24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.

Slides:



Advertisements
Similar presentations
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
20-Jan-09 Madrid, Spain Global Design Effort 1 Barry Barish Madrid, Spain 20-Jan-09 Designing the ILC ATF-2 Final Doublet System.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
17-April-09 TILC09 Global Design Effort 1 Barry Barish TILC09 – Tsukuba, Japan 17-April-09 ILC / GDE Report Electron Cloud at CesrTA.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Towards an International Linear Collider Barry Barish Caltech / GDE 25-July-07.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
The International Linear Collider and the Future of Accelerator-based Particle Physics Barry Barish Caltech Lomonosov Conference 20-Aug-2015 ILC.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
1-Feb-08 P5 Global Design Effort 1 GDE - ILC Barry Barish P5 Meeting - Fermilab 1-Feb-08.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
14-Nov-11 PAC - Prague Global Design Effort 1 Barry Barish PAC - Prague 14-Nov-11 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Status of the ILC Brian Foster (Oxford & GDE) PECFA Meeting CERN 27/11/09.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
25-Sept-07 P5 Fermilab Global Design Effort 1 Report from GDE Barry Barish Caltech / GDE 25-Sept-07.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Barry Barish KILC12 Daegu, Korea 23-April-12 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler Global Design Effort 1 23-April-12.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
OLAV-III 1 Barry Barish OLAV-III Oak Ridge National Laboratory 12-July-11 The International Linear Collider A TeV Scale Lepton Collider 12-Julyl-11.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Barry Barish LCWS12 Arlington, TX 22-Oct-12 ILC – Status, TDR and Costs Global Design Effort 1 22-Oct-12 LCWS12 - Arlington, TX TDR Part I: R&D TDR Part.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Barry C Barish – Caltech Tohoku Forum for Creativity Particle Physics and Cosmology after the discovery of the Higgs Boson October 2013 The Future.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
AAP Review Oxford, January Introduction to SB2009 Nick Walker Marc Ross Akira Yamamoto.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
CLIC work program and milestones
ILC - Upgrades Nick Walker – 100th meeting
Barry Barish LCWS10 - Beijing 26-March-10
Measurements, ideas, curiosities
Yasuhiro Okada, Executive Director, KEK
Barry Barish LCWS10 - Beijing 26-March-10
Nick Walker for the Project Management
Barry Barish JSPS - Sendai 12-Sept-11
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
DR Session Introduction
Presentation transcript:

24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort

24-July-10 ICHEP-10 Paris Global Design Effort 2 The linear collider will measure the spin of any Higgs it can produce by measuring the energy dependence from threshold Linear Collider – Higgs Physics Measure the quantum numbers. The Higgs must have spin zero !

24-July-10 ICHEP-10 Paris Global Design Effort 3 Precision measurements of Higgs coupling Higgs Coupling strength is proportional to Mass Linear Collider – Higgs Physics

24-July-10 ICHEP-10 Paris Global Design Effort 4 determine the underlying model SM 2HDM/MSSM Yamashita et al Zivkovic et al Linear Collider – Higgs Physics

24-July-10 ICHEP-10 Paris Global Design Effort 5 RDR Complete Reference Design Report (4 volumes) Executive Summary Physics at the ILC Accelerator Detectors

24-July-10 ICHEP-10 Paris Global Design Effort 6 RDR Design Parameters Max. Center-of-mass energy500GeV Peak Luminosity~2x /cm 2 s Beam Current9.0mA Repetition rate5Hz Average accelerating gradient31.5MV/m Beam pulse length0.95ms Total Site Length31km Total AC Power Consumption~230MW

24-July-10 ICHEP-10 Paris Global Design Effort 7 7 Major R&D Goals for Technical Design Accelerator Design and Integration (AD&I) Studies of possible cost reduction designs and strategies for consideration in a re-baseline in 2010 SCRF High Gradient R&D - globally coordinated program to demonstrate gradient by 2010 with 50%yield; ATF-2 at KEK Demonstrate Fast Kicker performance and Final Focus Design Electron Cloud Mitigation – (CesrTA) Electron Cloud tests at Cornell to establish mitigation and verify one damping ring is sufficient.

24-July-10 ICHEP-10 Paris Global Design Effort 8 Why change from RDR design? Timescale of ILC demands we continually update the technologies and evolve the design to be prepared to build the most forward looking machine at the time of construction. Our next big milestone – the technical design (TDR) at end of 2012 should be as much as possible a “construction project ready” design with crucial R&D demonstrations complete and design optimised for performance to cost to risk. Cost containment vs RDR costs is a crucial element. (Must identify costs savings that will compensate cost growth)

24-July-10 ICHEP-10 Paris Global Design Effort 9 9 Five Themes to Develop >2012 Remains special case Project Implementation Plan Industrialisation in-kind contribution models Site requirements Project Schedule Remaining Technical activities

24-July-10 ICHEP-10 Paris Global Design Effort 10 Technical Design Phase and Beyond AD&I studies RDR Alternate concepts R&D Demonstrations TDP Baseline Technical Design RDR Baseline Beijing Workshop TDR TDP-1 TDP-2 Change Request SB2009 evolve change control process AAP PAC Physics CERN Workshop

24-July-10 ICHEP-10 Paris Global Design Effort 11 Proposed Design changes for TDR RDRSB2009 Single Tunnel for main linac Move positron source to end of linac *** Reduce number of bunches factor of two (lower power) ** Reduce size of damping rings (3.2km) Integrate central region Single stage bunch compressor

24-July-10 ICHEP-10 Paris Global Design Effort m Diameter Single Tunnel Egress passageway not needed; 7 m Ø ok

24-July-10 ICHEP-10 Paris Global Design Effort 13 Critical technical challenge for one-tunnel option is the high level RF distribution. Two proposed solutions : –Distributed RF Source (DRFS) Small 750kW klystrons/modulators in tunnel One klystron per four cavities ~1880 klystrons per linac Challenge is cost and reliability –Klystron Cluster Scheme (KCS) RDR-like 10 MW Klystrons/modulators on surface Surface building & shafts every ~2 km Challenge is novel high-powered RF components (needs R&D) 7.5 m Diameter Single Tunnel High-Level RF Solution

24-July-10 ICHEP-10 Paris Global Design Effort 14 The ILC SCRF Cavity - Achieve high gradient (35MV/m); develop multiple vendors; make cost effective, etc - Focus is on high gradient; production yields; cryogenic losses; radiation; system performance

24-July-10 ICHEP-10 Paris Global Design Effort 15

24-July-10 ICHEP-10 Paris Global Design Effort 16

24-July-10 ICHEP-10 Paris Global Design Effort 17

24-July-10 ICHEP-10 Paris Global Design Effort 18

24-July-10 ICHEP-10 Paris Global Design Effort 19 Cornell E Cloud Studies

24-July-10 ICHEP-10 Paris Global Design Effort 20

24-July-10 ICHEP-10 Paris Global Design Effort 21 Interaction Region (old location) Break point for push-pull disconnect Provide reliable collisions of 5nm-small beams, with acceptable level of background, and be able to rapidly and efficiently exchange ~10kT detectors in a push-pull operation several times per year

24-July-10 ICHEP-10 Paris Global Design Effort 22 Push – Pull Detector Concept Vibration stability will be one of the major criteria in eventual selection of a motion system design Both detectors without platformsBoth detectors with platforms

24-July-10 ICHEP-10 Paris Global Design Effort 23 Global Design Effort 23 Timescales: TDR to ILC (or beyond 2012) Steps to a Project – Technical (2-3 years) –R&D for Risk Reduction and Technology Improvement –Systems Tests (e.g. S2 completion – ILC-like beam tests) –Engineering Design –Industrialization Project Implementation –Government Agreements for International Partnership –Siting and site-dependent design –Governance Time to Construct –5-6 years construction –2 years commissioning Project Proposal / Decision keyed to LHC results ILC Could be doing physics by early to mid- 2020s

24-July-10 ICHEP-10 Paris Global Design Effort 24 Final Remarks ILC accelerator R&D and design evolution is on track for Technical Design Report at end of This will be accompanied a Project Implementation Plan Planning for ILC development beyond 2012 is very important. It will be very difficult to maintain viable support until a decision will be made. LHC will open the TeV energy frontier and the resulting physics will point our way to the future ---- (Linear Collider or ???). We are preparing to make the ILC option as a viable and well prepared and understood option.