Horst Breuker Review Oct 15 2013 ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
ALPHA Project Safety Assessment Document Vladimir Anferov.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
1 User’s perspectives on the management of Elements Important for Safety (EIS) AMMW - CERN Anne Funken, Marc Tavlet / BE-ASR-SU.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 1. Some recent views ( ) 2 Linac tunnel
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
The Stripping Foil Test Stand in the Linac4 Transfer Line
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
ELENA installation progress F. Butin / ELENA collaboration.
ELENA Integration F. Butin / ELENA collaboration.
The Next Generation of a Gamma Irradiation Facility GIF++
LIU / HL-LHC Cost and Schedule Review
Vacuum System P. Chiggiato TE-VSC
East Area Renovation Project Team meeting # 2 – EDMS News
Dielectric Oil Installations
ELENA installation and commissioning status
Safety Documentation EHN1
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
ELENA Beam Transfer Workpackage
Buffer Zones - Status Report
East Area Renovation Project team #6 Launch safety agreement
Beam Dump g. mornacchi.
The ELENA Safety Documentation «time to prepare the safety clearance»
Radiation Protection for the Beam Line 4 Schools project
Andreas Jansson, Lali Tchelidze
Updates on ESS Handbook for Radiation Protection
ELENA Extra Low ENergy Antiproton Ring
Radiation Protection Handbook
Access Control for CERN Experimental Areas
East Hall under construction
Safety in the East Area Renovation Project
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk Analysis); Operational, Record (Experience, Monitoring); AD EDMS /1; ELENA EDMS (Draft); Supported by EN Dep. (Ch. Alanzeau, J. Pedersen); Supervised by HSE Unit.

Horst Breuker Review Oct

ELENA and its Experiments Hexagonal Machine (30 m) inside the AD Hall to further decelerate the pbar Beam; Every 100 sec 3*10**7 pbar in 4 bunches at a spacing of 1 microsec (E = 100 keV); Run up to 4 Experiments simultaneously; ALPHA, ASACUSA, ATRAP, AEgIS (setting up), Gbar (new), BASE (new); AD Operation in 2012 : Switching between 4 Experiments (every 8 hours; 1 Exp. on hold for 1 week; day to night switch during weekends). Horst Breuker Review Oct

General Safety The construction, commissioning, operation and eventual dismantling of ELENA will obey the standard CERN safety rules and regulations applicable at any point in time during the lifecycle of the project and the facility. Horst Breuker Review Oct

Safety Provisions for TDR 1) General Safety 2) Radiation Safety Aspects 3) Interlock Systems (EIS) Horst Breuker Review Oct

General Safety Power supply and electrical distribution (Code C1 (EDMS ) Electrical Safety Code); Vacuum system (Code D2 (EDMS ) Safety Code for pressure vessels and pressurized pipelines ); Magnets NORMA / EDMS database; Radiofrequency equipments; Beam instrumentation; Compressed air supply; Handling devices and operations (Code D1 (EDMS ) Safety Code for Lifting Equipment); Horst Breuker Review Oct

General Safety continued Passageways, footbridges and platforms (Secondary Beam Areas (EDMS and ) Rules for Access in PS secondary beam areas); Emergency devices (alarms and evacuation); Fire protection system (Code I (EDMS )); Structure of the construction and its impact on the AD hall; Control room for ELENA (inside present AD control room; People at work (Personal Protective Equipment); Other generalities on HSE aspects (waste handling, environmental issues, foreseeable events). Horst Breuker Review Oct

Radiation Safety Aspects Supervised Secondary Beam Area with Controlled Access; FLUKA Simulation by R. Froeschl / RP (EDMS in preparation); Concrete Shielding around ELENA (0.8 x 2.4 m); Less than 3 micro Sievert / hour any point; No Access to exp. Area during Operation; Radiation Monitor (IG5 Chamber for fast Neutrons (connected to RAMSES)); ALARA (avoid permanent Workplaces); Buffer Zone for radiological characterization, traceability. Horst Breuker Review Oct

Dose Rate vs. Distance

Horst Breuker Review Oct Shielding

Interlock Systems (EIS) ELENA and exp. Areas secondary beam zones; One EIS (Element Important de Securite) per zone sufficient; 2 Options considered “fail-safe” : Modified Vacuum Valves as Stopper with 5 mm Stainless Steel (can also be dump); Veto on Power Supply Magnet; Circulating Beam inside ELENA can be stopped (BTV under study / design). Horst Breuker Review Oct

GBAR DE0 Primary areas: AD TARGET AD RING ELENA BASE BASE ASACUSA ASACUSA ATRAP3 ATRAP3 ATRAP4 ATRAP4 ALPHA ALPHA Source LINAC Upstream interlock 3 x AEgIS AEgIS 4 EIS-b LINAC 1, Design of Access & Interlocks by F. Butin and Team

Horst Breuker Review Oct General Layout Layout of AD / ELENA Experimental Areas

Horst Breuker Review Oct Experimental area name EIS-access EIS-beam protecting the area PPEPPX ELENA112 GBAR112 LINAC101 DE0111 BASE101 ASACUSA101 ATRAP3101 ATRAP4101 ALPHA111 AEgIS111 Interlocked Elements; PPE : Personal Protection Entry; PPX : Personal Protection eXit.

Outlook ELENA Safety File : We got started and made some progress but more work is needed; To understand specific subsystem safety issues we will contact the work package leaders; Thanks for your attention ! Horst Breuker Review Oct