Requirements and Characterization of prototype LSST CCDs V. Radeka, J. Frank, J.C. Geary, D.K. Gilmore, I. Kotov, P. O’Connor, P. Takacs, J.A.
Brenna Flaugher FNAL All Experimenters Meeting June Dark Energy Survey Motivation Dark Energy is the dominant constituent of the Universe Dark Matter.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
SLAC Program Review June 7, 2006 Kirk Gilmore Stanford/SLAC/KIPAC
LSST Camera Detector Status
A Cold SCU Phase-Shifter
Presentation transcript:

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 DES Instrument Project OUTLINE Science and Technical Requirements Instrument Description Cost and Schedule Prime Focus Cage of the Blanco Telescope We plan to replace this and everything inside it

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 2 Science and Technical Requirements 5000 sq-deg in the South Galactic Cap in 30% of 5 years Galaxy cluster catalogs –Complete, simple selection function to z=1, –photometric redshifts to z=1.3 with dz < A small and stable PSF –Seeing < 1.1” FWHM with median < 0.9'' FWHM –PSF stable to 0.1% over a 1 sq- cm (9 sq-arcmin) area –3 sq-degree camera with ≥ 2.2 deg FOV –SDSS g,r,i,z filters covering 400 to 1100nm –Limiting mag of griz =22.8, 23.4, 24.0, 23.6 –QE > 50% in the z band –Photometric calibration to 2%, goal to 1% –Read noise <10 e- –Pixel size <0.3” /pixel –< 0.4” FWHM in the i and z bands The Science Requirements flow to Technical Requirements

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 3 DES Instrument Reference Design 3556 mm 1575 mm Camera Filters Optical Lenses Scroll Shutter The Reference Design represents our current design choices and may change with more analysis CCDs CCD Packaging Front End Electronics CCD Testing Data Aquisition Camera Vessel Cooling Optics Prime Focus Cage Auxiliary Components Assembly and Testing Instrument Construction Organization

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 4 Optics Design 2.2 deg. FOV Corrector –5 powered elements (Fused Silica) –one aspheric surface (C4) four filters – griz needed for DES –others can be used More details of the design in the next talk (Steve Kent) Cost for the glass ~ 660k$ Cost for figuring ~ $1M ~ 1.5 yr delivery Corrector

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 5 CCDs Reference Design: LBNL CCDs –QE> 50% at 1000 nm –2k x 4k –15 micron pixels –250 microns thick –fully depleted (high resistivity) –back illuminated –4 side buttable –readout 250 kpix/sec –2 RO channels/device –readout time ~17sec –fringing eliminated –PSF controlled by bias voltage R&D on LBNL CCDs nearly finished. LBNL CCDs have been used at LICK and on the WIYN Telescope and on the Mayall

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 6 CCD QE and Read noise Read noise for a recently finished DALSA 2k x 4k 250 kHz → 7e- To get redshifts of ~1 we spend ~50% of survey time in z-band. LBNL CCDs are much more efficient in the z band than the current devices in Mosaic II

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 7 CCD Wafers: Existing masks have 2/wafer to be cost efficient we will make new masks with 4/wafer CCD Acquisition Model Reference Design Acquisition Model Order CCDs through LBNL – good relationship with commercial foundry Foundry delivers wafers to LBNL (~650 microns thick) LBNL –applies backside coatings for back illuminated operation –oversees thinning (~ 250 microns thick) and dicing –tests all devices on cold probe station LBNL delivers all tested, unpackaged devices to FNAL FNAL packages and tests CCDs Prepared to package ~ 160 CCDs (spares, yield)

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 8 Packaging CCD Packaging will be done at Fermilab LICK and LBNL have already successfully packaged small quantities. We are developing a working relationship with R. Stover at LICK (we visited in July) to learn packaging techniques CCD Packaging is very similar to building the components of silicon vertex detectors. Fermilab has built many vertex detectors for CDF and D0, and is contributing to CMS CCD packaged at LBNL Invar Foot AlN circuit board Wirebonds to CCD

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 9 Packaging and Testing Process Packaging and testing keep up with anticipated CCD delivery rate of 20/month (5 wafers). Packaging: –one CCD takes ~ 1 week to complete –Plan to have capabilities to start 2/day Testing: –estimate 2 days/CCD –3 identical test stands needed to keep up with 5 CCDs/week LBNL cold probe test results will guide which CCDs to package 1 st Assume 60 good devices from production run and up to 18 good devices from preproduction run

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 10 CCD Test Stand and Acceptance Criteria Testing –linearity, full well depth, QE, CTE, readnoise, dark current Testing and acceptance criteria will be defined as we gain experience with LBNL CCDs Will also consider impact of acceptance criteria on community Multiple tilings reduces impact of bad regions Study with 100 consecutive bad columns found ~1.5% of tiling area was imaged less than 3 times after 5 complete tilings

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 11 Camera Reference Design Focal Plane 62 2k x 4k CCDs for main image, 4-side buttable, 15 micron pixels 8 1k x 1k CCDs for guiding and focus Camera Design Focal Plane feed through board Frontend electronics

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 12 Camera Vessel Vacuum feed through board brings signals out of cryostat Camera is separated into two spool pieces: one for signal feed throughs one for cooling and vacuum services Removal of cooling spool piece allows access to back of focal plane and cables Cooling/ Vacuum spool piece

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 13 Cooling and Integration Reference Design has LN2 reservoir inside cryostat Fill from recondensing dewars on floor investigating alternative: Gifford-McMahon cryo coolers on cooling spool piece which condense N2 directly into reservoir Will fully assemble prime focus cage at FNAL and test all systems together (corrector, focal plane, cooling, data acquisition, data management....) before shipping to Chile

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 14 Front End Electronics and DAQ Large focal plane implies long cables between CCD and electronics crates Reference design has clock drivers and preamps as part of the cable assembly Goals are noise < 5 e-, linearity <0.25%, support a readout rate of 250 kpix/sec Reliable operation requires careful consideration of internal and external components Minimize heat generated in the PF cage by locating DAQ off telescope off the cage

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 15 Data Acquisition DAQ Parameters 62 (+4) 2k x 4k (1k x 1k) kHz (17 s) 971 MB 57 MB/s 4 1k x 1k 2 1 MHz (0.5 s) 8 MB 16 MB/s # CCDs Pixels/CCD Amps/CCD Digitization rate Bytes/image Data rate FE  DAQ Image CCDs Guide CCDs DES data rates are relatively high by astronomy standards, but not for particle physics. We will use the Monsoon data acquisition system, developed by NOAO. We will modify it to separate digital and analog functionality. Using Monsoon shortens development time and enables collaboration with NOAO and other Monsoon users.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 16 DES Modifications: ADCs will reside on the telescope. The rest of the electronics will be off the telescope. Save space and power on the telescope. Reduce noise (ADCs are closer to the CCDs). Save money. Data Acquisition We will modify this part. Monsoon architecture:

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 17 We Can Do This! The Silicon facility at Fermilab has experience building the Run 0, I, & II silicon vertex detectors: °Micron precision assembly ° Wirebonding ° Thermal Management ° Cleanrooms Building a CCD focal plane uses many of the same skills, but has many fewer devices. LBNL has extensive experience with CCD development and packaging for SNAP/JDEM UIUC has experience building large, high rate data acquisition systems at SLAC, Fermilab, and Cornell. U Chicago has experience with optical design and optical systems on SDSS ° DES does not depend on pioneering development work. ° The main issues are cost, schedule, and integration. The DES collaboration has assembled a team of experienced scientists, engineers, designers and technicians

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 18 Schedule Milestones Optics and CCDs are the most Challenging tasks CCDs: Preproduction run: FY05, Production run: FY06 and FY07 Optics: Order glass in FY06, Figuring/polishing in FY07 Fully Commissioned by June 2009!

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 19 Total Cost profile in Then Yr $ (excluding institutional overhead) The Reference Design represents our current choices for meeting the science goals Total cost for the Instrument project is $18.4 M excluding institutional overheads and 22.5M$ with overhead in then year $. We will be ready for observations by June This schedule is funding limited.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 20 Instrument Project Organization

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 21 Conclusions We have a strong collaboration with a wide variety of skills that cover all aspects of this project With this collaboration we can complete the instrument and start survey operations on the telescope in 2009

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 22 Cost and Schedule Choices We have made choices to obtain a profile for costs that is relatively smooth and not obviously unrealistic. The two most expensive items are the CCDs (~$2.2M) and the optics (~$2.6M) We view the CCDs as the most technically challenging with the optics as a close second This schedule for this cost profile proceeds as rapidly as possible with the CCD development and procurements while delaying the procurement of the optics until FY06 and FY07. As a result, the Optics are on the critical path and the CCD schedule has ~ 9 months of slack and contingency This schedule has us fully commissioned on the Blanco by June 2009.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 23 Fully depleted, back-illuminated LBNL CCD 1) Conventional CCD fabricated on thick, high-resistivity silicon substrate 2) Substrate bias voltage used to fully deplete substrate 3) High near-infrared QE and elimination of fringing 4) Control of PSF via thickness and substrate bias voltage 5) P-channel CCD – improved radiation hardness Potential versus depth along center of pixel 1-D potential calculations and Medici simulation

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 24 Cost Estimate breakdown $22.5M inc. overhead Costs in Then Year $ w/o overhead

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 25 Cost Estimate Philosophy Project Cost estimate follows DOE standards The total project cost is derived from a MS project resource loaded schedule (~ 500 lines) Each L3 task is broken down to a lower levels. The M&S cost and Labor is assigned for each task based on quotes (where possible) and experience of engineers and L3 task manager and the PM. A contingency factor is assigned task by task based on uncertainty in the base estimate – typically 40% of the base cost on M&S and 50% on labor Contingency is then calculated for each task and summed to give the total contingency shown in the table. DOE views the contingency as part of the total project cost and insists that it is clearly separated for the base cost estimates as we have shown. History has shown that projects tend to use all of the contingency to complete Usage of Contingency Funds is at the discretion of the project management and director who must follow a formal change control process.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 26 PSF Measurement Operating point 40V Data for 280 μm thick device. x E2V4280 measurement At 40 V, σ diff ~ 7 μm

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 27 Well Depth Requirement is 100 ke. Figure shows 170 ke under some vertical clock condition. This can be tuned for more well depth, eg, below.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 28 Dark Current Scaling is as expected for bulk and surface generation of dark current. Low T deviation could be electronics or thermal photons from dewar. Dark current <10 e/hr/pixel can be routinely achieved at 140 K.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 29 Yield for processed die Short answer, we do not have a well controlled, long history of device characterization. Concentration has been on exploring fabrication parameters and device formats.. DALSA quality – We tested 10 SNAP version 0 devices that were mostly fully processed at DALSA, ie, not thinned. –At least 40% of parts are useful (see table). Differences from proposed production are thinning, LBNL backside processing, and completion of the frontside. –Thinning is industrialized and yields prime wafer surface finish. –Backside process has been in place for 2 years – can batch processing wafers. –Completion of 6” wafer frontside is just beginning with new equipment. Large backlog of parts will give yield; early results indicate excellent quality: cold probing showed 5 of 6 MSL 2k x 4k potentially science grade. In process of executing backside steps on inventoried wafers – more results over next several months. Phase B for DECam provides even more wafers to tune processing. Also, there is work for others scheduled.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 30 SNAP v0 yield study Our best estimate from this is >25% yield for complete frontside processing.

Brenna Flaugher for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 31 CCD Procurement Plans: 4 Phases Sept 2004 to Sept 2005: Phase A - Startup –Learn to operate CCDs –begin packaging and work with R. Stover (LICK) Sept to Oct. 2005: Phase B - Preproduction –new mask with four 2kx4k devices/wafer –24 wafer run at Dalsa –process 2 wafers at LBNL to check masks Oct – May 2006: Phase C - Determine yield –process remaining devices at LBNL –package and test at FNAL Oct – July 07: Phase D – Production run –2 lots of 24 wafers each, assume 20 wafers/lot survive –8 months processing at Dalsa –LBNL produces 20 tested CCDs/month for 12 months July 2006 Phase E – Contingency Run –if Phase C indicates lower than 25% yield, place order for additional wafers