The Situation in Japan Yasuhiro Okada, Executive Director, KEK ILD meeting 2014 September 7, 2014, Oshu-city, Iwate, Japan 1.

Slides:



Advertisements
Similar presentations
ILD Resource Survey 2014/9/9 Y. Sugimoto 1. Committee under MEXT ILC Task Force in MEXT Academic experts committee Particle-Nuclear physics WG Members.
Advertisements

Manpower and space requirements for ILD 2015/1/13 Y. meeting at SLAC 1.
CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE Copyright ©2013 EuroGeographics UN-GGIM Europe 12 June.
Chubaka Producciones Presenta :.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Department of Energy Office of Science Report from DOE Office of High Energy Physics Report from DOE Office of High Energy Physics Dr. Robin Staffin Associate.
SunMonTueWedThuFriSat January SMTWTFS
Current Status of ILC Project Keisuke Fujii, KEK May 9, 2015.
ECFA LCWS 26 May 2013 DESY Sachio Komamiya The University of Tokyo 1 26 May 2013 DESY Hamburg Linear Collider Board (LCB) Report.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Atsuto Suzuki. 2 Japan Policy Council Second Recommendations: Regional Development through Creation of Global Country inside Japan Realizing a global.
LCB/ICFA meeting at Newport News with full snow, February This is only for TB meeting Presentation and not for Distribution. ( )
Linear Collider Collaboration Status L. Evans 1LCWS Tokyo 11 th November 2013.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
ILC Status in Japan (II) Yasuhiro Okada Executive Director, KEK Asian Linear Collider Workshop 2015 April 21, 2015, KEK, Japan 1.
ILC, FCC and the landscape of future colliders 121 April 2015Interactions meeting Toyama.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
LCC Physics&Detector Report Hitoshi Yamamoto SiD Meeting Jan,
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
Hitoshi Yamamoto, 15-Mar-2013, ILC detector monthly meeting, KEK 1 Detector Introduction.
CERN Strategy Group WS at Zeuthen Input from Japan Mitsuaki NOZAKI (KEK)
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
ILC Accelerator Status Lyn Evans, CERN, Imperial College London 1A. Yamamoto, LCB ILC Acc. Status.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Tokyo 10/11/2004 ATSEP training & license: the way forward.
Japanese Affairs Presentation 王雯 Do You Want To Go Abroad ?
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
LCWS13 Tokyo. Mr. Kawamura’s Talk Text (in English) – Can be downloaded from the workshop home page Please use today’s version Highlights – We are aware.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Assignments: -Writing practice prompt due THUR. -Quiz signed.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Hitoshi Yamamoto, 2-Oct Detector Tohoku Forum for Creativity - a Pilot Program - ‘Particle Physics and Cosmology after the Discovery of the Higgs.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
The Status of the ILC Project in Japan
The Status of the ILC Project in Japan
LCC L. Evans, Santander, 2nd June 2016
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
ICFA Report to C11 August 2016 to August 2017 J. Mnich (DESY)
ILC project Status Yasuhiro Okada (KEK) ILC detector meeting
ILC Status in Japan ECFALC M.Yamauchi KEK June 02, 2016
ILC Decision Timeline in Japan (KEK/JAHEP) and Asian LC overview
Introduction to the Workshop
Annual ILC detector meeting K. Kawagoe (Kyushu)
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
FALC report and KEK’s plan for the ILC
Yasuhiro Okada, Executive Director, KEK
McDonald’s calendar 2007.
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Too製 カレンダーファクトリー 卓上ミニ・マット紙 ハガキ(IJCAK-15H など)に印刷してお使いください。
ICFA Report to FALC June to November 2015 J. Mnich (DESY)
McDonald’s calendar 2007.
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
2015 January February March April May June July August September
Presentation transcript:

The Situation in Japan Yasuhiro Okada, Executive Director, KEK ILD meeting 2014 September 7, 2014, Oshu-city, Iwate, Japan 1

ILC Time Line: Progress and Prospect Expecting ~ (3+2) year since (middle) Preparation Phase We are here, 2014 A. Yamamoto, 2014/05/12 AWLC14

August, 2013 September 26, 2013 TDR September 28, 2013 February 6, 2014 A.Suzuki, May 2014 Site 3

Establish ILC Pre- J-Lab. February 6, 2014 ILC preparatory office in KEK: The ILC preparatory office in KEK takes a lead of the ILC related activities formally for a while, instead of the government. Once the government makes a decision on hosting the ILC in Japan, the ILC preparatory office should evolve into the global system, inviting the LCC and LCB.

Report on the International Linear Collider Project Science Council of Japan September

Review by Science Council of Japan Task Force Particle ・ Nuclear Physics WG Academic Experts Committee TDR Validation WG February 6, 2014 May 8, 2014 MEXT TDR Validation Value Estimation for Quake-Proof Value Estimation for Environmental Improvement Total Value Estimation Clarification of ILC Physics Review Issues 6

construction Further Action Plan before Construction Action Plan toward before Construction in 2014 Action Plan toward before Construction in

Engineering R&D Schedule (LCC-PreLab) by A. Yamamoto 8

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Further Action Plan before Construction 9

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Further Action Plan before Construction 10

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Organization, Structure (LCB, LCC) LCB WG (Feb ~ ) PIP & PDG Further Action Plan before Construction CERN EU XFEL Procurement Legal Base Personnel ITAR ILC ITER 11

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Organization, Structure (LCB, LCC) MEXT Task Force (LCC-PreLab) Further Action Plan before Construction Review by Science Council of Japan 12

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Management, Structure (LCB, LCC) MEXT Validation (LCC-PreLab) Full Proposal (LCB-LCC-PreLab) ConstructionStart Action Plan before Construction 13

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Management, Structure (LCB, LCC) MEXT Validation (LCC-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making to Governments Full Proposal (LCB-LCC-PreLab) Further Action Plan before Construction ConstructionStart 14

Site-Dependent Value (LCC-LCB-PreLab) Governmental Negotiation Preparatory JYen/Euro TDR Value Estimation Action Plan before Construction 15

Site-Dependent Value (LCC-LCB-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making Value-Sharing Model HostOthers CFS - LAND??? % Instrument - Electricity??? % Maintenance/Labor??? % Detector??? % Action Plan before Construction 16

Site-Dependent Value (LCC-LCB-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making Value-Sharing Model Diplomacy of Diet Members’ Caucus Action Plan before Construction 17

2nd Meeting in July,

The ILC is a global project, to be designed and realized by a worldwide cooperation of scientists and engineers. In Japan, for the first time ever, the government has allocated a budget for the coming Japanese fiscal year to investigate and examine the ILC project itself, which is in addition to the existing funding for the research and development. This has great significance in that the Japanese government has shown a vital interest in the ILC project. We have reached the stage where we must now work together with other governments for the realization of the ILC. The Japanese government intends to perform concentrated investigations and address the major issues and arrive at a conclusion about hosting the ILC by the end of JFY2015. January 8,

Conversation on ILC between MEXT Minister Mr. Hakubun Shimomura and DOE Secretary Dr. Ernest Moniz モニーツ米国エネルギー省長官を訪問 し、国際リニアコライダー計画などに ついての会談を行いました。 米国エネルギー省のモニーツ長官と 会談しました。原子力、核セキュリ ティや国際リニアコライダー計画な どにていて意見交換しました。【秘 書投稿】 From Mr. Simomura’s HP January 9, 2014 April 28, 2014 A letter to reiterate the conversation regarding the ILC project in Japan was sent from Mr. Shimomura to Dr. Moniz in February

May 2014 Letter Letter from to CERN DG EU Government June 2014 Meeting : France-Japan Friendship Diet Members’ Caucus in Tokyo October 2012 March 2013 April 2014 Lyn Brian Harry 21

July 2014 Meeting : US-Japan Friendship Diet Members’ Caucus in Washington 22

Summary ①②③④⑤⑥⑦⑧⑨①②③④⑤⑥⑦⑧⑨ Action Plan before Construction Site-Dependent Value (LCC-PreLab) 23