Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.

Slides:



Advertisements
Similar presentations
Chapter 3. HVAC Delivery Systems
Advertisements

BUILDING AIR CONDITIONING
Heating, Ventilating, and Air-Conditioning
CON 4003 Construction Estimating Prof R. V. Locurcio.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY. “Air conditioning is the control of the humidity of air by either increasing or decreasing its moisture content.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
ART 2640, Building Systems of Interior Environments Fall Semester 2014 Tuesdays & Thursdays 9:00-10:20 Grover Center W314 Matthew Ziff, Associate Professor.
Lecture Objectives: Finish wit introduction of HVAC Systems Introduce major ES software.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Lecture Objectives: Final discussion about HW3 Introduce more final project topics Continue with HVAC Systems.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
N O R T H A M E R I C A C O M M E R C I A L TDP
Lecture Objectives: Finish with software intro HVAC Systems
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Section 3 Using Heat.
Facilities Management and Design Chapter 7 HVAC Systems.
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Lecture Objectives: -Discus Final Project -Learn about Solar Systems -HW3 (final HW assignment) -HVAC system.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
Announcement Course Exam: Next class: November 3rd In class: 90 minutes long Examples are posted on the course website.
Final Project Format and Deliverables Examples
Final Project I need your proposal about the final project! It should include –Title –Group members –Objective –Short description –Methodology –Expected.
Lecture Objectives: Review Psychrometrics Introduce Air Handling Unit
Lecture Objectives: Learn about detailed vs. empirical modeling Discuss accuracy of energy modeling Introduce life-cycle cost analysis –integrated in eQUEST.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
LEVEL 4 BUILDING SERVICES TRAINING Level 3 Re-cap Cooling Systems looked at within Level 3 included; –Through-the-wall packages –Individual reversible.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Discuss Final Project
Objectives Finish analysis of most common HVAC Systems
We need to decide about the time for the final project presentation
ZONING (see section 17.0) Zoning alternatives Constant Volume (CV)
Lecture Announcement Developing Concrete with a Structural and Thermal Insulation Performance and Homogenous and Stratified Approach Dr. Mauricio Lopez.
Heating, Ventilating, and Air Conditioning
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Finish with HVAC systems
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Answer questions related to HW 4
Heating, Ventilating, and Air-Conditioning
Chapter 11: DESCRIPTION OF HVAC SYSTEMS
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY
Objectives Discuss Project 1 (eQUEST) Learn about HVAC Systems
October 31st In class test!
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Review Psychrometrics Introduce Air Handling Unit
Lecture Objectives: Discuss HW4 parts
FBE03: Building Construction & Science
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Chapter 11: DESCRIPTION OF HVAC SYSTEMS
Presentation transcript:

Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems

Building HVAC Systems (Primary and Secondary Building Systems) AHU Building envelope Cooling (chiller) (or Gas) Electricity Gas Heating (boilers) Fresh air For ventilation Distribution systems Air transport Secondary systems Primary systems AHU – Air Handling Unit HVAC systems affect the energy efficiency of the building as much as the building envelope

Air-conditioning in Air Handling Unit (AHU) Compressor and Condenser Roof top AHU Gas/Electric Heater to building Fan air from building fresh air Evaporator filter mixing hot water cool water Return fan Supply fan flow control dampers AHU Fresh air AHU schematic Outdoor air To room ExhaustFrom room

Processes in AHU presented in Psychrometric in psychrometric OA Case for Summer in Austin IA MA SA

Refrigeration Cycle T outdoor air T cooled water Cooling energy (evaporator) Released energy (condenser) - What is COP? - How the outdoor air temperature affects chiller performance?

Integration of HVAC and building physics models Building Heating/Cooling System Plant Building Heating/Cooling System Plant Load System Plant model Integrated models Q buiolding Q including Ventilation and Dehumidification

Example of System Models: Schematic of simple air handling unit (AHU) m - mass flow rate [kg/s], T – temperature [C], w [kg moist /kg dry air ], r - recirculation rate [-], Q energy/time [W] Mixing box

Energy and mass balance equations for Air handling unit model – steady state case m S is the supply air mass flow rate c p - specific capacity for air, T R is the room temperature, T S is the supply air temperature. w R and w S are room and supply humidity ratio - energy for phase change of water into vapor The energy balance for the room is given as: The air-humidity balance for room is given as: The energy balance for the mixing box is: ‘r’ is the re-circulated air portion, T O is the outdoor air temperature, T M is the temperature of the air after the mixing box. The air-humidity balance for the mixing box is: w O is the outdoor air humidity ratio and w M is the humidity ratio after the mixing box The energy balance for the heating coil is given as: The energy balance for the cooling coil is given as:

Non-air system Radiant panel heat transfer model

The total cooling/heating load in the room The energy extracted/added by air system The energy extracted/added by the radiant panel: T he radiant panel energy is: The energy extracted/added by the radiant panel is the sum of the radiative and convective parts:

eQUEST HVAC Models Predefined configuration (no change) Divided according to the cooling and heating sources Details in e quest help file: For example: DX CoilsNo Heating –Packaged Single Zone DX (no heating) Packaged single zone air conditioner with no heating capacity, typically with ductwork. –Split System Single Zone DX (no heating) Central single zone air conditioner with no heating, typically with ductwork. System has indoor fan and cooling coil and remote compressor/condensing unit. –Packaged Terminal AC (no heating) Packaged terminal air conditioning unit with no heating and no ductwork. Unit may be window or through-wall mounted. –Packaged VAV (no heating) DX CoilsFurnace Packaged direct expansion cooling system with no heating capacity. System includes a variable volume, single duct fan/distribution system serving multiple zones each with it's own thermostatic control. –Packaged Single Zone DX with Furnace Central packaged single zone air conditioner with combustion furnace, typically with ductwork. –Split System Single Zone DX with Furnace Central single zone air conditioner with combustion furnace, typically with ductwork. System has indoor fan and cooling coil and remote compressor/condensing unit. –Packaged Multizone with Furnace Packaged direct expansion cooling system with combustion furnace. System includes a constant volume fan/distribution system serving multiple zones, each with its own thermostat. Warm and cold air are mixed for each zone to meet thermostat control requirements.