Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.

Slides:



Advertisements
Similar presentations
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Advertisements

Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Houston Region Import Capacity Project Planning for Reliable Power.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Public Service Company of New Mexico
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
Ensuring an Equitable Review AmeriCorps External Review Training.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
11 TAG Meeting May 18, 2010 ElectriCities Office Raleigh, NC.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
11 TAG Meeting December 9, 2009 NCEMC Office Raleigh, NC.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Houston Area Dynamic Reactive Project March 11,
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
COMMON USE SYSTEM March 5, 2008 Black Hills Power Service Center Rapid City, SD TRANSMISSION COORDINATION AND PLANNING COMMITTEE.
1 TAG Meeting December 4, 2008 NCEMC Office Raleigh, NC.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Forming a Cost Assignment/ Cost Recovery Team RMATS Steering Committee January 13, 2004.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Yellowhead Area Transmission System Development
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
1 TAG Meeting May 9, 2008 NCEMC Office Raleigh, NC.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
ElectriCities Office Raleigh, NC
Progress Briefing - Energy Initiative
Compare and Contrast Reliability Assumptions
Electric Utility Master Plan Update
Status of the Planning Working Group’s (PWG) Efforts
SEARUC Conference Little Rock, AR June 4, 2007
New England Resource Adequacy
Release 3 Plan Options Decision
Release 3 Plan Options Analysis
Presentation transcript:

Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public Staff

Purpose of NCTPC Provide the Participants and other stakeholders an opportunity to participate in the transmission planning process Preserve the integrity of the current reliability and least-cost planning processes Expand the transmission planning process to include analysis of increasing transmission access to supply resources inside and outside IOU control areas Develop a single coordinated transmission plan for the Participants in North Carolina that includes reliability and enhanced transmission access considerations while appropriately balancing costs, benefits, and risks associated with the use of transmission and generation resources.

Benefits of the Process Insight into the neighboring system’s modeling approaches, including resource assumptions, contingencies evaluated and system dispatch assumptions; Higher confidence in and understanding of data provided by all participants, including more detailed and timely information shared; Improved understanding of the neighboring transmission system, including its strengths and weaknesses and the relationship of impacts between the two transmission systems;

Benefits of the Process Shared technical and planning expertise that resulted in improved modeling, more comprehensive evaluation of the impact of generation and transmission contingencies, and consideration of more extensive sets of solutions; and More comprehensive approach to developing solutions to address not only reliability, but also to increase access to alternative resource supply options for LSEs.

Organizational Structure Oversight / Steering Committee (OSC) Planning Working Group (PWG) Transmission Advisory Group (TAG) Independent Third Party (ITP)

PWG evaluates reliability problems and current transmission upgrade plans PWG develops and the OSC approves the reliability study scope PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules Participants and TAG recommend scenarios and interfaces. The OSC selects interface and scenario studies for analysis PWG coordinates the study analysis, identifies access problems, develops solutions with estimates of costs and schedules Reliability Planning Enhanced Transmission Access Planning OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions OSC creates final draft Collaborative Plan Feedback and Iterative Studies Participants and TAG review the reliability study results Participants’ resource planning processes Participants and TAG review the enhanced access study results TAG feedback on final draft Collaborative Plan OSC approves final Collaborative Plan PWG develops and the OSC approves the enhanced access study scope

Reliability Planning Study The Scope of the Reliability Planning Study included a base reliability analysis as well as analysis of potential resource supply options The purpose of the base reliability study was to evaluate the transmission system’s ability to meet load growth projected for 2011 through 2016 with the Participants’ planned Designated Network Resources (“DNRs”) The purpose of the resource supply analysis was to evaluate transmission system impacts for various resource supply options to meet future native load requirements.

Enhanced Transmission Access Planning The ETAP Process evaluates the means to increase transmission access for LSEs in North Carolina to potential network resources inside and outside the control areas of the IOUs. The ETAP Process begins with the Participants and TAG members proposing scenarios and interfaces to be studied. The final results of the ETAP Process include the estimated costs and schedules to provide the increase transmission capabilities. The results are reviewed with the TAG. No requests for Enhanced Transmission Access Planning were received in Parties can now make proposals for 2007.

1.Assumptions Selected 2.Study Criteria Established 3.Models and Cases Developed 4.Study Methodologies Selected 5.Technical Analysis Performed 6.Problems Identified and Solutions Developed 7.Collaborative Plan Projects Selected 8.Study Report Prepared Overview of the Study Process

Summary of 2006 Collaborative Plan Comprised of 16 Duke and Progress Projects Only projects with projected cost of $10 million or more are listed Details listed in Appendix B & C of report List will be updated on an ongoing basis

Phase Angle Issue on Richmond- Newport 500kV Tie This 500 kV interconnection is approximately 80 miles long and carries large amounts of power during high import conditions Closing the line with phase angles greater than 30 degrees creates an unacceptable sudden change of power on the generating units in the electrical vicinity PWG brainstormed potential solutions Progress hired consultant to assist in researching available technologies Progress has added 500 kV series reactors at Richmond 500 kV Sub to the Plan

Projects Identified through the Collaborative Process Add a third Wake 500/230 kV transformer Construct Duke/Progress 230 kV line Construct new Progress 230 kV line

Add 3 Project Detail Sheets and 3 Map Inserts Here

1 st Quarter 2 nd Quarter3 rd Quarter 4 th Quarter Enhanced Access Planning Process Coordinated Plan Development  Perform analysis, identify problems, and develop solutions  Review Reliability Study Results  Evaluate current reliability problems and transmission upgrade plans  Propose and select enhanced access scenarios and interface  Perform analysis, identify problems, and develop solutions  Review Enhanced Access Study Results Reliability Planning Process  OSC publishes DRAFT Plan  TAG review and comment  Combine Reliability and Enhanced Results TAG Meetings Coordinated Plan Development

Appendix

Key Assumptions Study Year and Planning Horizon –Used 2011 Summer for Duke – Progress East –Used 2010/11 Winter for Duke-Progress West –The Plan addresses a 10 year planning horizon through 2016 Network Modeling –Included projected transmission and generation –Included Cliffside (Duke), Anson and Richmond (NCEMC), and Wayne Co. (Progress) future generation Interchange and Generation Dispatch –Each Participant provided resource dispatch order for its Designation Network Resources –Transmission Reliability Margin (TRM) was modeled for Progress import cases

Major Projects from Base Analysis Richmond 500 kV Substation, add 500 kV series reactors Durham 500 kV Substation, the Mayo-Wake 500 kV line will be looped in and one new 500/230 kV transformer bank will be installed Construct Cape Fear-Siler City 230 kV line Rockingham-West End 230 kV line, construct the Wadesboro tap line and the new Rockingham-West End 230 kV East line projects Construct Asheville-Enka 230 kV line and the install a new 230/115 kV transformer establishing 230 kV at the Enka 115 kV Substation Increasing the 500/230 kV transformer capacity at the Antioch Substation Bundling of the London Creek (Riverview Switching Station to Peach Valley Tie) 230 kV line.

Insert 8 project detail and 7 map insert sheets here (2 Duke map inserts are already here, 2 Progress projects will share a single map insert)

Increase Antioch 500/230 kV Transformer Capacity

Bundle London Creek (Riverview to Peach Valley) 230 kV Lines

Resource Supply Option Study Results Transfer FromTransfer ToCapacity (MW) Earliest Resource Supply Option Start Date Nominal Cost ($M) PJM (AEP)Duke TVADuke SOCODuke SCEGDuke SCPSADuke CPLEDuke DukeCPLE SCEGCPLE SCPSACPLE SOCOCPLE TVACPLE PJM (AEP)CPLE PJM (DVP)CPLE PJM (AEP/AEP)Duke/CPLE600/ PJM (AEP/DVP)Duke/CPLE600/ PJM (AEP)CPLW202010/20110

Enhanced Transmission Access Planning TAG Responses – Due by February 14, 2007 PWG reviews all proposed scenarios / interfaces and provides OSC a recommendation on the Enhanced Transmission Access Options for analysis in 2007 OSC to provide TAG feedback by end of March 2007