THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.

Slides:



Advertisements
Similar presentations
Design of Steel Flexural Members
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advanced Flexure Design COMPOSITE BEAM THEORY SLIDES
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Thesis 2005 Cira Centre – Philadelphia Structural Redesign of Lateral Force Resisting System Andrew Kauffman Structural Option.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Hershey Academic Support Center Structural Option Shawn Jones Building Analysis of the Hershey Academic Support Center Hershey, PA Shawn Jones Structural.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Jurg Conzett – Traversina Bridge
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Mathew Nirenberg AE Senior Thesis Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Senior Thesis 2006 The Pennsylvania State University
Adam Love Structural Senior Thesis Presentation 2010 The Pennsylvania State University FDA OC/ORA Office Building Silver Spring, MD.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Structural Curriculum for Construction Management and Architecture Students 1 Prepared by: Ajay Shanker, Ph.D., P.E. Associate Professor Rinker School.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
General Comparison between AISC LRFD and ASD
Structural Systems Design for a Laramie Office Building
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System

OUTLINE Architectural Overview Architectural Overview Structural Overview Structural Overview Proposal Proposal Braced Frame Design Braced Frame Design Breadth – Cost Comparison Breadth – Cost Comparison Breadth – Redesign of Interior Space Breadth – Redesign of Interior Space Summary and Conclusion Summary and Conclusion References References Credits / Acknowledgements Credits / Acknowledgements

1150 Northbrook Drive, Philadelphia, PA

Architectural Overview 5 Stories – 74 ft high 5 Stories – 74 ft high 109,000 SF of Office Area 109,000 SF of Office Area Garage Garage Flexible Floor Layout Flexible Floor Layout Brick Brick Curtain Glass Wall Curtain Glass Wall Stone Tile Stone Tile Flat Roof Flat Roof

Building Statistics

STRUCTURAL SYSTEM 4 inch Concrete Slab 4 inch Concrete Slab 9/16” – 26 GA. UFS form deck 9/16” – 26 GA. UFS form deck Composite Steel Joist (26k7) Composite Steel Joist (26k7) Steel Composite Girders (W18x35) Steel Composite Girders (W18x35) Steel Columns (W24x68) Steel Columns (W24x68) Shallow Concrete Foundation Shallow Concrete Foundation

STRUCTURAL SYSTEM

Lateral Force Resisting System Moment Frame 150 Moment Connections per Story 150 Moment Connections per Story 750 Moment Connections in the Building 750 Moment Connections in the Building Roof - 15 ft-k moment capacity Roof - 15 ft-k moment capacity 3 rd Story – 30 ft-k moment capacity 3 rd Story – 30 ft-k moment capacity Garage – 2 nd Story – 40 ft-k moment capacity Garage – 2 nd Story – 40 ft-k moment capacity Typical Moment Connection

PROPOSAL Problem – Moment Connections are too expensive Problem – Moment Connections are too expensive Solution – Braced Frame System Solution – Braced Frame System

PROPOSAL MOMENT FRAME Flexible Floor layout Flexible Floor layout No abstractions No abstractions BRACED FRAME Cost efficient Cost efficient Simple connections Simple connections Greater stiffness Greater stiffness Smaller columns size in non- resisting frames Smaller columns size in non- resisting frames

BRACED FRAME DESIGN CONTROLLING LATERAL FORCES

BRACED FRAME DESIGN DISTRIBUTION OF LATERAL FORCES

BRACED FRAME DESIGN Design must preserve the flexibility of the original system Design must preserve the flexibility of the original system Diagonal braces are located in the frames with permanent walls Diagonal braces are located in the frames with permanent walls The design is symmetrical The design is symmetrical PLACEMENT OF BRACED FRAMES

BRACED FRAME DESIGN Relative Stiffness Analysis Relative Stiffness Analysis Center of Rigidity : (0, 82.6) ft Center of Rigidity : (0, 82.6) ft Polar Moment of Inertia = feet cubed Polar Moment of Inertia = feet cubed Distribution of Lateral Forces

BRACED FRAME DESIGN Case 1: Wind Parallel to Y axis Distribution of Lateral Forces

BRACED FRAME DESIGN Case 2: Wind Parallel to X axis Distribution of Lateral Forces

BRACED FRAME DESIGN Case 3: Wind at 45 degrees with the Y axis Distribution of Lateral Forces

BRACED FRAME DESIGN Force distribution equation: Distribution of Lateral Forces

BRACED FRAME DESIGN Distribution of Lateral Forces

BRACED FRAME DESIGN Distribution of Lateral Forces

BRACED FRAME DESIGN Distribution of Lateral Forces

BRACED FRAME DESIGN Distribution of Lateral Forces

BRACED FRAME DESIGN Distribution of Lateral Forces Axial Force in Each Member Braced Frame A

BRACED FRAME DESIGN Column Design LRFD Manual – Specifications section E-2 Braced Frame Columns Buckling about the y-y axis Most columns have increased in size

BRACED FRAME DESIGN Beam Design LRFD Manual – Specifications section I4 Combined Compression and Flexure in Composite Beams Plastic Moment Analysis Maximum Moment = wl 2 /8 Plastic Moment Capacity - LRFD Tables and by hand Deflection Check – Lower Bound Elastic Moment of Inertia Beams Sizes have not changed significantly

BRACED FRAME DESIGN Design of Diagonals LRFD Manual – Specifications section E-2 Flexural Forces due to self weight were ignored Buckling about the y-y axis

BRACED FRAME DESIGN Displacement Check

COST COMPARISON CM – Breadth Study MOMENT CONNECTION COST ESTIMATE Detailed Cost Estimate using RS Means 750 moment connections in the building Typical Moment Connection: 18 bolts and 60 inches of welding $8.05 per bolt $19.30 per linear ft of weld $25 for the angles Approximately $ per connection TOTAL $199,800

COST COMPARISON CM – Breadth Study REDESIGNED SYSTEM COST ESTIMATE RS Means Shear Connection in Braced Frame: 8 bolts and 72 inches of welding $ per braced connection $ per non-braced connection Total Cost of Connections: $118,182 Added weight of Steel: 48,870 lbs Steel - approximately $570 per ton Total cost of added Steel: $13,928 TOTAL cost of the braced system: $132,110

COST COMPARISON Moment Connections: $199,800 Moment Connections: $199,800 Braced Frame: $132,110 Braced Frame: $132,110 Difference: $67,690 (33%) Difference: $67,690 (33%) Columns in non-braced frames are expected to decrease in size, making the braced frame system even more cheaper. Columns in non-braced frames are expected to decrease in size, making the braced frame system even more cheaper. CM – Breadth Study Comparison

ARCHITECTURAL REDESIGN Braced Frame “G” blocks two handicap parking spaces Braced Frame “G” blocks two handicap parking spaces Breadth Study PROBLEM Braced Frame “C” is an obstacle in the electrical room Braced Frame “C” is an obstacle in the electrical room

ARCHITECTURAL REDESIGN Number of parking spaces should be reserved Number of parking spaces should be reserved Handicap parking spaces must have a loading area Handicap parking spaces must have a loading area Distance between new wall and existing column should be more than 56 inches (width of the doors) Distance between new wall and existing column should be more than 56 inches (width of the doors) Electrical Mechanical Systems Electrical Mechanical Systems Area should be approximately preserved Area should be approximately preserved POINTS OF CONSERNS

ARCHITECTURAL REDESIGN NEW DESIGN ELECRICAL ROOM

ARCHITECTURAL REDESIGN New handicap parking spaces New Design

ARCHITECTURAL REDESIGN New parking spaces NEW DESIGN

ARCHITECTURAL REDESIGN NEW DESIGN

SUMMARY Braced Frames can successfully resist the lateral forces Braced Frames can successfully resist the lateral forces Flexibility of the interior space layout is preserved, however, in some cases braced frames extend beyond the boundaries of permanent wall Flexibility of the interior space layout is preserved, however, in some cases braced frames extend beyond the boundaries of permanent wall Braced frames create an obstacle in the garage Braced frames create an obstacle in the garage Braced frame system is 33% more cost efficient Braced frame system is 33% more cost efficient In the process of architectural redesign one parking space is lost In the process of architectural redesign one parking space is lost

CONCLUSION Braced frame system is more feasible system for the North Brook Corporate Center if the following conditions are true: Braced frame system is more feasible system for the North Brook Corporate Center if the following conditions are true: 1. All calculations are accurate 2. Change to the interior space of the garage floor level is acceptable 3. Change in the flexibility of the interior space layout is insignificant relative to the cost of the system

REFERANCES

CREDITS AND ACKNOWLEDGEMENTS Thanks to AE faculty and staff who made my experience at Penn State enjoyable. Special Thanks to Dr. Louis F. Geschwinder M. Kevin Parfitt Dr. Ali Memari Thanks to my family and friends