Stuart Henderson Associate Laboratory Director for Accelerators Fermilab HiLumi LHC-LARP Meeting, Nov 11-15, 2013 The US Effort for High Luminosity LHC.

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

Position of the Czech Republic on the European Strategy in Particle Physics Current main activities in particle physics * Plans for the future Recommendations.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
R. Carcagno - HL-LHC Standards and Best Practices Workshop June 2014 USA Contributions to the HL-LHC Upgrade Ruben Carcagno US HL-LHC Project Engineer.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
Eric Prebys, FNAL Snowmass 2013 Community Planning Meeting Fermilab, October 11-13, 2012 Minneapolis.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
P5 Meeting - Jan , US LHC The Role of the LHC in US HEP Dan Green US CMS Program Manager January 28, 2003.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
CERN Report (II) Rolf-Dieter Heuer ECFA Meeting Frascati 1 July
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Eric Prebys LARP Program Director January 14, 2009.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
Overview of US Activities toward a Future Circular Collider Stuart Henderson FCC Kickoff Meeting February 12, 2014 Thanks to Vladimir Shiltsev, Giorgio.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
LHC Science Goals & Objectives
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Input to Strategy currently planned
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
LARP Role in Plans for HL-LHC Upgrades Giorgio Apollinari - US LARP Director USLUO, UW Madison – November 6th- 8th, 2013.
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Introduction to Jefferson Lab
Presentation transcript:

Stuart Henderson Associate Laboratory Director for Accelerators Fermilab HiLumi LHC-LARP Meeting, Nov 11-15, 2013 The US Effort for High Luminosity LHC

HL-LHC/LARP, Daresbury – S. Henderson US Context The US HEP Community plays a substantial role in the scientific productivity of the LHC Substantial US involvement in the construction of detectors and the accelerator – The US contributed $164 million to the construction of the ATLAS detector and $167 million to the construction of the CMS detector. – The US contributed $200 million to the construction of the Large Hadron Collider.

HL-LHC/LARP, Daresbury – S. Henderson US Context Approximately 2,000 scientists, students, engineers and technicians from 96 US institutions participate in the LHC. – 23 percent of the ATLAS collaboration members come from American institutions – 33 percent of the CMS collaboration members come from American institutions. – Since 2008, the work on the ATLAS and CMS experiments resulted in about 230 doctorate degrees for US students. The United States provides 23 percent of the computing power for the ATLAS experiment and 40 percent of the computing power for the CMS experiment.

HL-LHC/LARP, Daresbury – S. Henderson US Planning Activities Department of Energy Scientific Facilities “Snowmass” Community Summer Study Particle Physics Project Prioritization Panel (P5)

HL-LHC/LARP, Daresbury – S. Henderson DOE/HEPAP Facilities Subpanel Report Facilities Subpanel considered large scale scientific user facilities for High Energy Physics Regarding Energy Frontier Facilities: LHC Upgrades Science questions drive the need to upgrade luminosity and detectors at the LHC – Accelerator and upgrades of both detectors are absolutely central to world-wide goals of particle physics Proposed US roles in accelerator and detector upgrades are compatible with US leadership areas, although actual roles have yet to be determined Contributions to both ATLAS and CMS upgrades are essential to maintain ongoing US participation

HL-LHC/LARP, Daresbury – S. Henderson Snowmass: The Higgs Chip Brock, Snowmass Energy Frontier Report

HL-LHC/LARP, Daresbury – S. Henderson Snowmass: LHC Upgrades (excerpted from “Snowmass 2013 Energy Frontier Working Group Report – HEPAP Sept. 5, 2013)

HL-LHC/LARP, Daresbury – S. Henderson Snowmass Report (excerpted from “Planning the Future of U.S. Particle Physics, Report of the 2013 Community Summer Study”) We find the case for the high-luminosity stage of the LHC compelling. – This plan to deliver 3000 fb-1 has been listed in the European Strategy for Particle Physics as the highest priority accelerator project in Europe for the 2020's. – We find that it will provide a significant additional step in the search for new particles, and that it will provide other important capabilities. – The most important of these is the beginning of the era of precision Higgs boson measurements, to few-percent precision. – It is likely to give the first evidence of the Higgs boson self-coupling. – It will provide a program of precision measurement in the SM that will dramatically tighten our knowledge of the W boson and the top quark, with measurements sensitive to the predictions of a variety of new physics models. We have already noted that the additional luminosity will significantly enhance the capability of the LHC to search for new heavy particles.

HL-LHC/LARP, Daresbury – S. Henderson Particle Physics Project Prioritization Panel (P5) Charge The P5 Process has just begun, and is expected to answer the following charge by the Spring: 9 “…develop an updated strategic plan for U.S. HEP that can be executed over a 10 year timescale, in the context of a 20-year global vision for the field.” “…examine current, planned, and proposed US research capabilities and assess their role and potential for scientific advancement; assess their uniqueness and relative scientific impact in the international context; and estimate the time and resources (the facilities, personnel, research and development and capital investments) needed to achieve their goals.”

HL-LHC/LARP, Daresbury – S. Henderson P5 Charge “Your report should provide recommendations on the priorities for an optimized high energy physics program over the next ten years (FY14-23), under…three scenarios.” “The report should provide a detailed perspective on whether and how the pursuit of possible major international partnerships (such as LHC upgrades, Japanese-hosted ILC, LBNE, etc.) might fit into the program you recommend in each of the scenarios.” 10

HL-LHC/LARP, Daresbury – S. Henderson Potential US (Accelerator) Involvement in High Luminosity LHC

HL-LHC/LARP, Daresbury – S. Henderson LHC Accelerator Research Program (LARP) History & Evolution The US LHC Accelerator Research Program (LARP) was formed in 2003 to coordinate US R&D related to the LHC accelerator and injector chain – partnership of Brookhaven Lab, Lawrence Berkeley Lab and Fermilab – SLAC joined shortly thereafter – Has also had some involvement from Jefferson Lab, Old Dominion University and UT Austin LARP contributed to the initial operation of the LHC, but much of the program has been focused on future upgrades The program is currently funded at a level of about $12-13M/year, divided among: – Magnet research (~half of program) – Accelerator research (Crab cavities, WBFS, Collimators, e-hollow lens,..) – Programmatic activities, including support for personnel at CERN Recent Evolution (2012 onward) – Initial convergence on deliverables for HL-LHC – Program now transitioning to a project-approach – Giorgio Apollinari has taken the lead as LARP Director 12

HL-LHC/LARP, Daresbury – S. Henderson Potential US Involvement in HL-LHC: A Preliminary Look Several candidate scope elements have been under development –150 mm aperture Nb 3 Sn quadrupoles –Crab Cavities –High Bandwidth Feedback System –Collimation and hollow e-beams –11 T Nb 3 Sn dipoles –Large Aperture NbTi D2 separator magnets Process of convergence among CERN-DOE-U.S. Labs-LARP initiated in Dec ‘2012 Initial consensus on core Priorities which makes good use of US accelerator expertise, and which makes critical contributions to LHC luminosity: –Committed to a major stake in Nb 3 Sn quads –Crab cavities up to the SPS test and possibly beyond to production –High bandwidth feedback was seen as a high impact contribution for modest resources. Back up options: –11 T dipoles Proper “hand-off” if not continued in US –Hollow electron beams for halo removal Support some modest R&D into this effort in the event that circumstances allow its inclusion Lower priority: –There was not much interest in pursuing the D2 separators. 13

HL-LHC/LARP, Daresbury – S. Henderson Quads for inner Triplets – Decision 2012 for low-β quads Aperture  150 mm – 140 T/m – B peak ≈12.3 T, LHC: 8T, 70 mm More focus strength, –  * as low as 15 cm – LHC: 55 cm Dipoles for beam recombination/separation: – capable of 6-8 T with mm aperture (LHC: 1.8 T, 70 mm) Dipoles 11 T for LS2 (presently not part of plans as a US deliverable) Increase Luminosity: High Field SC Magnets

HL-LHC/LARP, Daresbury – S. Henderson 15 HL-LHC Nb 3 Sn Magnets Interaction Region Magnets – 4 Q1 and 4 Q3 (2 per IR) plus 1 spare each from US Q1 and Q3 will probably contain 2 ~4.5 m long magnets each, for a total of ~20 quadrupoles – 4 Q2a and 4 Q2b from CERN Option still open on the length of Q2. E. Todesco

HL-LHC/LARP, Daresbury – S. Henderson LARP Magnet Development Tree SQ Series: 19 coils, T SQ02: 54/61 MJR J c > % at 4.3/4.5 K 97% at 1.8 K High Field Quadrupole SQXF/LQXF 1 m / 4 m long 150 mm bore TQ Series: 33 coils, T TSQ02: 54/61 RRP J c > % to 97% at K TQS03: 108/127 RRP J c > % at 4.3 K 93% at 1.9 K US SQXF Series: 13/18 Coils 2 or 3 1m long models US LQXF Series: 18 Coils, 3 ~4.3 m Long Models LR Series: xx coils, ~12 T LRS02: 54/61 RRP J c > % at 4.5 K LQ Series: 19 coils, ~12 T LSQ01: 54/61 RRP J c > % at 4.5 K Marginal Increase at lower T LQS03: 108/127 RRP J c > % at 4.6 K No increase at lower T HQ Series: 25 coils, T HQ01e: 54/61 and 108/127 RRP 85% at 4.5 K No Increase at lower T HQ02: 108/127 RRP J c > % at 4.5 K Not fully trained at lower T

HL-LHC/LARP, Daresbury – S. Henderson LARP Quadrupole Magnet Development SQ SM TQS LQS-4m HQ Very Preliminary !

HL-LHC/LARP, Daresbury – S. Henderson LQS01a: 202 T/m at 1.9 K LQS01b: 222 T/m at 4.6 K 227 T/m at 1.9 K LQS01a: 202 T/m at 1.9 K LQS01b: 222 T/m at 4.6 K 227 T/m at 1.9 K LQS02: 198 T/m at 4.6 K 150 A/s 208 T/m at 1.9 K 150 A/s limited by one coil LQS02: 198 T/m at 4.6 K 150 A/s 208 T/m at 1.9 K 150 A/s limited by one coil LQS03: 208 T/m at 4.6 K 210 T/m at 1.9 K 1 st quench: 86% s.s. limit LQS03: 208 T/m at 4.6 K 210 T/m at 1.9 K 1 st quench: 86% s.s. limit 3.3 m coils, 90 mm aperture Goal: 200 T/m at 1.9 K 3.3 m coils, 90 mm aperture Goal: 200 T/m at 1.9 K Long Magnets: LQS of LARP

HL-LHC/LARP, Daresbury – S. Henderson Evolution of the Magnet Plan Original plan – Follow HQ with 4m x 120 mm LHQ – Use this to demonstrate technology for 120 mm prototype as part of large scale construction project Recent Developments – In June 2012, CERN chose 150 mm as the aperture for the HL-LHC – July 2012 LARP review recommends abandoning LHQ to pursue 150 mm prototype New plan – Curtail 120 mm program to long ¼ magnet “mirror” tests We feel there are still important things to learn – Begin working with CERN on 150 mm prototype as part of an integrated production plan for Nb 3 Sn quads in LS3. 19

HL-LHC/LARP, Daresbury – S. Henderson Crab Cavities Technical Challenges – Crab cavities have only barely been shown to work. Never in hadron machines – LHC bunch length requires low frequency (400 MHz) – 19.4 cm beam separation needs “compact” (exotic) design Additional benefit – Crab cavities are an easy way to level luminosity! Currently aiming for: – Down-select ~next year – Aiming for SPS test in LARPUK Without some compensation for crossing angle, Reducing the  * will only increase luminosity by ~75% ! “Piwinski Angle”

HL-LHC/LARP, Daresbury – S. Henderson Crab Cavities and Cryomodules UK Concept BNL Concept DQWR prototype 17-Jan-2013 RF-Dipole Nb prototype

HL-LHC/LARP, Daresbury – S. Henderson First test of CC (ODU-SLAC at J-LAB)

HL-LHC/LARP, Daresbury – S. Henderson High Bandwidth Feedback System The high bandwidth feedback system is a proposed feedback system for the SPS, which leverages LARP experience with the LHC LLRF system, to address intra-bunch instabilities Proposal –LARP will continue R&D related to the system. –The deliverable would be a functional feedback system the SPS, for which The US contribution would be the complete, full-function, instability control system hardware, firmware and software necessary to operate at the SPS (and potentially LHC, PS). The CERN contribution will include the vacuum structures (pickup(s) and kicker(s)) and all tunnel related cable plant. 23

HL-LHC/LARP, Daresbury – S. Henderson 11 T Development Create space for additional collimators by replacing 8.33 T MB with 11 T Nb 3 Sn dipoles compatible with LHC lattice and main systems. – kA (in series with MB) At this time not proposed as a US in-kind contribution. Intellectually relevant as R&D program toward high field, accelerator quality, dipoles and, consequently, HE-LHC 24 Not LARP

HL-LHC/LARP, Daresbury – S. Henderson Single aperture model Twin aperture model 11T Dipole R&D Success ! Second Nb 3 Sn Accelerator Quality Dipole (1m long) – Dec ‘12 Not LARP

HL-LHC/LARP, Daresbury – S. Henderson Summary The importance of the High Luminosity LHC Physics potential has been recognized in ongoing US Planning activities The assessment of the P5 Panel will be an important element in establishing the scale of US involvement in HL- LHC LARP is focusing on the Development of technology which is critical to increasing the luminosity of the LHC LARP has laid the groundwork for critical contributions in Nb3Sn magnet technology for IR quadrupoles LARP is developed crab cavity and feedback systems The US community is committed to realizing the full potential of the Large Hadron Collider

HL-LHC/LARP, Daresbury – S. Henderson

11 T Nb 3 Sn Create space for additional collimators by replacing 8.33 T MB with 11 T Nb 3 Sn dipoles compatible with LHC lattice and main systems kA (in series with MB) MB.B8R/L MB.B11R/L 5.5 m Nb 3 Sn 3 m Collim 5.5 m Nb 3 Sn 3 m Collim Focus of joint R&D program aimed at Accelerator Quality Magnets between CERN and US. R&D program to be completed in US with conclusion of Short (1m) Models. 15,66 m LS2 : IR-2 – 4 MB => 8 x 5.5 m CM + spares LS3 : IR-1,5 and Point-3,7 – 4 x 4 MB => 32 x 5.5 m CM + spares Collimators and 11T Dipoles