January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.

Slides:



Advertisements
Similar presentations
April 30, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Advertisements

EES: Burn – in test Eliminate infant mortality: Not possible to detect it with AOI, FPT, X-ray or ICT! 1.
June 11, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
October 8, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Marseille 30 January 2013 David Calvo IFIC (CSIC – Universidad de Valencia) CLB: Current status and development on CLBv2 in Valencia.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
February 26, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
August 06, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
July 10, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
May 29, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
December 04, 2013KM3NeT, CLBv2 Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
January 28, 2015CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
August 22, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
DOM INTEGRATION MEETING DAAN VAN EIJK 28 JANUARY 2016.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
BPM stripline acquisition in CLEX Sébastien Vilalte.
July, IFIC (CSIC – Universidad de Valencia) CLB: MULTIBOOT 1.
Receiving 91 PB this week: A little bit more of work load! (We will be for a while production guys :) Test bench separated in two parts: 1.- The PB will.
December 10, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology September 14, 2012KM3NeT, CLBv2 Meeting via EVO KM3NeT CLBv2 1.
29 Oct, 2014 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development.
November 2014, Groningen/Dwingeloo, the Netherlands 3rd International VLBI Technology Workshop Peter Jansweijer Nikhef Amsterdam Electronics- Technology.
LM32 DEVELOPMENTS ONGOING WORK ON TDCs AND OTHER ISSUES (LM32) Diego Real David Calvo CLB group online meeting, 27 March
Genova May 2013 Diego Real – David Calvo IFIC (CSIC – Universidad de Valencia) CLBv2 1.
March 27, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology November 21, 2012KM3NeT, CLBv2 Meeting via EVO KM3NeT CLBv2 1.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
3 Dec, 2013 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development.
Electronics Department Amsterdam 5-July-2010 Sander Mos 1 Status and progress of NIK* Logic WPFL - 5 July 2010 Amsterdam * Network Interface Kit.
CLBv2 issues Diego Real 5 March A SVN repository created for KM3NeT svn+ssh://isvn.ific.uv.es/repos/KM3NeT.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
May 8, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology September 19, 2012KM3NeT, CLB/DAQ Videocon KM3NeT CLBv2 1.
July 31, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
October 29, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
April 10, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
P. Jansweijer Nikhef Amsterdam Electronics- Technology Amsterdam July 5-6, 2010KM3NeT: General WPF/L meeting 1 Measuring time offset over a bidirectional.
Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.
White Rabbit and KM3NeT Peter Jansweijer, on behalf of KM3NeT
Diego Real, IFIC Spain, KM3NeT Electronics Coordinator
AMC13 Project Status E. Hazen - Boston University
DOM acceptance and calibration
WR & KM3NeT Peter Jansweijer
“FPGA shore station demonstrator for KM3NeT”
CLB: Current status and development
KM3NeT CLBv2.
KM3NeT CLBv2.
STANDARD WR STRAW-MAN ARCHITECTURES FOR PHASE II & WRS RELIABILITY
KM3NeT CLBv2.
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Kostas Manolopoulos Tasos Belias
TDR of PMT: Timing issues
PPM-DOM. SPM DOM LCM SS-part ILxx
KM3NeT CLBv2.
MULTIBOOT AND SPI FLASH MEMORY
Commodity Flash ADC-FPGA Based Electronics for an
FEE Electronics progress
Presentation transcript:

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology CLBv2-Proto Status Before proceeding to CLBv2-Proto2… CLBv2 2

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Timing Demo (SPEC-DIO / CLBv2) ◦ White Rabbit 1 ns accurate ◦ See also: Ethernet Demo (Linux PC + Optical Network card / CLBv2) ◦ Ping and basic UDP packet transfer (same as described in Y96CDXsBKivap8j55cWaLbH7mjw/edit) Y96CDXsBKivap8j55cWaLbH7mjw/edit ◦ aap CLBv2_Proto DEMO (Yesterday) 3 PPS

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology White Rabbit Switch Near future: timing and Ethernet 4 PPS 10MHz PPS Use switch as is: ◦ no broadcast (yet) ◦ Standard firmware/software Timing Reference Grand Master Mode

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Determine clock stability Use a proper master clock ◦ external PPS and 10 MHz reference  10 MHz Rubidium standard + KC705 as PPS source “= divide by ” ◦ SPEC in grand master mode ◦ Or WR Swtich-v3… White Rabbit timing 5 Sloppy first order measurement: time between PPS (horizontal 20 ps/div)

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Apart from the listing “KM3NeT_ELEC_2014_001_Doc- Prototype_design_changes_ELEC_draft”KM3NeT_ELEC_2014_001_Doc- Prototype_design_changes_ELEC_draft ◦ Just received a warning possible reset issue with the CDCM61004 (GSI, Stefan Rauch; need to investigate further…) Electrical issues Mechanical issues Before proceeding to CLBv2-Proto2 6

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology 1 Gbit flash issue  BPI flash instead of SPI flash? Determine timing margin  Constraints 125 MHz + 10% = 140 MHz (P&R for XC160T-1 of current design seems successful)  Try Slow-Slew rate to suppress noise? System test  Readout of a complete assembled (½) DOM including PMT’s (needs integrated firmware, embedded & DAQ software, shore station and rudimentary optical network)  Verify:  Throughput  Noise  Form a system test we also learn to setup a proper test procedure  Write a test procedure document  Write test software / Build test equipment EMI  We did our best to have a clock-enable on the Octopus boards to avoid noise on the PMT bases.  How noisy is the CLBv2?  We don’t want to spoil the 24 bit Piezo ADC (a 144 DB signal/noise ratio!)  This may lead to a mechanical issue (reversing component side of the PCB and/or extra shielding) Electrical Issues 7

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Apart from the listing “KM3NeT_ELEC_2014_001_Doc- Prototype_design_changes_ELEC_draft”KM3NeT_ELEC_2014_001_Doc- Prototype_design_changes_ELEC_draft Holes around the FPGA to mount an industry standard heat sink?  choose a proper heat-sink  sort out the mechanical structure Consider alternative SFP location  solve fiber routing issue  try the molex SFP flex rigid, later probably design custom SFP flex rigid to serve our needs. Get rid of the RJ45 connectors (Piezo & Hydrophone)  Piezo is mounted on the octopus board so this is no longer needed on the CLBv2?  Hydrophone only uses two signals “Clk” and “AES_OUT” plus power. Use a smaller connector and remove RS485 (saves money, power and noise?).  How does the hydrophone fit in mechanically anyhow? EMI  Verify readout of a complete assembled DOM including PMT’s (needs integrated firmware, embedded & DAQ software, shore station and rudimentary optical network)  Extra shieling needed? Mechanical Issues 8

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Firmware integration (WRPC, IPMUX, LM32_2 nd, State Machine, TDCs, Hydro, Multi-boot) Embedded software (+ connection to WR embedded software) Rudimentary optical network ◦ one point to point link, 2 SFP’s ◦ Note that the Molex SFP tail must be used since the SFP cage will no longer be accessible once the DOM is assembled Rudimentary shore station (one WR switch V3) DAQ software As least 19 PMT’s and bases 1 Octopus large, 1 Octopus small Piezo, Hydrophone, Nano beacon, AHRS ½ DOM integration Test & learn! Roadmap towards CLBv2-Proto2 9

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology There must be knowledge transfer from 7- Solutions to the collaboration. To my opinion, the best way to do this is to repeated the 7-solutions work at different locations: 1.All partners gain knowledge (including 7- Solutions) 2.We have multiple test sites My first step towards this is to use a WR switch as is and later change firmware/software… General remark 10

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Questions? Discussion… 11

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Backup Slides More details… 12

January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology Clocking 13 Phase Compensated Clocks