25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Server Virtualization: Navy Network Operations Centers
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Winter 2011/2012 shutdown On-call service - FSU Future projects AOB G. Olesen - PH-DT-DI.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
Roles Committees Meetings
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Technical Support Activities in PH-ADO-PO
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Gas Systems for Particle Detectors R.Guida on behalf of the PH-DT-DI/Gas Service Team PH-DT Seminar CERN September 4 th, 2014.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Oracle for Physics Services and Support Levels Maria Girone, IT-ADC 24 January 2005.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
TE-CRG Activities D. Delikaris, TE-CRG.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Section Meeting News and MARS 22/01/ FH1. General Activity and Staff Organigram for the DI Section 22/01/ FH2 TF+GlassAndre Braem Thomas Schneider.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
June 22, 2017 Burkhard Schmidt for the DT coordination team
CRG-TM: LS1 projects review
Safety in Construction and Upgrade Phases
CMS gas systems meeting
4th FRC meeting, Antti Onnela, CERN-PH-DT
Savannah to Jira Migration
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
HL-LHC upgrade at IPHC news
Presentation transcript:

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements during 2013 Agree/Review activities and schedule for 2014

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas2 Introduction – Working team PH-DT-DI Gas Service Team ALICE Albin Wasem ALICE Frederic Merlet (0.25) Louis-P. De Menezes (0.5) CMS-TOTEM Andrea D’Auria (0.5) LHCb Patrick Carrie (0.5) Steven Pavis (0.25) Coordination R. Guida FSU team Jonathan Dumollard Abdelmajid Laassiri Benjamin P. Marichy Herve Martinati Ace Ordanov (User) Cedric Landraud (also CMS-CO2) Guillaume Lacroix (also CERN Expo) Gas Service Team mandate:  M&O and upgrades of the gas systems for all the LHC experiments: -preventive and corrective maintenance on 30 gas systems -on-call service all along the year (24/24 7/7) – phone  Construction of gas systems for other experiments at CERN (CLOUD, NA62, LINAC4, …)  General support for test beam and equipment belonging to external users.

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas3 ALICE experiment and Gas Service Team PH-DT-DI Gas Service Team First contact persons for all issues related to ALICE gas systems during working hours is in charge of: -standard operation -standard maintenance/small modifications -daily check of all systems ALICE A. Wasem If Albin is on holiday or busy: -during working hours  call directly Roberto ( ) -outside working hours  call directly on-call service ( ) Outside working hours  call directly on-call service ( )

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas4 In order to cope with LS1 a significant reinforcement of the team during 2013 was needed: ▫two new users with high experience in the workshop (mechanics and gas systems) ▫many students for short and well defined projects Details:  CERN FTE (and students > 1 year): ▫6.3 FTE: +1.3 wrt 2012  -Ernesto: TTS 50% for gas project  “FSU” (FSU + technical users): ▫5.5 FTE: +1.5 wrt 2012  -Ace: user on ALICE budget -Andrei: user on ALICE budget  Trainees (student < 1 year) ▫1.9 FTE: +1.8 wrt 2012  -4 trainees (3 from Poland, 1 from Canada) -2 summer students -2 children of staff members Working team Gas Service working team

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas activities can be divided into three main sectors: 1.Standard maintenance of gas systems for the LHC experiments 2.LS1 consolidation program for the LHC experiments 3.Not LHC experiments/support to users LS1 – 2013: Overview PH-DT-DI Gas Service Team  Standard maintenance and LS1 consolidation program constitute the main field of activity  Not LHC experiments and support to users represent about 20% of the activities

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas6  ALICE contribution to M&O budget for gas systems: (2013-LS1 consolidation) kCHF  Total 158 kCHF ALICE gas M&O 2013: on-call Review usage of ALICE gas M&O 2013 Analysis (TRD) Gas supply high flow alarm (Ar, CO2, N2) Power supply (24 V) Pressure regulation valve (TPC) Pump (TPC) Purifier (TRD) Xe recuperation (TRD) Gas supply not ready (EN-MEF) Xe, R134a, SF6, Ar Infrastructure (GS-ASE) GS intervention, Ar-H2 Software (EN-ICE) Communication, TPC On-call service:

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas7 On-call service summary ALICE gas M&O 2013: on-call Review usage of ALICE gas M&O 2013 On average only 1.5 h/year/system of downtime (power-cuts and outside events excluded) Intervention are: ▫Equally distributed between experiments ▫Decreasing with time Intervention triggered by:

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas8 ALICE gas M&O 2013: material Review usage of ALICE gas M&O 2013

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas9 ALICE gas M&O 2013: material Review usage of ALICE gas M&O 2013

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas10 ALICE gas M&O 2013: material for gas workshop Review usage of ALICE gas M&O 2013

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas11 ALICE gas M&O 2013: FSU resources Review usage of ALICE gas M&O 2013 FSU and users (i.e. Andrey, Ace)

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas12 Summary: ALICE gas M&O 2013: summary Review usage of ALICE gas M&O 2013 about 58 kCHF overspending

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas schedule LS1 – 2013 schedule

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas14 LS1 – 2014 schedule More details available on the excel table in agenda 2014 schedule

Software upgrade 25/04/2014R. Guida, A. Wasem PH-DT-DI Gas15 EN-ICE is preparing the migration to a new software version (CPC6 & more). The migration requires to (~) completely rewrite the code (PLC+PVSS):  Preparation phase needed to define strategy and milestons Define modules, test logic, … Validation of one/two gas systems covering almost all functionalities Deployment on one experiment (all detectors) Deployment on all the experiments  A complete commissioning will be required (same as it was done at the first start-up of the gas systems)  About one-two week of stop/instability for each detector  Activitiy scheduled from January to April 2014  Resolve remaining bugs without long stop of gas systems - September-October 2014 Main responsible: Steven Pavis Software upgrade

25/04/2014R. Guida, A. Wasem PH-DT-DI Gas16 Software upgrade Main responsible: Steven Pavis