2/27/2016rd1 Present Worth Analysis 1. Mutually Exclusive at MARR of 7% A B First cost$1500$1600 Salvage value 200 325 Life (years) 5 5 PW A = -1500 +

Slides:



Advertisements
Similar presentations
Cost Estimation for Engineering Projects CIVE 4312 Hanadi Rifai.
Advertisements

Present Worth Analysis
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Present Worth Analysis
Engineering Economics
Engineering Economics Outline Overview
1 Dr. Lotfi K.GAAFAR Eng. Ahmed Salah RIFKY ENGR 345 Engineering Economy.
InvestmentWorth Investment Worth. Given a minimum attractive rate-of-return, be able to evaluate the investment worth of a project using Net Present Worth.
Chapter 5 Present Worth Analysis
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Flash back before we compare mutually exclusive alternatives.
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
COMPARING ALTERNATIVES
Engineering Economy IEN255 Chapter 4 - Present Worth Analysis  Do the product or not?  3 main issues  How much additional investment in plant & equipment.
Slide to accompany Blank and Tarquin Basics of Engineering Economy, 2008 © 2008 McGraw-Hill All rights reserved Lecture slides to accompany Basics.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CHP IV-PRESENT WORTH ANALYSIS CE ECONOMIC DECISION ANALYSIS.
Chapter 1 Q: Describe the concept of equivalence in a way that your brother in law can understand it… Since money has time value, an amount today will.
Quiz Book Summer 2003 Prepared by: Eng. Ahmed Taha.
Intro to Engineering Economy
Test 1 solution sketches Note for multiple-choice questions: Choose the closest answer.
Present Worth Analysis Lecture slides to accompany
Engineering Economy Why is Engineering Economy important? Practical everyday questions –Should you finance your car or pay cash? Finance for $6995 –vs-
MER1601 MER Design of Thermal Fluid Systems Engineering Economics – Comparing Alternatives Professor Bruno Winter Term 2005.
CF Winter Discounted Cash Flow Valuation ch 6.
Comparing Projects Using Time Value of Money
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Net Present Worth Review NPW can compare mutually exclusive projects or prioritize investments (using Incremental Analysis) Criteria: Choose highest NPW.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Evaluating a Single Project
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
ENGR 112 Economic Analysis II. Engineering Economic Analysis Time Value of Money $1 today is more valuable than $1 a year later Engineering economy adjusts.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 4-3 Comparison of Alternatives Present Worth Analysis.
1 Perpetuity (Capitalized Cost) Occasionally, donors sponsor perpetual awards or programs by a lump sum of money earning interest.Occasionally, donors.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
ISU CCEE CE 203 Present Worth Analysis (EEA Chap 5)
Equivalence of cash flows Construction Engineering 221.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Perpetuity (Capitalized Cost) Occasionally, donors sponsor perpetual awards or programs by a lump sum of money earning interest.Occasionally, donors sponsor.
12/19/2015rd1 Engineering Economic Analysis Chapter 3  Interest and Equivalence
12/26/2015rd1 Engineering Economic Analysis Chapter 4  More Interest Formulas.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. CHAPTER V PRESENT WORTH ANALYSIS McMc Graw Hill ENGINEERING.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Annual Worth Analysis Course Outline 5.
2/20/2016rd1 Engineering Economic Analysis Chapter 8  Incremental Analysis.
2/22/2016rd Multiple Rates of Return nCash FlowCumulativeAdjusted 10% 20% 0-$500-$500 -$500 -$ (quadratic
3/16/2016rd1 Engineering Economic Analysis Chapter 13  Replacement Analysis.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Engineering Economics Exam 2 Review. CASH FLOW DIAGRAM Yes -- you do need the Sticks!!
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Class # 7 Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1.
Quiz Book Summer 2003 Prepared by: Eng. Ahmed Taha.
Lecture slides to accompany
Evaluation Alternatives Present Worth Analysis
Present Worth Analysis Lecture slides to accompany
Evaluation Alternatives Present Worth Analysis
Present Worth Analysis
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Chapter 7 Present Worth Analysis
Evaluation Alternatives Present Worth Analysis
Present Worth Analysis Lecture slides to accompany
Present Worth Analysis Lecture slides to accompany
Lecture slides to accompany
Lecture slides to accompany Engineering Economy, 8th edition
Engineering Economic Analysis
Lecture slides to accompany
Lecture slides to accompany
Systems Engineering and Analysis
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Presentation transcript:

2/27/2016rd1 Present Worth Analysis 1. Mutually Exclusive at MARR of 7% A B First cost$1500$1600 Salvage value Life (years) 5 5 PW A = (P/F, 7%, 5) = -$ ** PW B = (P/F, 7%, 5) = -$

2/27/2016rd2 2. Mutually Exclusive: Choose the best at the MARR of 10%. A B C First cost AOC Salvage value Life (years) PW A (10%) = (P/A, 10%, 5) + 200(P/F, 10%, 5) = -$ PW A (10%) = ( (PGA ) (PGF ))  -$ PW B (10%) = (P/A, 10%, 5) + 350(P/F, 10%, 5) = -$ PWB(10%) = ( (PGA ) (PGF ))  -$ PWC(10%) = (P/A, 10%, 5) + 100(P/F, 10%, 5) = -$ PWC(10%) = ( (PGA ) (PGF ))  -$ Choose A, least cost

2/27/2016rd3 Three ways to buy a car Plan A: $5,000 cash immediately Plan B: $1,500 down and 36 monthly payments of $ Plan C: $1,000 down and 48 monthly payments of $ Keep car for 5 years with i = 12% compounded monthly; repeat at 6% at i = 12%/ 12 = 1% per month PW A = -$5K PW B (1%) = – (P/A, 1%, 36) = -$5000 PW C (1%) = – (P/A, 1%, 48) = -$ Choose A or B at i = 6%/12 = ½% PW A (1/2%) = -$5K PW B (1/2%) = ,1/2%,36) = -$ PW C (1/2%) = – (P/A,1/2%, 48) = -$ Choose A

2/27/2016rd4 3. Different life on leasing example at 15% MARR A B First Cost, $-15K-18K Annual cost-3, Deposit return, $1,000$2,000 Lease term 6 9 Compare for 18 years, least common multiple and same first costs. PW A (15%) = -15K -14K[(P/F,15%,6) + (P/F,15%,12)] (P/A 15% 18) (P/F,15%,18) or in code (+ -15e3 (PGF -14e3 15 6) (PGF -14e ) (PGF 1e ) (PGA ))  -$45, PW B = (+ -18e3 (PGA ) (PGF -16e3 15 9)(PGF 2e )) = $ -41, ** …continued 

2/27/2016rd5 3. Different life on leasing example at 15% MARR A B First Cost, $-15K-18K Annual cost-3, Deposit return, $1,000$2,000 Lease term 6 9 Compare for a 5-year study with same deposit return. PW A (15%) = -15K -3.5K(P/F,15%,5) + 1K(P/F,15%,1) = -$25, PW B (15%) = -18K -3.1K(P/F,15%,5) + 2K(P/F,15%,4) = -$27, Choose A

2/27/2016rd6 Present Worth 4. Find P at 6% equivalent to the benefits. n cfP P = 100(P/A, 6%, 6) + 100(P/G, 6%, 6) = G(P/G, 6%, 7)(F/P, 6%, 1) (PGG A G i n)  (PGG )  $

2/27/2016rd7 Capitalized Costs P = A[(1 + i) n -1] / [i(1 + i) n ] As n  infinity, P  A/i PW = CC = A/i or A = CC * i = Pi $10,000 at 10% can generate $1000 per year in perpetuity … N   P

2/27/2016rd8 5. A system costs $150K to install and $50K 10 years later. Annual maintenance is $5K for the first 4 years and $8K thereafter. A $15K recurring upgrade cost every 13 years is required. At i = 5%, find the equivalent annual cost forever. Non-recurring costs  CC1 = (+ -150e3 (PGF -50e3 5 10))  -$180, Recurring cost $15K every 13 years  A1 = (AGF -15e3 5 13)  -$ CC2 = 5000/0.05 = 100K CC3 = 3000/0.05 = 60K but brought back 4 years with (PGF 60e3 5 4)  = - $49, CC = ( e )  $330, Annualize  $330, * 0.05 = $16, Total annualized cost is then ( )  $17,349.73

2/27/2016rd9 Problem 5-84 n cf (list-PGF '( ) 15)  -$ K Choose the Do Nothing earning at the MARR of 15%.

2/27/2016rd10 Alternatives A B MARR = 10% First cost$205K$235K Ann Maint 29K 27K Salvage 2K 20K Life (years) 2 4 PW A = 205K + 29K(P/A,10%, 4) + 203K(P/F,10%,2) -2K(P/F,10%, 4) = $463,329 PW B = 235K + 27K(P/A,10%, 4) – 20K(P/F, 10%, 4) = $306,926 => Choose B, Less Cost

2/27/2016rd11 a) Select better machine based on PW at 15% per year and state assumptions. Machine AMachine B First Cost11,00018,000 Annual operating cost 3,500 3,100 Salvage 1,000 2,000 Life (years) 6 9 PW A (15%) = 3500(P/A,15%,18) K( )-1000(P/F, 15%, 18) = $38, (cost) PW B (15%) = 3100(P/A,15%,18) + 18K + 16K(P/A,15%,9) - 2K(P/F,15%,18) b) Select based on 5 year study period. PW A (15%) = 11, (P/A,15%,5) (P/F,15%,1) = -$21, PW B (15%) = 18, (P/A, 15%, 5) (P/F,15%,5) = -$27, c) Find B's salvage for an indifferent decision in a 6-year study. PW A (15%) = 11, , = 18, , S( ) 23, = 29, S => S = $13,

2/27/2016rd12 Annual Deposit The annual deposit needed in years 1 to 5 to provide for an annual withdrawal of $1000 for 20 years beginning 6 years from now at i = 10% per year is closest to $1395b) $1457 c) $1685d) > $1750 A(F/A, 10%, 5) = 1000(P/A, 10%, 20) A(6.1051) = 1000( ) = $1394.5

2/27/2016rd13 Combining Factors If $5000 is deposited now, $7000 two years from now and $2000 per year in years 6 to 10, the amount in year 10 at an interest of 10% per year will be closest to < $40Kb) $40,185c) $42,200d) $43,565 F 10 = 5K(1.1) K(1.1) 8 + 2K(F/A, 10%, 5) = $12, , $12,210.2 = $40,184.03

Perpetuity With interest at 8% compounded annually, how much money is needed to provide a perpetual income of $14,316 per year? P = (/ )  $178,950 2/27/2016rd14

Education You want to deposit $8,000 per year for 4 years of your child's education on the 18 th birthday. Today is your child's first birthday. At 12% interest, how much to deposit today? a) $24,298b) $3538c) $32,000d) $3963 2/27/2016rd15