Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.

Slides:



Advertisements
Similar presentations
3D Printing Change this title.
Advertisements

CALICE - European DHCAL meeting Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo Alamillo.
C4 – Rapid Prototype Manufacture
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
MIG Welding By: Jared McCombs and Vinnie DiBlasi
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
X Meeting of the Future Linear Colliders Spanish Network10-Feb-2014 Enrique Calvo Alamillo.
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
COLORS OF THE SUN Spectroscopy Activity
Vacuum tests on scintillating fibres. Table of content The Aim of the vacuum tests on the scintillating fibre plane Equipments used in the vacuum tests.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 December 2013 LAV construction & installation status.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
LIGHT SHADOW AND REFLECTION
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
LAV damage and repair – M. Moulson (Frascati) – Photon Veto WG – CERN – 5 April 2011 Damage to A3 during transport 2 10 blocks were broken during transport.
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 14 December 2010.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Tungsten plates on the market in 2010 ( Plansee – Cime Bocuze ) Pure W – W Composite Production Process Available Products Mechanical and Magnetic Properties.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 2 Departure for CERN 24/07 with delivery originally.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
Workshop How to make a PCB
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
w w w. z a n e e n. c o m z a n e e z a n e e n. c o m Ring Inox (Stainless Steel) Decorative D8 Volume Feature Product:
Pinhole Camera.
LAV HV repair plans Matthew Moulson
Some Design Considerations and R &D of CEPCB Dipole Magnet
NA62 LAV Anti1 REMOVAL & TESTS
new straw end plug: D=10.6 mm straws support frame Levan option
SC1R Insulation Strategy
Presentation transcript:

Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 At a glance: Where we stand 2

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June A10 construction delays Last meeting: Delivery of A10 vessel delayed to 20 June 2 months delay due to welding tests for A9 More difficult to lathe stainless steel than originally foreseen Delay to 20 June → unlikely to finish before August shutdown A9 transport scheduled for week of 10 June Meeting at Fantini 15 May: Delivery further delayed to 12 July Bottleneck from backup of work for Zayer (large CNC milling machine) Work on A10 suspended from 31 May to 10 June before cutting manhole & nozzles We can afford to be generous goal of finishing before August won’t be met in any case Relax A9 transport schedule to week of 18 June Vacuum test week of 3 June Survey week of 10 June

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June A10 delivery status Suspension of work on A10 31 May – 10 June

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 A12 construction techniques 5 Experimenting with techniques and tools for A12 construction Very likely that blocks will be installed directly into rings No pre-assembled bananas as for A1-11 Experimentation with sling + overhead crane for block manipulation Use this technique instead of lift table? Possible to install last block in ring with this technique?

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 A12 construction techniques 6 With care, sling can be used to install last block in plane into hole with blocks on both sides.

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 A12 construction techniques 7 Important considerations: Cabling scheme – necessary to specify final cable length Wrapping material and technique Completed A12 prototype in laboratory

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Notes on wrapping for A12 8 A12 wrapping must: Provide light tightness for operation in ambient light Present a (diffusively) reflective surface to interior of glass Separate black and white wrappings can be used if necessary, but a single laminate would be a simpler solution Be resilient against scuffs and tears Be able to be folded around the block Usually means the material has to be thin Be able to be laser cut, ideally Commercial solution: dyMat T (Coveme, Italy) 37.5 μm black PVF + 75 μm PET μm white PVF Not halogen free, requires a safety derogation Good opacity Effectiveness of 37.5 μm black PVF (Tedlar) well established Reasonable price: 810 mm x 100 m roll = 81 m 2 ~ €700 Total thickness ~175 μm: Somewhat difficult to crease, but possible

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Validation of wrapping material 9 Try to wrap a block using A4-size samples Initial observations: Bad idea to try to tape together A4 sheets to do this Photo tape will never work – need derogation request for PVC tape Try to measure count rates with oven (scaler_main) and oscilloscope, with various lights shining on block About 300 Hz with 6 mV threshold (oven), but not highly reproducible Dark rate in closed oven ~ 1-3 Hz Conclusion: material is probably sufficiently light tight, but need to develop high-quality, reproducible wrapping procedure

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Wrapping material: Other considerations 10 Current status: Verified that material can be laser cut Some heat-introduced distortion at edges for small (slow) cuts, but material does not burn or delaminate Ordered 2m sample cut from roll to develop wrapping technique Next steps: Try to wrap a block with new samples, fewer seams Compare count rates to block with original OPAL wrapping Need to develop test stand for light-tightness tests in production Can probably adapt oven for this purpose Need a standard source of illumination Need to develop block-processing techniques with a mind to minimizing scuffs and tears Will almost certainly need to provide an additional layer of light tightness by closing or draping the A12 volume