CJK#20 B3G-WG CCSA Wang Li Evaluation Schedule for CJK EVAL SIG.

Slides:



Advertisements
Similar presentations
Status of Channel Models IEEE WG Session #7 March 15-19, 2004 Qiang Guo Editor, Channel Modeling Correspondence Group C /30.
Advertisements

IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Doc.: IEEE /0272r0 Submission February 2011 Ron Porat, Broadcom Outdoor Path Loss Models for ah Date: Authors: Slide 1.
Submission doc.: IEEE 11-15/613r0 May 2015 Chinghwa Yu et al, MediaTek Inc.Slide 1 Box 5 Calibration Result Date: Authors:
Doc.: IEEE /1187r1Sep 2014 Submission Po-Kai Huang (Intel) Slide 1 The Effect of Preamble Error Model on MAC Simulator Date: NameAffiliationsAddressPhone .
Doc.: IEEE /0053r0 Submission Jan Zhang Jiayin (Huawei Technologies)Slide 1 Further Considerations on Calibration of System Level Simulation.
July 2015 doc.: IEEE /XXXXr0 July 2015
Submission doc.: IEEE 11-12/0844r0 Slide 1 Non-linear Multiuser MIMO for next generation WLAN Date: Authors: Shoichi Kitazawa, ATR.
Supervisor: Prof. Jyri Hämäläinen Instructor: M.Sc Zhong Zheng A part of NETS2020 project Ying Yang
1 Discussion on some details for the simulation of IMT-A China Communications Standards Association CJK-B3G #20 in Zhangjiajie China, 8-10 April 2009 Qin.
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration Updated CCSA Activities on IMT Standardization and industry in China Ke Wang, CCSA Document.
College of Engineering WiFi and WCDMA Network Design Robert Akl, D.Sc. Department of Computer Science and Engineering Robert Akl, D.Sc. Department of Computer.
Submission doc.: IEEE 11-14/0627r0 May 2014 Josiam et.al., SamsungSlide 1 Outdoor Channel Models for System Level Simulations Date: Authors:
2008/5/81 Fixed WiMAX Field Trial Measurements and Analyses Ole Gr0ndalen, Pal Gr0nsund, Tor Breivik, Paal Engelstad Mobile and Wireless Communications.
Decentralized Femtocell Transmission Regulation in Spectrum-Sharing Macro and Femto Networks Xiaoli Chu King’s College London, UK OPTNet 2011, Sheffield,
Doc.: IEEE /1081r0 SubmissionSayantan Choudhury HEW Simulation Methodology Date: Sep 16, 2013 Authors: Slide 1.
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Evaluation Criteria and Traffic Models Update Farooq Khan IEEE Plenary Meeting Orlando, FL, USA March 15-19, 2004.
1 Performance comparison of Modulation and Coding set for IEEE m system Document Number: IEEE C802.16m-09/0555r3 Date Submitted: Source:
Doc.: IEEE /0251r0 Submission February 2011 Ron Porat, Broadcom Outdoor Channel Models for ah Date: Authors: Slide 1.
Doc.: IEEE /0553r1 Submission May 2009 Alexander Maltsev, Intel Corp.Slide 1 Path Loss Model Development for TGad Channel Models Date:
© 2006 Sprint Nextel WP5D Meeting Results
Doc.: IEEE /0786r0 Submission July 2013 Wu TianyuSlide 1 Discussions on System Level Simulation Methodology Date: Authors:
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
1 Performance comparison of Modulation and Coding set for IEEE m system Document Number: IEEE C802.16m-09/0555r2 Date Submitted: Source:
MU-MIMO System Performance of 8TX codebook IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0803 Date Submitted:
Doc.: IEEE /0799r2 Submission June 2014 Nihar Jindal, Broadcom Modifications to Simulation Scenarios and Calibration Process Date:
Doc.: IEEE /0680r1 SubmissionJiyong Pang, Huawei TechnologiesSlide 1 Reference Box5 Calibration Assumptions and Parameters Date: Authors:
Coexistence in heterogeneous networks Discuss the interference issue
Multiple Frequency Reuse Schemes in the Two-hop IEEE j Wireless Relay Networks with Asymmetrical Topology Weiwei Wang a, Zihua Guo b, Jun Cai c,
Doc.: IEEE /0307r0 Submission January 2014 Nihar Jindal, Broadcom PHY Calibration Results Date: Authors: Slide 1.
CJK IMT 25, Beijing, China 1/13 LTE-Advanced Evaluation by TTA PG 707 CJK-IMT25-xxx Seong-Jun Oh, Korea University
Proposal for TGm SDD Call for Proposal Topics Schedule Document Number: IEEE C802.16m-08/256 Date Submitted: Source: Jose Puthenkulam
3GPP2 A xxx TITLE: TITLE: Simulation Results for HRPD SCML with feedback sharingSOURCE Satish Kanugovi, Alcatel-Lucent,
IEEE C80216m-08/630 1 Interference Constraint Power Control Document Number: IEEE C80216m-08/630 Date Submitted: Source: Xiaoyi Wang, Chunye.
Submission doc.: IEEE /1373r1 November 2015 Narendar Madhavan, ToshibaSlide 1 Updated Box 5 Calibration Results Date: Authors:
3GPP2 A TITLE: TITLE: Simulation Results for HRPD SCML with feedback sharingSOURCE Satish Kanugovi, Alcatel-Lucent,
System Level Performance of 8TX Measurement Pilot IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0808 Date Submitted:
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Numericals.
The essentials of building wireless networks
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
System-Level simulation Inter-cell RRM Multi-cell RRM
Month Year doc.: IEEE yy/xxxxr0 November 2017
LTE-A Relays and Repeaters
WF on scenarios and evaluation assumptions for flexible duplex
Evaluation Model for LTE-Advanced
Modulation and Coding set design for IEEE m system
5G Micro Cell Deployment in Coexistence with Fixed Service
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for sub-GHz Interference Model] Date.
Month Year November 2018 November 2018
Submission Title: Link Budget for m
doc.: IEEE yy/xxxxr0 Date:
doc.: IEEE yy/xxxxr0 Date:
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Intended IG Objectives] Date Submitted:
Joint submission for Box 5 calibration
IMT-Advanced Technical Requirements
<month year> <doc.: IEEE doc> January 2013
doc.: IEEE yy/xxxxr0 Date:
doc.: IEEE yy/xxxxr0 Date:
doc.: IEEE yy/xxxxr0 Date:
Discussion on IMT-2020 mMTC and URLLC
Current Status of submission about EUHT
doc.: IEEE yy/xxxxr0 Date:
Simulation of LTE-V and WAVE
doc.: IEEE yy/xxxxr0 Date: September, 2019
Presentation transcript:

CJK#20 B3G-WG CCSA Wang Li Evaluation Schedule for CJK EVAL SIG

2 고객상담센터 조직구성 및 운영계획 Contents Introduction ChEG Evaluation Schedule Simulation Model and Assumptions CJK Eval SIG Time Schedule(Proposal)

3 고객상담센터 조직구성 및 운영계획 Introduction The reception of IMT-Advanced technologies will not be finished until Oct ‘09 ChEG is preparing the LTE-A evaluation platform and IEEE m evaluation platform We plan to participate in the LTE-A evaluation discussion in May ’09, 3GPP meeting Checking the IMT-A channel is one of our most important tasks. We would like to exchange our ideas on IMT-A channel implementation with CJK Eval SIG colleagues

4 고객상담센터 조직구성 및 운영계획 Sep ’09 May ’09 Apr ’09 Output the evaluation result of m technology …… Evaluate basic radio characteristics (e.g., geometry distribution, large scale loss distribution) Output the evaluation result of LTE-Advanced technology Compare the results with other companies or Eval Groups Focus on the SCM channel before Apr ’09 Check the accuracy of SLS ChEG Evaluation Schedule

5 고객상담센터 조직구성 및 운영계획 Simulation Model and Assumptions(1) Basic simulation assumptions ITU-R M.2135TR IEEE m- 08/003r7(SDD) Own assumptions for SLS Adding adaptive AMC margin scheme for selecting a matching MCS Fractional power control scheme (R ) Best resource block selection for retransfer users

6 고객상담센터 조직구성 및 운영계획 Simulation Model and Assumptions(2) ParameterValue Multiple AccessOFDMA(DL) DFT-S-OFDMA (UL) Number of Cells19 Number of Sectors per Cell3 Inter-site distance( m) Antenna Configuration2x2(DL) 1x2(UL) Centre Frequency2 GHz Traffic modelFull Buffer BS transmit power46dBm MS transmit power24 dBm Lognormal ShadowingStandard deviation: 10 dB Shadowing Correlation Between cells0.5 Between sectors1 UE Noise Figure9dB MS Antenna Gain0 dBi BS Antenna Gain14 dBi

7 고객상담센터 조직구성 및 운영계획 Simulation Model and Assumptions(3) ParameterValue MIMOSU-MIMO Path-Loss log 10 (R), R in km HARQSynchronous HARQ 6 Processes Maximum Retransmission Number3 Thermal Noise Density-174 dBm/Hz Antenna Bore-sight points toward flat side of cell (for 3-sector sites with fixed antenna patterns) BS Antenna pattern(horizontal) (For 3-sector cell sites with fixed antenna patterns) = 70 degrees, A m = 20 dB Minimum distance between UE and Cell>= 35 meters Users dropped uniformly in entire cell L2S interfaceEESM

고객상담센터 조직구성 및 운영계획 8 Some Ideas We would be glad to discuss IMT-A channel items with CJK Eval SIG colleagues

9 May ’09 May ’09 Apr ’09 CJK Eval SIG ITU-R IMT Advanced IMT.EVAL IMT.RADIO Proposal Submission Jan’09 Conference Call for checking the result of IMT- A channel Proposal Evaluation & Consensus Building Develop Recommendation Q1Q2Q3Q Q1Q2Q3Q4 JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec Q1Q2Q3Q Oct ’09 Jun ’10 AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec ITU-R WP5D Oct ’08 System Level Link Level Conference for checking the result of SNR-BLER curves of LLS Conference Call for checking the geometry distribution and large scale loss of LTE-A system Apr ’09 Conference for checking the result of user throughput and the cell edge user spectral efficiency of LTE-A system May ’09 May ’09 Conference for checking the result of m system Sep ’09 Conference for checking the result of any other candidate technologies CJK Eval SIG Time schedule for IMT-A Evaluation (Proposal)

10 ANNEX : Part of Simulation Results

Geometrey Distribution 11

12 Large Scale Loss (Urban Macrocell and Suburban Macrocell)

13 Thank you!