Contact Information Cari Kobialko Data Integrity Manager Tel: (604) 592-8225 Location.

Slides:



Advertisements
Similar presentations
Follow the ABCGA April is Safe Digging Month. Follow the ABCGA.
Advertisements

Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
Georgia underground marking standards
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
113 East College Avenue, Suite 200 Tallahassee, Florida
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
Prepared by: Beatrice Powell April 2012 Modified by: Sue Dawson September 2012.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Public Awareness Workshop Public Perspective Presented by Carl Weimer The Public’s Pipeline Awareness.
March 31/10 Terasen Inc. A Fortis company. BC Common Ground Alliance Dig Safe BC, Cranbrook Safe Excavation Practices when working around Distribution.
| Part 1: Background About Georgia 811 Georgia Dig Law Notification requirements Penalties Hours of operation Positive Response.
WXES2106 Network Technology Semester /2005 Chapter 8 Intermediate TCP CCNA2: Module 10.
1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of.
Louisiana State Police Emergency Services Unit. The Emergency Services Unit is comprised of: Explosives Control Explosives Control HazMat HazMat Right-to-Know.
Permit to Work Procedure Document Number: KOC.SA.004
The Outlook Help Desk System A very quick introduction.
Public Awareness and Pipeline Safety Pipeline Safety Trust November 15, 2007 Dan Kirschner Executive Director.
CCS ServiceRequest Delivering a consolidated approach for employee requests for service.
VIBRANT MEDIA Online Marketing & Event Administration Solutions 11 March 2009.
Presented By: Product Activation Group Syndication.
Smart Meter Texas (Draft) Help Desk SMT Help Desk The Help Desk receives, fulfills and closes end user requests for service, incidents, resolution of problems,
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
Excavator Safety DIG TESS Texas Administrative Code Title 16 Chapter 18 Underground Pipeline Damage Prevention.
Blasting Regulations Proposed Changes to The Existing Ordinance.
Indianapolis/Marion County GIS & DigSmart Ryan R. Johnson March 8, 2006.
Guide to the TDM online system
Preparing for Disasters General Liability. Introduction  The one coverage that provides you and your business the most protection is General Liability.
Research Phase, Indiana 811, Initial Notice, Verification Deborah Porter Project Engineer/Utility Coordinator Clark Dietz, Inc.
La Center, Washington: Balancing Pipelines and Populations 1.
Emergency Communication Tree Procedures. The Emergency Communication Tree procedures enhance the company’s current objectives around emergency preparedness.
Computer Emergency Notification System (CENS)
System Initialization 1)User starts application. 2)Client loads settings. 3)Client loads contact address book. 4)Client displays contact list. 5)Client.
UKSTT Breakfast Seminar NO-DIG LIVE 2010 ‘ Utility Perspectives & Concerns’ 5 th October 2010 Les Guest – CEO NJUG Ltd.
Audit of Radiology Alert system for critical, urgent and unexpected significant findings K A Duncan K Drinkwater On behalf of CRAC May 2015.
Empowering Campus Communication: The University of Texas at Austin Group System Tim Chamberlain Deanna Bearden.
When a Locate is needed South Dakota Law Chapter 49-7A requires that anyone who engages in any type of excavation provide advance notice of at least 48.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
Gas Safety and Excavating: What you need to know Presented by the BC Safety Authority.
Unavoidable Impacts of Streetworks Legislation Jon Butterworth MBE Director, National Operations.
Office of Pipeline Safety Impacts of Integrity Management James K. O’Steen Deputy Associate Administrator for Pipeline Safety July 23, 2002.
The Perfect Claim. To Achieve the Perfect Claim Negotiation Is the Route to Take Abstract In an effort to recover monetary losses associated with damages.
February 18, 2010 Terasen Gas. A Fortis company. Dig Safe B.C. Abbotsford Damage Prevention Burn blue. Save green.
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
Public Awareness Programs for Pipeline Operators WESTERN REGIONAL GAS CONFERENCE August 21, 2007 Presented by: Ross Reineke.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Cost effective while providing customer focused solutions.
System Integration For Improved Customer Service City of Tallahassee Underground Utilities.
Introduction Pipeline safety awareness meetings in a presentation setting are nearing the end of their lifecycle and usefulness. Pipeline and utility.
Department of Environmental Health & Safety
Jim Doherty MRSC Legal Consultant
Working Safely Near Power Lines NOVA SCOTIA ASPHALT USER PRODUCER ASSOCIATION.
Blackboard Learn 9.1 Communicating with Students © 2010 Blackboard Inc. All rights reserved.
Protection of Minors Program Coordinators Information Session November 2015 Carolyn Brownawell Melisa Giraldo Dietrich Warner.
Georgia underground marking standards
How To Read MS811 Locate Request Tickets
How to Read Daily Audit Reports
SoM Signage Policy All SoM building signs have to be ordered through the Office of Facilities Planning and Management. In general, replacement and additional.
Melissa Holbrook Cell:
How to Import and Export Users In WordPress. Why or When You Need to Import & Export users in WordPress? When you purchase a site and need to merge the.
Unit4 Partner Portal for Case Creator
Significant Procedural Changes to the One-Call System
Research Phase, Indiana 811, Initial Notice, Verification
New Midwifery Practice Orientation Presentation to the Association of Ontario Midwives June 20, 2014.
EMS Development Course for Government Agencies
County Wide Safety Program
105 Indiana Administrative Code Article 13
Project Manager / Utility Liaison
Presentation transcript:

Contact Information Cari Kobialko Data Integrity Manager Tel: (604) Location Records BC One Call Process

2 Agenda Introduction Mandate of Location Records BC One Call Process Terasen Gas Locate Policy Statistics The Ticket

3 Location Records Mandate The Location Records group responds to BC 1 Call requests for locate information as per the standards and regulations. They ensure accuracy and legibility of information and ensure clients understand and acknowledge safety information.

4 What is Ticket Processing? Review the dig area designated by the ticket to establish if there are any gas mains or services that may be impacted Provide a map of the specified area –Showing the location of mains or services –Showing the absence of mains or services Provide relevant sketches if they exist Communicate safety related dig information Send information to excavator within 2-day time limit

5 Processing BC 1 Call Tickets

6 Terasen Locate Policy On-site or physical locates shall be provided when: –Records are inadequate, unclear or not available –There is an emergency repair of another utility in progress –Excavator has been unsuccessful in hand-locating our main or service or gas installation is not where Terasen records indicate –Planned excavation is within 10m of an IP main or service –Planned excavation is within 30m of the edge of TP pipeline or Right of Way (ROW) –Ticket is placed by the Ministry of Highways and its’ contractors

7 Statistics BC One Call Terasen Ticket volume for 2008 was 61, were sent for a physical locate in 2008 We may have as many as 1400 hit lines 75% of people who damage our plant do not call BC One Call to request information

8 BC One Call Ticket Volumes

9 The Ticket – Fax/Transmittal and BC 1 Call Ticket Requestor Information General Dig Location Type of ticket & detailed dig information Terasen Message to requestor Type of work BC One Call Members notified Ticket number John Smith

10 The Ticket – Terasen Reminders What to do before you excavate What to do if you hit a gas line

11 The Ticket – Terasen Reminders ….continued Plate Map Symbols and Line codes Locates, delays and blasting Permit requirements

12 The Ticket – Terasen Reminders …continued

13 Plate Map Example

14 Service Records - Example Gas Service Meter Location Street North Arrow Known Point

15 Questions