15B Critical path analysis. In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start.

Slides:



Advertisements
Similar presentations
Lecture Network Analysis
Advertisements

Critical Path Analysis Activity duration Shower3 Dry hair8 Fetch car7 Iron clothes12 Dress and make-up10 Drive to interview20 Example 4.1 textbook pages.
Project Scheduling: PERT/CPM n Managers are often responsible for planning, scheduling and controlling projects that consist of numerous separate jobs.
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Copyright © 2008 Pearson Education, Inc. Slide 13-1 Unit 13C Scheduling Problems.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
X- FUNDAMENTAL SCHEDULING PROJESS
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
Based on the book: Managing Business Process Flows
Critical Path Analysis. There are no pre-requisites for this Achievement Standard so it can be placed in any course. No knowledge is pre-supposed.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Copyright © 2008 Pearson Education, Inc. Slide 13-1 Unit 13C Scheduling Problems.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Tutorial 2 Project Management Activity Charts (PERT Charts)
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
1 PERT Chart for Nekretnine Macronet [2012.] T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23.
5.8 Project Management Chapter 37 HL - Only.
CPA A house is to have new carpets fitted throughout. The work involved has been divided into a number of tasks, as shown in the table.
MGMT 483 Week 8 Scheduling.
Network exercise (P2) Consider the PERT/CPM network shown below. D A 2
Minimum cost spanning tree and activity networks Data structure 2002/12/2.
Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers are responsible for.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Example -
ME 380 Project Planning. Critical Path Method (CPM) Elements: Activities & Events Feature: Precedence relations ActivityDurationPrecedence A4- B5- C3A.
Chapter 10 Project Scheduling: PERT/CPM
Critical Path Analysis Activity Duration mins Shower3 Dry hair8 Fetch car7 Iron clothes12 Dress and make-up10 Drive to interview20.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
15C Backward scanning and crashing
Prof. Awad Hanna Estimating Activity Duration Time Interval  Time Interval is selected according to the nature of the activity (seconds - minutes…) 
___________________________________________________________________________ Operations Research  Jan Fábry Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
© Pearson Education Limited 2004 OHT 8.1 Cadle and Yeates: Project Management for Information Systems, 4th edition Critical Path Method(CPM)
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
Analysing the AoN network Project Management (seminar)
PERT/CPM Chart David Nandigam 1. 2 PERT/CPM Chart Task. A project has been defined to contain the following list of activities along with their required.
 Chapter 6: Activity Planning – Part 2 NET481: Project Management Afnan Albahli.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Critical Path Analysis - Worksheet
Network Diagram Prob 1 Activity Predecessor Duration (days) A None 2 B
Critical Path Method(CPM)
UNIT II Scheduling Procedures & Techniques FLOAT
Activity networks – Example 1
Project Scheduling Lecture # 1.
Critical Path Analysis (CPA)
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
Analysing the AoA network
Critical Path Analysis
Network Notes Ms Allan 2012 AS91260 (2.5) Designed to teach from,
Project Management CPM Method Tutorial-p1
תזמון פרויקטים.
PERT - The Program Evaluation and Review Technique
Analysing the AoA network
Activity Networks
Critical Path Analysis
Critical Path Analysis
Activity Networks
Exercise – A small building.
Analysing the AoA network
Operations Research Lecture 7.
Operations Research Lecture 8.
Critical Path Analysis
Presentation transcript:

15B Critical path analysis

In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start of subsequent activities. The immediate predecessor of an activity is an activity that must be completed before the next activity can commence.

The earliest start time (EST) is the earliest that any activity can be started after all prior activities have been completed and is recorded in the triangle preceding the activity. Float time is the difference in time between those activities that cannot be delayed and those that can. The latest start time is the latest time that an activity may begin without delaying the entire project.

The critical path is the path through the network along activities that cannot be delayed without delaying the entire project. Ex 15B, Q. 5, 6, 7, 8, 9, 10, 11b, 11d, 12