PERT/CPM F G A E H I J K D St T B C

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Chapter 13 Project Scheduling: PERT/CPM
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
X012 P(x) A probability distribution is as shown. If it is repeated and the 2 distributions combined then the following would be the table of.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Fall 2001BA Project Management1 BA 301 – Spring 2003.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 © 2007 Pearson Education.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Example: Frank’s Fine Floats
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling: Networks, Duration Estimation, and Critical Path
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
In the name of Allah the Most Gracious the Most Merciful.
Project Scheduling: Networks, Duration estimation, and Critical Path
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
EMGT 501 Mid-Term Exam Due Day: Oct. 18 (Noon).
EMGT 501 HW # Due Day: Sep 27.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Prosjektstyring bma ACTIVITY A B C D E A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
PERT/Activity Diagrams, Completion Probability and the Z Score
Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
8-1 Example: Frank’s Fine Floats Frank’s Fine Floats is in the business of building elaborate parade floats. Frank and his crew have a new float to build.
PERT CPM assumes duration of activity is known with certainty.
PERT/Activity Diagrams, Completion Probability and the Z Score
Project Management Chapter Topics
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PROJECT MANAGEMENT WITH CPM/PERT.
Project Management CPM Method Tutorial-p2
Project Planning and Budgeting
Probabilistic Time Estimates
Chapter 6 Scheduling
תזמון פרויקטים.
Chapter 16 – Project Management
General Foundry Example of PERT/CPM
Uncertain activity duration (P14)
Uncertain activity duration (P14)
Managing Risk Chapter 7.
Presentation transcript:

PERT/CPM F G A E H I J K D St T B C Reconsider Prob. 10.2.1, Christine has done more detailed planning for this project and so now has the follow expanded activity list: Construct the new project network. F G A E H I J K D St T B C

Alfred Lowenstein is the president of the research division for Better Health, Inc., a major pharmaceutical company. His most important project coming up is the development of a new drug to combat AIDS. He has identified 10 groups in his division which will need to carry out different phases of this research and development project. Referring to the work to be done by the respective groups as activities A, B, . . . . , J, the precedence relationships for when these groups need to do their work are shown in the following project network. To beat the competition, Better Health’s CEO has informed Alfred that he wants the drug ready within 22 months if possible. Alfred knows very well that there is considerable uncertainty about how long each group will need to do its work. Using the PERT three-estimate approach, the manager of each group has provided a most likely estimate, an optimistic estimate, and a pessimistic estimate of the duration of that group’s activity. Using PERT formulas, these estimates now have been converted into estimates of the mean and variance of the probability distribution of the duration of each group’s activity, as given in the following table (after rounding to the nearest integer). Find the mean critical path for this project. Use this mean critical path to find the approximate probability that the project will be completed within 22 months.

[ES, EF] [LS, LF] 4 [1,4] 8 [5,12] 5 [13,17] 4 [9,12] 4 [5,8] [0,0] [18,18] 3 [10,12] 3 [7,9] 5 6 7 [14,18] [1,6] [7,13] Critical path = start to B to H to J to Finish = 18 months Variance along that path = 10 + 14 + 7 = 31