Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

Set-Block Design Issues August 12 th, Frederickson Skin and Spar MBU Background  Set blocks are used to verify the distance between the bed of.
Cylinders in Vs An optomechanical methodology Opti 521 Tutorial Yuming Shen December 2006.
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.
US Bracket Support for Stave D. Lynn (BNL), LBNL Mechanical Meeting, Sep
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
BSC Cable Trays … again: Evaluation of an LLO Proposal for an Alternative Design G v31.
HFT Safety --PXL detector September 26, Dana Beavis.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Micromachining of Inertial Confinement Fusion Fast Ignition Targets Michael Mauldin.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
ATLAS Pixel Detector Pixel Support Tube Interfaces LBNL Internal PST Review E. Anderssen, LBNL.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Engineering Division 1 SSD Mechanics E Anderssen, H Matis, J Thomas LBNL S Bouvier, G Gouilloux Subatech.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Proposer: insert Panel Date: insert 0XXX: Mod Title: insert title Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
Engineering Division 1 Mechanical and Integration HFT CD0 25-February 2008, BNL Eric Anderssen, LBNL.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Fixed Target Program in STAR Fixed-target running allows much higher rates without e-cooling at lower energies Top of  B range now ~ 400 MeV; extends.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Berlin talk outline Draft 2 – 7 th March Introduction UK has recently started to systematically try and understand structural requirements and how.
1 The STAR Pixel Upgrade H. Wieman Heavy Quark Workshop LBNL 1-Nov-2007.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
03/22/2007HCal Electronics Meeting HO LIGHT GUIDE SIMULATIONS Justin Parsons, University of Iowa Jim Freeman, FNAL HO LIGHT GUIDE SIMULATIONS 1.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
R. Bradford 10 December, 2014 Sensor Details. Explanation Submitted some designs that will be included on the Novati/Tezzaron submission. Designs based.
Reported by G.Feofilov at the NA61 meeting , CERN, EVO.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
HFT-Beam Pipe D. Beavis BNL March 14, Overview Update on new Beam pipe –Assembly drawing –Material changes –Length changes Outlook 2 HFT F2F at.
Automated Machining Adv. MMP
Telecommunications JBCardenas © 1982 Com3 4Q1516 Antenna Design JBC © 198 v A2,2 Key design requirements 1.Undertake the theoretical computations of shapes.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
EC: 7 DISK concept Preliminary considerations
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
STRAW TRACKER SYSTEM CAD STATUS :
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
MACH 118: Lathe & Mill 1 Lathe Workholding.
Beam Pipe and Service Support Structure Production Progress
Presentation transcript:

Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL

Engineering Division Overview These are just ‘Cartoon CAD’ models Detail dimensions need to be worked out with West Cone/FGT While they are ‘cartoons’ I tried to get the right number of basic parts Fasteners other than glue are not included, but will indicate bolted/pinned joints Most parts similar to ATLAS Pixel Support Tube –Could build in short order after dimensions are finalized… –Should wait to assure IST/ISC/Pixels/FGT do not impose auxiliary constraints Neighboring parts cannot lag by more than one CD… 2

Engineering Division Cut Apart Current Cones next Summer Old East Cone and most of Beams to be reused to support New West Cone Old West cone refurbished into New East Cone in Berkeley Cut location in Carbon Beam away from Al Insert—details later Should probably cut more accurately than indicated… 3 Send to BerkeleyKeep at Brookhaven

Engineering Division Modified East Cone View as Temporary Fix—Should be ACAP (as cheap as possible) –Supports end of New West Cone/FGT –Replicates Old Beam Pipe Interfaces –Includes SSD if required –Only for summer ’08 to ‘09 Wholly Machined/Bonded Solution –Tooling to locate Buck Plate while bonding is required… Buck Plate aimed for Easy Swap of replacement Some Tooling Required… ~1.5m

Engineering Division Make a Low Mass ‘Buck Plate’ Coupling Insert reduces risk of large complex machined plate –Quicker to modify smaller part if needed… Insert can take up mis-match in geometry of current Beam and match to ‘perfect geometry’ of machined plate (bonded) Plate includes SVT mounts and all other interfaces of current plate, Machined directly into features Mass Approx Equal to current Plate Beam Plate Coupling Insert Needs to include Beam Pipe Mount And other interfaces

Engineering Division Plate Needs to Make up Cut Lengths Lengths just guessed—need FGT/West Cone to do better Cut placed just past insert—easier to cut, cleaner bond May need to find way to couple to outer skin of Beam –Not done with current Beam

Engineering Division Goal—Swap-in Replacement Should Be Same Length New East Cone with Cylindrical Shell made from Old West Cone Swap in by matching Bolted Interface to New West Cone… Modification Will Take Up Length… Include SSD interface On Shell

Engineering Division Old West Cone Modification--Flanges Cut Back Length Determined by MFG Radii of new Flanges—also allowance for Bolt Flange Radii

Engineering Division Flange on New East Cone Auxiliary Goal of Flange Two-Fold –New Interface to Cone (remove old BP Interface Plate) –Use Same Tool for large cylinder of IST and Intra-Cone Cylinder (SSD Support Shell) Small Taper Angle necessitated larger cut back –Still only 120mm—easy to make shells shorter/longer with same tool Gap or Standoffs for IST Services Needed R

Engineering Division Some Cost Benefit Analysis Cost of Re-use of (ye) Olde East Cone is a good bet –Need something to support FGT and BP for Run 9 (10?) –Minimal Mod, Tooling and Part count to use old Cone and beams –Likely under $25k parts/tool—just labor to bond at BNL IST needs a large Cylinder –Intra-Cone Cylinder only marginal cost of fabrication if same diameter –Flange Tooling similar, additional design work minimal Cost of Re-Using old West Cone uncertain—it is a Renovation –Geometry may be uncertain enough to cause refab of tooling –Risk of Damage during trim to new length—errors/damage may need again more tooling Should investigate marginal cost of making New East Cone using West Cone Tooling –Tooling costed in FGT—only cost of part fab –Balance against cost/risk of old west cone renovation 10

Engineering Division Proposal/Conclusion Baseline should be what is outlined here –Modified East Cone with requirement for bolt-in swap –Modified West-Cone as new East Structure Would like agreement (decision) on this as the approach –Main requirement here is common bolted interface and quickly reaching length-and diameter interfaces –Allows Detailed cost studies to proceed This Gives FGT and the NWC a clear interface to meet as early as possible –Simple mechanical interface—lengths and Bolt Circles are easy to track even when they change… Keep open the issue of how the New East Cone is implemented –Proposed baseline has its risks –New West Cone may be an attractive option over refurbishing Old West Cone –This should be the ‘backup’ solution—still need to understand what it looks like/costs 11